230 resultados para Grantham Railway
Resumo:
This project advances the knowledge of rail wear and crack formation due to rail/wheel contact in Australian heavy-haul railway lines. This comprehensive study utilised numerous techniques including: simulation using a twin-disk test-rig, scanning electron microscope particle analysis and finite element modeling for material failure prediction. Through this work, new material failure models have been developed which may be used to predict the lifetime and reliability of materials undergoing severe contact conditions.
Resumo:
This project advances the current understanding of intraurban rail passengers and their travel experiences to help rail industry leaders tailor policy approaches to fit specific, relevant segments of their target population. Using a Q-sorting technique and cluster analysis, preliminary research identified five perspectives occurring in a small sample of rail passengers who varied in their frequency and location of rail travel as well as certain sociodemographic characteristics. Revealed perspectives (named to capture the gist of their content) included "Rail travel is about the destination, not the journey"; "Despite challenges, public transport is still the best option"; "Rail travel is fine"; "Rail travel? So far, so good"; and "Bad taste for rail travel." This paper discusses each of the perspectives in detail and considers them in relation to tailored policy implications. An overarching finding from this study is that improving railway travel access requires attention to physical, psychological, financial, and social facets of accessibility. For example, designing waiting areas to be more socially functional and comfortable has the potential to increase ridership by addressing social forms of access, decreasing perceived wait times, and making time at the station feel like time well spent. Even at this preliminary stage, the Q-sorting technique promises to provide a valuable, holistic, albeit fine-grained, analysis of passenger attitudes and experiences that will assist industry efforts in increasing ridership.
Resumo:
The production of a two hour show "Who Are You" which which began touring Australia and Asia in 2012.
Resumo:
Of all the stories to emerge from Queensland’s catastrophic summer of 2011, the most dramatic and starkly tragic were those that took place in Toowoomba and the Lockyer Valley. On January 10, 2011, after weeks of heavy rain and as floodwaters began to overwhelm much of south-east Queensland, an ‘inland tsunami’ hit the city of Toowoomba, the rural districts of Spring Bluff and Postmans Ridge, and the towns of Murphys Creek, Withcott, Helidon, and Grantham. The Torrent:Toowoomba and the Lockyer Valley, 10 January 2011 tells, for the first time, the extraordinary stories of survival and loss that emerged from that terrible day. Official figures state that twenty-four people died. Many escaped death only because they were rescued by members of the community or through sheer good fortune. Based on exclusive interviews with survivors, rescuers and with the families and friends of victims of the disaster, The Torrent is a unique and powerful account of human courage in the face of the devastating force of nature, and the enduring resilience of ordinary Australians.
Resumo:
Original Staged Music Performance incorporating Projected Sand Art and Narrator at Woodford Festival 2013
Resumo:
DeepBlue is much more than just an orchestra. Their innovative approach to audience engagement led it to develop ESP, their Electronic Show Programme web app which allows for real-time (synchronous) and delayed (asynchronous) audience interaction, customer feedback and research. The show itself is driven invisibly by a music technology operating system (currently QUT's Yodel) that allows them to adapt to a wide range of performance venues and varied types of presentation. DeepBlue's community engagement program has enabled over 5,500 young musicians and community choristers to participate in professional productions, it is also a cornerstone of DeepBlue's successful business model. You can view the ESP mobile web app at m.deepblue.net.au if you view this and only the landing page is active, there is not a show taking place or imminent. ESP prototype has already been used for 18 months. Imagine knowing what your audience really thinks – in real time so you can track their feelings and thoughts through the show. This tool has been developed and used by the performing group DeepBlue since late 2012 in Australia and Asia (even translated into Vietnamese). It has mostly superseded DeepBlue's SMS realtime communication during a show. It enables an event presenter or performance group to take the pulse of an audience through a series of targeted questions that can be anonymous or attributed. This will help build better, long-lasting, and more meaningful relationships with groups and individuals in the community. This can take place on a tablet, mobile phone or future platforms. There are three organisations trialling it so far.
Resumo:
This research analyses the extent of damage to buildings in Brisbane, Ipswich and Grantham during the recent Eastern Australia flooding and explore the role planning and design/construction regulations played in these failures. It highlights weaknesses in the current systems and propose effective solutions to mitigate future damage and financial loss under current or future climates. 2010 and early 2011 saw major flooding throughout much of Eastern Australia. Queensland and Victoria were particularly hard hit, with insured losses in these states reaching $2.5 billion and many thousands of homes inundated. The Queensland cities of Brisbane and Ipswich were the worst affected; around two-thirds of all inundated property/buildings were in these two areas. Other local government areas to record high levels of inundation were Central Highlands and Rockhampton Regional Councils in Queensland, and Buloke, Campaspe, Central Gold Fields and Loddon in Victoria. Flash flooding was a problem in a number of Victorian councils, but the Lockyer Valley west of Ipswich suffered the most extensive damage with 19 lives lost and more than 100 homes completely destroyed. In all more than 28,000 properties were inundated in Queensland and around 2,500 buildings affected in Victoria. Of the residential properties affected in Brisbane, around 90% were in areas developed prior to the introduction of floodplain development controls, with many also suffering inundation during the 1974 floods. The project developed a predictive model for estimating flood loss and occupant displacement. This model can now be used for flood risk assessments or rapid assessment of impacts following a flood event.
