535 resultados para Arts based literacy project


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Realistic estimates of short- and long-term (strategic) budgets for maintenance and rehabilitation of road assessment management should consider the stochastic characteristics of asset conditions of the road networks so that the overall variability of road asset data conditions is taken into account. The probability theory has been used for assessing life-cycle costs for bridge infrastructures by Kong and Frangopol (2003), Zayed et.al. (2002), Kong and Frangopol (2003), Liu and Frangopol (2004), Noortwijk and Frangopol (2004), Novick (1993). Salem 2003 cited the importance of the collection and analysis of existing data on total costs for all life-cycle phases of existing infrastructure, including bridges, road etc., and the use of realistic methods for calculating the probable useful life of these infrastructures (Salem et. al. 2003). Zayed et. al. (2002) reported conflicting results in life-cycle cost analysis using deterministic and stochastic methods. Frangopol et. al. 2001 suggested that additional research was required to develop better life-cycle models and tools to quantify risks, and benefits associated with infrastructures. It is evident from the review of the literature that there is very limited information on the methodology that uses the stochastic characteristics of asset condition data for assessing budgets/costs for road maintenance and rehabilitation (Abaza 2002, Salem et. al. 2003, Zhao, et. al. 2004). Due to this limited information in the research literature, this report will describe and summarise the methodologies presented by each publication and also suggest a methodology for the current research project funded under the Cooperative Research Centre for Construction Innovation CRC CI project no 2003-029-C.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Designing and estimating civil concrete structures is a complex process which to many practitioners is tied to manual or semi-manual processes of 2D design and cannot be further improved by automated, interacting design-estimating processes. This paper presents a feasibility study for the development an automated estimator for concrete bridge design. The study offers a value proposition: an efficient automated model-based estimator can add value to the whole bridge design-estimating process, i.e., reducing estimation errors, shortening the duration of success estimates, and increasing the benefit of doing cost estimation when compared with the current practice. This is then followed by a description of what is in an efficient automated model-based estimator and how it should be used. Finally the process of model-based estimating is compared with the current practice to highlight the values embedded in the automated processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The effective management of bridge stock involves making decisions as to when to repair, remedy, or do nothing, taking into account the financial and service life implications. Such decisions require a reliable diagnosis as to the cause of distress and an understanding of the likely future degradation. Such diagnoses are based on a combination of visual inspections, laboratory tests on samples and expert opinions. In addition, the choice of appropriate laboratory tests requires an understanding of the degradation mechanisms involved. Under these circumstances, the use of expert systems or evaluation tools developed from “realtime” case studies provides a promising solution in the absence of expert knowledge. This paper addresses the issues in bridge infrastructure management in Queensland, Australia. Bridges affected by alkali silica reaction and chloride induced corrosion have been investigated and the results presented using a mind mapping tool. The analysis highights that several levels of rules are required to assess the mechanism causing distress. The systematic development of a rule based approach is presented. An example of this application to a case study bridge has been used to demonstrate that preliminary results are satisfactory.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An estimation of costs for maintenance and rehabilitation is subject to variation due to the uncertainties of input parameters. This paper presents the results of an analysis to identify input parameters that affect the prediction of variation in road deterioration. Road data obtained from 1688 km of a national highway located in the tropical northeast of Queensland in Australia were used in the analysis. Data were analysed using a probability-based method, the Monte Carlo simulation technique and HDM-4’s roughness prediction model. The results of the analysis indicated that among the input parameters the variability of pavement strength, rut depth, annual equivalent axle load and initial roughness affected the variability of the predicted roughness. The second part of the paper presents an analysis to assess the variation in cost estimates due to the variability of the overall identified critical input parameters.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

One of the key issues facing public asset owners is the decision of refurbishing aged built assets. This decision requires an assessment of the “remaining service life” of the key components in a building. The remaining service life is significantly dependent upon the existing condition of the asset and future degradation patterns considering durability and functional obsolescence. Recently developed methods on Residual Service Life modelling, require sophisticated data that are not readily available. Most of the data available are in the form of reports prior to undertaking major repairs or in the form of sessional audit reports. Valuable information from these available sources can serve as bench marks for estimating the reference service life. The authors have acquired similar informations from a public asset building in Melbourne. Using these informations, the residual service life of a case study building façade has been estimated in this paper based on state-of-the-art approaches. These estimations have been evaluated against expert opinion. Though the results are encouraging it is clear that the state-of-the-art methodologies can only provide meaningful estimates provided the level and quality of data are available. This investigation resulted in the development of a new framework for maintenance that integrates the condition assessment procedures and factors influencing residual service life

