192 resultados para Aeroelascity, Optimization, Uncertainty
Resumo:
Changing the topology of a railway network can greatly affect its capacity. Railway networks however can be altered in a multitude of different ways. As each way has significant immediate and long term financial ramifications, it is a difficult task to decide how and where to expand the network. In response some railway capacity expansion models (RCEM) have been developed to help capacity planning activities, and to remove physical bottlenecks in the current railway system. The exact purpose of these models is to decide given a fixed budget, where track duplications and track sub divisions should be made, in order to increase theoretical capacity most. These models are high level and strategic, and this is why increases to the theoretical capacity is concentrated upon. The optimization models have been applied to a case study to demonstrate their application and their worth. The case study evidently shows how automated approaches of this nature could be a formidable alternative to current manual planning techniques and simulation. If the exact effect of track duplications and sub-divisions can be sufficiently approximated, this approach will be very applicable.
Resumo:
Work ability describes employees' capability to carry out their work with respect to physical and psychological job demands. This study investigated direct and interactive effects of age, job control, and the use of successful aging strategies called selection, optimization, and compensation (SOC) in predicting work ability. We assessed SOC strategies and job control by using employee self-reports, and we measured employees' work ability using supervisor ratings. Data collected from 173 health-care employees showed that job control was positively associated with work ability. Additionally, we found a three-way interaction effect of age, job control, and use of SOC strategies on work ability. Specifically, the negative relationship between age and work ability was weakest for employees with high job control and high use of SOC strategies. These results suggest that the use of successful aging strategies and enhanced control at work are conducive to maintaining the work ability of aging employees. We discuss theoretical and practical implications regarding the beneficial role of the use of SOC strategies utilized by older employees and enhanced contextual resources at work for aging employees.
Resumo:
This study investigated within-person relationships between daily problem solving demands, selection, optimization, and compensation (SOC) strategy use, job satisfaction, and fatigue at work. Based on conservation of resources theory, it was hypothesized that high SOC strategy use boosts the positive relationship between problem solving demands and job satisfaction, and buffers the positive relationship between problem solving demands and fatigue. Using a daily diary study design, data were collected from 64 administrative employees who completed a general questionnaire and two daily online questionnaires over four work days. Multilevel analyses showed that problem solving demands were positively related to fatigue, but unrelated to job satisfaction. SOC strategy use was positively related to job satisfaction, but unrelated to fatigue. A buffering effect of high SOC strategy use on the demands-fatigue relationship was found, but no booster effect on the demands-satisfaction relationship. The results suggest that high SOC strategy use is a resource that protects employees from the negative effects of high problem solving demands.
Resumo:
The concept of focus on opportunities describes how many new goals, options, and possibilities employees believe to have in their personal future at work. This study investigated the specific and shared effects of age, job complexity, and the use of successful aging strategies called selection, optimization, and compensation (SOC) in predicting focus on opportunities. Results of data collected from 133 employees of one company (mean age = 38 years, SD = 13, range 16–65 years) showed that age was negatively, and job complexity and use of SOC strategies were positively related to focus on opportunities. In addition, older employees in high-complexity jobs and older employees in low-complexity jobs with high use of SOC strategies were better able to maintain a focus on opportunities than older employees in low-complexity jobs with low use of SOC strategies.
Resumo:
The theory of selective optimization with compensation (SOC) proposes that the “orchestrated” use of three distinct action regulation strategies (selection, optimization, and compensation) leads to positive employee outcomes. Previous research examined overall scores and additive models (i.e., main effects) of SOC strategies instead of interaction models in which SOC strategies mutually enhance each other's effects. Thus, a central assumption of SOC theory remains untested. In addition, most research on SOC strategies has been cross-sectional, assuming that employees' use of SOC strategies is stable over time. We conducted a quantitative diary study across nine work days (N = 77; 514 daily entries) to investigate interactive effects of daily SOC strategies on daily work engagement. Results showed that optimization and compensation, but not selection, had positive main effects on work engagement. Moreover, a significant three-way interaction effect indicated that the relationship between selection and work engagement was positive only when both optimization and compensation were high, whereas the relationship was negative when optimization was low and compensation was high. We discuss implications for future research and practice regarding the use of SOC strategies at work.
Resumo:
This study presents a comprehensive mathematical formulation model for a short-term open-pit mine block sequencing problem, which considers nearly all relevant technical aspects in open-pit mining. The proposed model aims to obtain the optimum extraction sequences of the original-size (smallest) blocks over short time intervals and in the presence of real-life constraints, including precedence relationship, machine capacity, grade requirements, processing demands and stockpile management. A hybrid branch-and-bound and simulated annealing algorithm is developed to solve the problem. Computational experiments show that the proposed methodology is a promising way to provide quantitative recommendations for mine planning and scheduling engineers.
Resumo:
Salinity gradient power is proposed as a source of renewable energy when two solutions of different salinity are mixed. In particular, Pressure Retarded Osmosis (PRO) coupled with a Reverse Osmosis process (RO) has been previously suggested for power generation, using RO brine as the draw solution. However, integration of PRO with RO may have further value for increasing the extent of water recovery in a desalination process. Consequently, this study was designed to model the impact of various system parameters to better understand how to design and operate practical PRO-RO units. The impact of feed salinity and recovery rate for the RO process on the concentration of draw solution, feed pressure, and membrane area of the PRO process was evaluated. The PRO system was designed to operate at maximum power density of . Model results showed that the PRO power density generated intensified with increasing seawater salinity and RO recovery rate. For an RO process operating at 52% recovery rate and 35 g/L feed salinity, a maximum power density of 24 W/m2 was achieved using 4.5 M NaCl draw solution. When seawater salinity increased to 45 g/L and the RO recovery rate was 46%, the PRO power density increased to 28 W/m2 using 5 M NaCl draw solution. The PRO system was able to increase the recovery rate of the RO by up to 18% depending on seawater salinity and RO recovery rate. This result suggested a potential advantage of coupling PRO process with RO system to increase the recovery rate of the desalination process and reduce brine discharge.