Resumo:
In spite of the extensive usage of continuous welded rails, a number of rail joints still exist in the track. Although a number of them exist as part of turnouts in the yards where the speed is not of concern, the Insultated Rail Joints (IRJs) that exist in ballasted tracks remain a source of significant impact loading. A portion of the dynamic load generated at the rail joints due to wheel passage is transmitted to the support system which leads to permanent settlements of the ballast layer with subsequent vertical misalignment of the sleepers around the rail joints. The vertical misalignment of the adjacent sleepers forms a source of high frequency dynamic load raisers causing significant maintenance work including localised grinding of railhead around the joint, re-alignment of the sleepers and/or ballast tamping or track component renewals/repairs. These localised maintenance activities often require manual inspections and disruptions to the train traffic loading to significant costs to the rail industry. Whilst a number of studies have modelled the effect of joints as dips, none have specifically attended to the effect of vertical misalignment of the sleepers on the dynamic response of rail joints. This paper presents a coupled finite element track model and rigid body track-vehicle interaction model through which the effects of vertical of sleepers on the increase in dynamic loads around the IRJ are studied. The finite element track model is employed to determine the generated dip from elastic deformations as well as the vertical displacement of sleepers around the joint. These data (dip and vertical misalignments) are then imported into the rigid body vehicle-track interaction model to calculate the dynamic loads.
Resumo:
Differential settlement at the bridge approach between the deck and rail track on ground is often considered as a source of challenging technical and economical problem. This caused by the sudden stiffness changes between the bridge deck and the track on ground, and changes in soil stiffness of backfill and sub-grade with soil moisture content and loading history. To minimise the negative social and economic impacts due to poor performances of railway tracks at bridge transition zones, it is important, a special attention to be given at design, construction and maintenance stages. It is critically challenging to obtain an appropriate design solution for any given site condition and most of the existing conventional design approaches are unable to address the actual on-site behaviour due to their inherent assumptions of continuity and lack of clarifying of the local effects. An evaluation of existing design techniques is considered to estimate their contributions to a potential solution for bridge transition zones. This paper analyses five different approaches: the Chinese Standard, the European Standard with three different approaches, and the Australian approach. Each design approach is used to calculate the layer thicknesses, accounting critical design features such as the train speed, the axle load, the backfill subgrade condition, and the dynamic loading response. Considering correlation between track degradation and design parameters, this paper concludes that there is still a need of an optimised design approach for bridge transition zones.
Resumo:
Railhead is perhaps the highest stressed civil infrastructure due to the passage of heavily loaded wheels through a very small contact patch. The stresses at the contact patch cause yielding of the railhead material and wear. Many theories exist for the prediction of these mechanisms of continuous rails; this process in the discontinuous rails is relatively sparingly researched. Discontinuous railhead edges fail due to accumulating excessive plastic strains. Significant safety concern is widely reported as these edges form part of Insulated Rail Joints (IRJs) in the signalling track circuitry. Since Hertzian contact is not valid at a discontinuous edge, 3D finite element (3DFE) models of wheel contact at a railhead edge have been used in this research. Elastic–plastic material properties of the head hardened rail steel have been experimentally determined through uniaxial monotonic tension tests and incorporated into a FE model of a cylindrical specimen subject to cyclic tension load- ing. The parameters required for the Chaboche kinematic hardening model have been determined from the stabilised hysteresis loops of the cyclic load simulation and imple- mented into the 3DFE model. The 3DFE predictions of the plastic strain accumulation in the vicinity of the wheel contact at discontinuous railhead edges are shown to be affected by the contact due to passage of wheels rather than the magnitude of the loads the wheels carry. Therefore to eliminate this failure mechanism, modification to the contact patch is essential; reduction in wheel load cannot solve this problem.
Resumo:
The preventive maintenance of traction equipment for Very High Speed Trains (VHST) nowadays is becoming very expensive owing to the high complexity and quality of these components that require high reliability. An efficient maintenance approach like the Condition-Based Maintenance (CBM) should be implemented to reduce the costs. For this purpose, an experimental full-scale test rig for the CBM of VHST traction equipment has been designed to investigate in detail failures in the main mechanical components of system, i.e. motor, bearings and gearbox. The paper describes the main characteristics of this unique test rig, able to reproduce accurately the train operating conditions, including the relative movements of the motor, the gearbox and the wheel axle. Gearbox, bearing seats and motor are equipped by accelerometers, thermocouples, torque meter and other sensors in different positions. The testing results give important information about the most suitable sensor position and type to be installed for each component and show the effectiveness of the techniques used for the signal analysis in order to identify faults of the gearbox and motor bearings.
