178 resultados para hotel investments
Resumo:
In many countries, the main providers for major infrastructure projects are government or public agencies. Public infrastructure projects includes economic and social infrastructure such as transportation, education and health facilities. Most decision-making models for delivery of public infrastructure projects are heavily weighted towards financial/economic factors. In Australia, public participation is an essential instrument in the procurement of infrastructure and development within Australia. This study reviews the public participation, values and interests in the procurement of infrastructure projects in Australia, and identifies the research direction in this research area in order to improve the decision-making models that capture stakeholder social, economical and environmental concerns in infrastructure projects.
Resumo:
The detached housing scheme is a unique and exclusive segment of the residential property market in Malaysia. Generally, the product is expensive and for many Malaysians who can afford them, owning a detached house is a once in a lifetime opportunity. In spite of this, most of the owners fail to fully comprehend the specific need of this type of housing scheme, increasing the risk of it being a problematic project. Unlike other types of pre-designed ‘mass housing’ schemes, the detached housing scheme may be built specifically to cater the needs and demands of its owner. Therefore, maximum owner participation is vital as the development progresses to guarantee the success of the project. In addition, due to it’s unique design the house would have to individually comply with the requirements and regulations of relevant authorities. Failure of owner to recognise this will result in delays, fines and penalties, disputes and ultimately cost overruns. These circumstances highlight the need for a model to guide the owner through the entire development process of a detached house. Therefore, this research aims to develop a model for a successful detached housing development in Malaysia through maximising owner participation during it’s various development stages. To achieve this, questionnaire surveys and case studies methods shall be employed to acquire the detached housing owners’ experiences in developing their detached houses in Malaysia. Relevant statistical tools shall be applied to analyse the responses. The results gained from this study shall be synthesised into a model of successful detached housing development for the reference of future detached housing owners in Malaysia.
Resumo:
Groundwater is increasingly recognised as an important yet vulnerable natural resource, and a key consideration in water cycle management. However, communication of sub-surface water system behaviour, as an important part of encouraging better water management, is visually difficult. Modern 3D visualisation techniques can be used to effectively communicate these complex behaviours to engage and inform community stakeholders. Most software developed for this purpose is expensive and requires specialist skills. The Groundwater Visualisation System (GVS) developed by QUT integrates a wide range of surface and sub-surface data, to produce a 3D visualisation of the behaviour, structure and connectivity of groundwater/surface water systems. Surface data (elevation, surface water, land use, vegetation and geology) and data collected from boreholes (bore locations and subsurface geology) are combined to visualise the nature, structure and connectivity of groundwater/surface water systems. Time-series data (water levels, groundwater quality, rainfall, stream flow and groundwater abstraction) is displayed as an animation within the 3D framework, or graphically, to show water system condition changes over time. GVS delivers an interactive, stand-alone 3D Visualisation product that can be used in a standard PC environment. No specialised training or modelling skills are required. The software has been used extensively in the SEQ region to inform and engage both water managers and the community alike. Examples will be given of GVS visualisations developed in areas where there have been community concerns around groundwater over-use and contamination.
Resumo:
The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.
Resumo:
Office building retrofit projects are increasingly more intensified as existing buildings are aging. At the same time, building owners and occupants are looking for environmentally sustainable products. These retrofit projects usually take place in center business district (CBDs) with on-site waste becoming one of the critical issues. Small and Medium Enterprises (SMEs) carry out most of the work in retrofit projects as subcontractors. Despite their large involvement, they often do not have adequate resources to deal with the specific technical challenges and project risks related to waste. Few research has been done on their performance of waste management operations. This paper identifies characteristics of on-site waste in office building retrofit projects. It examines the specific requirements for contractors to manage waste in the projects before exploring the existing performance of SMEs. By comparing requirements for SMEs and their potential areas for improvement, a framework is established for performance promotion of SMEs in on-site waste management of office building retrofit projects. The paper will raise the consciousness and commitment of SMEs as sub-contractors to waste management. It also explores ways of supporting SMEs for experience accumulation, performance promotion and project culture establishment towards effective and efficient on-site waste management in the growing sector of office building retrofit and upgrade.