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Real-World Data Mining Applications generally do not end up with the creation of the models. The use of the model is the final purpose especially in prediction tasks. The problem arises when the model is built based on much more information than that the user can provide in using the model. As a result, the performance of model reduces drastically due to many missing attributes values. This paper develops a new learning system framework, called as User Query Based Learning System (UQBLS), for building data mining models best suitable for users use. We demonstrate its deployment in a real-world application of the lifetime prediction of metallic components in buildings

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper describes an extended case-based reasoning model that addresses the notion of situatedness in designing through constructive memory. The model is illustrated through an application for predicting the corrosion rate for a specific material on a specific building.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

As a functioning performing arts centre, commercial enterprise, tourist attraction and major national asset, Sydney Opera House must continue to demonstrate the optimal use and effectiveness of its facilities management (FM) to provide value for its stakeholders. To better achieve this, the Cooperative Research Centre for Construction Innovation focussed on the following three themes for investigation in the FM Exemplar Project — Sydney Opera House: digital modelling — developing a building information model capable of integrating information from disparate software systems and hard copy, and combining this with a spatial 3D computeraided design (CAD)/geographic information system (GIS) platform. This model offers a visual representation of the building and its component elements in 3D, and provides comprehensive information on each element. The model can work collaboratively through an open data exchange standard (common to all compliant software) in order to mine the data required to further FM objectives (such as maintenance) more efficiently and effectively. services procurement — developing a multi-criteria performance-based procurement framework aligned with organisational objectives for FM service delivery performance benchmarking — developing an FM benchmarking framework that enables facilities/ organisations to develop key performance indicators (KPIs) to identify better practice and improvement strategies. These three research stream outcomes were then aligned within the broader context of Sydney Opera House’s Total Asset Management (TAM) Plan and Strategic Asset Maintenance (SAM) Plan in arriving at a business framework aligned with, and in support of, organisational objectives. The Sydney Opera House is managed by the Sydney Opera House Trust on behalf of the Government of the State of New South Wales. Within the framework of the TAM Plan prepared in accordance with NSW Treasury Guidelines, the assimilation of these three themes provides an integrated FM solution capable of supporting Sydney Opera House’s business objectives and functional requirements. FM as a business enabler showcases innovative methods in improving FM performance, a better alignment of service and performance objectives and provides a better-practice model to support the business enterprise.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This study investigates the impact of the New Basics Project on teachers at a special school for students with intellectual impairments. The study is aimed at exploring the complex nature of the work of special educators as they enact the New Basics curriculum with a particular focus on the teachers’ opinions about challenges that arose for their curriculum, pedagogy and assessment practices. Attention is also paid to how the principal’s leadership supported the enactment of the New Basics in respect to what he did and why he used particular strategies. The nine teachers and their principal were involved in a series of in-depth, semi-structured interviews from one of only three special schools in phase one of the New Basics trial in Queensland, Australia. These interviews produced data from the special educators as they were confronted with a new curriculum that challenged their previous teaching practices. The enactment of the New Basics curriculum occurred within the context of a state-sanctioned mandate to provide alternative programs to those offered in mainstream schools, for students with special needs. This thesis explores these teachers' experiences using critical theory as a basis for analyzing their opinions on issues such as the role of the special educator, tensions between old and new curricula, pedagogical and assessment practices, and connections between the at-school learning experiences for intellectually impaired students and the realities of post-school life. The investigation also examines the leadership conduct of the principal in changing times at the school. The findings suggest that the New Basics has played a significant role in providing structures for developing communities of practice amongst teachers; in supporting special educators to focus more on the educational needs of the students (e.g., literacy, numeracy, financial planning) and less on their medical needs (e.g., toileting, feeding, personal hygiene); and supporting school leadership that empowers and listens critically to teachers as essential components of the successful enactment of curriculum reforms like the New Basics.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The implementation of effective science programmes in primary schools is of continuing interest and concern for professional developers. As part of the Australian Academy of Science's approach to creating an awareness of Primary Investigations, a project team trialled a series of satellite television broadcasts of lessons related to two units of the curriculum for Year 3 and 4 children in 48 participating schools. The professional development project entitled Simply Science, included a focused component for the respective classroom teachers, which was also conducted by satellite. This paper reports the involvement of a Year 4 teacher in the project and describes her professional growth. Already an experienced and confident teacher, no quantitative changes in science teaching self efficacy were detected. However, her pedagogical content knowledge and confidence to teach science in the concept areas of matter and energy were enhanced. Changes in the teacher's views about the co-operative learning strategies espoused by Primary Investigations were also evident. Implications for the design of professional development programmes for primary science teachers are discussed.