Resumo:
Safety at railway level crossings (RLX) is one part of a wider picture of safety within the whole transport system. Governments, the rail industry and road organisations have used a variety of countermeasures for many years to improve RLX safety. New types of interventions are required in order to reduce the number of crashes and associated social costs at railway crossings. This paper presents the results of a large research program which aimed to assess the effectiveness of emerging Intelligent Transport Systems (ITS) interventions, both on-road and in-vehicle based, to improve the safety of car drivers at RLXs in Australia. The three most promising technologies selected from the literature review and focus groups were tested in an advanced driving simulator to provide a detailed assessment of their effects on driver behaviour. The three interventions were: (i) in-vehicle visual warning using a GPS/smartphone navigation-like system, (ii) in-vehicle audio warning and; (iii) on-road intervention known as valet system (warning lights on the road surface activated as a train approaches). The effects of these technologies on 57 participants were assessed in a systematic approach focusing on the safety of the intervention, effects on the road traffic around the crossings and driver’s acceptance of the technology. Given that the ITS interventions were likely to provide a benefit by improving the driver’s awareness of the crossing status in low visibility conditions, such conditions were investigated through curves in the track before arriving at the crossing. ITS interventions were also expected to improve driver behaviour at crossings with high traffic (blocking back issue), which were also investigated at active crossings. The key findings are: (i) interventions at passive crossings are likely to provide safety benefits; (ii) the benefits of ITS interventions on driver behaviour at active crossings are limited; (iii) the trialled ITS interventions did not show any issues in terms of driver distraction, driver acceptance or traffic delays; (iv) these interventions are easy to use, do not increase driver workload substantially; (v) participants’ intention to use the technology is high and; (vi) participants saw most value in succinct messages about approaching trains as opposed to knowing the RLX locations or the imminence of a collision with a train.
Resumo:
This paper describes a safety data recording and analysis system that has been developed to capture safety occurrences including precursors using high-definition forward-facing video from train cabs and data from other train-borne systems. The paper describes the data processing model and how events detected through data analysis are related to an underlying socio-technical model of accident causation. The integrated approach to safety data recording and analysis insures systemic factors that condition, influence or potentially contribute to an occurrence are captured both for safety occurrences and precursor events, providing a rich tapestry of antecedent causal factors that can significantly improve learning around accident causation. This can ultimately provide benefit to railways through the development of targeted and more effective countermeasures, better risk models and more effective use and prioritization of safety funds. Level crossing occurrences are a key focus in this paper with data analysis scenarios describing causal factors around near-miss occurrences. The paper concludes with a discussion on how the system can also be applied to other types of railway safety occurrences.
Resumo:
The problem of modal choice between rail and air arises as public awareness of carbon dioxide (CO2) emissions by the transportation sector rises. In this paper, we answer this question quantitatively by performing an efficiency benchmarking analysis that takes into account life-cycle CO2 emission due to transport service provision. The paper employs nonparametric efficiency estimation methods, namely a slacks-based inefficiency measure, as well as a more conventional directional distance function approach. We apply them to a panel data set for three major railway companies and the aviation sector in Japan for the period from 1999 to 2007. Results shows that, contrary to the common argument, air transport can still be more socially efficient than rail transport, even when the environmental load due to CO2 emission is incorporated. This is due to the aviation sector's extremely low user cost, measured in terms of in-vehicle time. In other words, aviation is a necessary transportation mode for those with a very high willingness to pay for their time.
Resumo:
This paper investigates the adverse effects of familiarity and human factors issues associated with the reliability of low-cost warning devices at level crossings. The driving simulator study featured a repetitive, low workload, monotonous driving task in which there were no failures of the level crossing (control) or prolonged or intermittent right-side failures (where the device reverts to a safe failure mode). The results of the experiment provided mixed support for the familiarity hypothesis. Four of the 23 participants collided with the train when it first appeared on trial 10 but safety margins increased from the first train to the next presentation of a train (trial 12). Contrary to expectations, the safety margins decreased with repeated right-side failure only for the intermittent condition. The limited head movement data showed that participants in the prolonged failure condition were more likely to turn their head to check for trains in the right-side failure trials than in earlier trials where there was no signal and no train. Few control participants turned their head to check for trains when no signal was presented. This research highlights the need to consider repetitive tasks and workload in experimental design and accident investigation at railway level crossings.