Resumo:
Assessing build-up and wash-off process uncertainty is important for accurate interpretation of model outcomes to facilitate informed decision making for developing effective stormwater pollution mitigation strategies. Uncertainty inherent to pollutant build-up and wash-off processes influences the variations in pollutant loads entrained in stormwater runoff from urban catchments. However, build-up and wash-off predictions from stormwater quality models do not adequately represent such variations due to poor characterisation of the variability of these processes in mathematical models. The changes to the mathematical form of current models with the incorporation of process variability, facilitates accounting for process uncertainty without significantly affecting the model prediction performance. Moreover, the investigation of uncertainty propagation from build-up to wash-off confirmed that uncertainty in build-up process significantly influences wash-off process uncertainty. Specifically, the behaviour of particles <150µm during build-up primarily influences uncertainty propagation, resulting in appreciable variations in the pollutant load and composition during a wash-off event.
Resumo:
Uncertainty inherent to heavy metal build-up and wash-off stems from process variability. This results in inaccurate interpretation of stormwater quality model predictions. The research study has characterised the variability in heavy metal build-up and wash-off processes based on the temporal variations in particle-bound heavy metals commonly found on urban roads. The study outcomes found that the distribution of Al, Cr, Mn, Fe, Ni, Cu, Zn, Cd and Pb were consistent over particle size fractions <150µm and >150µm, with most metals concentrated in the particle size fraction <150µm. When build-up and wash-off are considered as independent processes, the temporal variations in these processes in relation to the heavy metals load are consistent with variations in the particulate load. However, the temporal variations in the load in build-up and wash-off of heavy metals and particulates are not consistent for consecutive build-up and wash-off events that occur on a continuous timeline. These inconsistencies are attributed to interactions between heavy metals and particulates <150µm and >150µm, which are influenced by particle characteristics such as organic matter content. The behavioural variability of particles determines the variations in the heavy metals load entrained in stormwater runoff. Accordingly, the variability in build-up and wash-off of particle-bound pollutants needs to be characterised in the description of pollutant attachment to particulates in stormwater quality modelling. This will ensure the accounting of process uncertainty, and thereby enhancing the interpretation of the outcomes derived from modelling studies.
Resumo:
There are some scenarios in which Unmmaned Aerial Vehicle (UAV) navigation becomes a challenge due to the occlusion of GPS systems signal, the presence of obstacles and constraints in the space in which a UAV operates. An additional challenge is presented when a target whose location is unknown must be found within a confined space. In this paper we present a UAV navigation and target finding mission, modelled as a Partially Observable Markov Decision Process (POMDP) using a state-of-the-art online solver in a real scenario using a low cost commercial multi rotor UAV and a modular system architecture running under the Robotic Operative System (ROS). Using POMDP has several advantages to conventional approaches as they take into account uncertainties in sensor information. We present a framework for testing the mission with simulation tests and real flight tests in which we model the system dynamics and motion and perception uncertainties. The system uses a quad-copter aircraft with an board downwards looking camera without the need of GPS systems while avoiding obstacles within a confined area. Results indicate that the system has 100% success rate in simulation and 80% rate during flight test for finding targets located at different locations.
Resumo:
There has been a recent spate of high profile infrastructure cost overruns in Australia and internationally. This is just the tip of a longer-term and more deeply-seated problem with initial budget estimating practice, well recognised in both academic research and industry reviews: the problem of uncertainty. A case study of the Sydney Opera House is used to identify and illustrate the key causal factors and system dynamics of cost overruns. It is conventionally the role of risk management to deal with such uncertainty, but the type and extent of the uncertainty involved in complex projects is shown to render established risk management techniques ineffective. This paper considers a radical advance on current budget estimating practice which involves a particular approach to statistical modelling complemented by explicit training in estimating practice. The statistical modelling approach combines the probability management techniques of Savage, which operate on actual distributions of values rather than flawed representations of distributions, and the data pooling technique of Skitmore, where the size of the reference set is optimised. Estimating training employs particular calibration development methods pioneered by Hubbard, which reduce the bias of experts caused by over-confidence and improve the consistency of subjective decision-making. A new framework for initial budget estimating practice is developed based on the combined statistical and training methods, with each technique being explained and discussed.
Resumo:
Over the past two decades, the selection, optimization, and compensation (SOC) model has been applied in the work context to investigate antecedents and outcomes of employees' use of action regulation strategies. We systematically review, meta-analyze, and critically discuss the literature on SOC strategy use at work and outline directions for future research and practice. The systematic review illustrates the breadth of constructs that have been studied in relation to SOC strategy use, and that SOC strategy use can mediate and moderate relationships of person and contextual antecedents with work outcomes. Results of the meta-analysis show that SOC strategy use is positively related to age (rc = .04), job autonomy (rc = .17), self-reported job performance (rc = .23), non-self-reported job performance (rc = .21), job satisfaction (rc = .25), and job engagement (rc = .38), whereas SOC strategy use is not significantly related to job tenure, job demands, and job strain. Overall, our findings underline the importance of the SOC model for the work context, and they also suggest that its measurement and reporting standards need to be improved to become a reliable guide for future research and organizational practice.