Resumo:
This paper proposes a train movement model with fixed runtime that can be employed to find feasible control strategies for a single train along an inter-city railway line. The objective of the model is to minimize arrival delays at each station along railway lines. However, train movement is a typical nonlinear problem for complex running environments and different requirements. A heuristic algorithm is developed to solve the problem in this paper and the simulation results show that the train could overcome the disturbance from train delay and coordinates the operation strategies to sure punctual arrival of trains at the destination. The developed algorithm can also be used to evaluate the running reliability of trains in scheduled timetables.
Resumo:
We present an approach to automating computationally sound proofs of key exchange protocols based on public-key encryption. We show that satisfying the property called occultness in the Dolev-Yao model guarantees the security of a related key exchange protocol in a simple computational model. Security in this simpler model has been shown to imply security in a Bellare {Rogaway-like model. Furthermore, the occultness in the Dolev-Yao model can be searched automatically by a mechanisable procedure. Thus automated proofs for key exchange protocols in the computational model can be achieved. We illustrate the method using the well-known Lowe-Needham-Schroeder protocol.
Resumo:
Refactoring focuses on improving the reusability, maintainability and performance of programs. However, the impact of refactoring on the security of a given program has received little attention. In this work, we focus on the design of object-oriented applications and use metrics to assess the impact of a number of standard refactoring rules on their security by evaluating the metrics before and after refactoring. This assessment tells us which refactoring steps can increase the security level of a given program from the point of view of potential information flow, allowing application designers to improve their system’s security at an early stage.
Resumo:
Across Australia, construction and redevelopment of public infrastructure, continues to be a key factor in economic development. Within this context, road transport has been identified as key building block of Queensland‟s future prosperity. However, since the late twentieth century, there has been a shift away from delivery of large infrastructure, including road networks, exclusively by the state. Subsequently, a range of alternative models, have emerged in infrastructure project delivery. Among these, governance networks have become a widespread mechanism for planning and delivering infrastructure. However, despite substantial public investments in road infrastructure that are made through governance networks, little is known about how these networks engage with stakeholders who are potentially affected by road infrastructure projects. Although governance networks undertake management functions, it is unclear what drives stakeholder engagement within this networked environment and how stakeholder relationship management is operationalised. This paper proposes that network management functions undertaken by governance networks incorporate stakeholder engagement and that network managers play a key role in creating and sustaining connections between governance networks and their stakeholders Drawing on stakeholder theory and governance network theory, this paper contributes to the literature by showing that stakeholder engagement is embedded within network management and identifying the critical role of network managers in establishing and maintaining stakeholder engagement.
Resumo:
Bridges are an important part of a nation’s infrastructure and reliable monitoring methods are necessary to ensure their safety and efficiency. Most bridges in use today were built decades ago and are now subjected to changes in load patterns that can cause localized distress, which can result in bridge failure if not corrected. Early detection of damage helps in prolonging lives of bridges and preventing catastrophic failures. This paper briefly reviews the various technologies currently used in health monitoring of bridge structures and in particular discusses the application and challenges of acoustic emission (AE) technology. Some of the results from laboratory experiments on a bridge model are also presented. The main objectives of these experiments are source localisation and assessment. The findings of the study can be expected to enhance the knowledge of acoustic emission process and thereby aid in the development of an effective bridge structure diagnostics system.
Resumo:
In 2005, 17.3% of Australians were aged 60 years and older according to the Australian Bureau of statistics (ABS). According to aBS this situation mirrors the poulation profile of other developed countries such as Canada, New Zealand, the United States of America and to some extent the United Kingdom (ABS). Self contained independent living units in retirement Villages are now contributing to the dwellings available for those aged 55 years and over in Australia and the retirement village sector has become a significant sector within the residential property market. However, the method of operaton of many retirement villages, and the lack of freehold tenure, impacts on the desireability of retirement village life to potential residents. This paper focuses on sustainability from the perspective of the ongoing viability of retirement village operations in light of the impact of land tenure and operational issues on the perceptions of potential residents.
Resumo:
Security of tenure is the cornerstone of the land management system in Australia. Freehold title is protected throug indefeasibility of title entrenched in legislation and protection of registrable interests in land is offered through the Statutory Assurance Fund. For those with interests pertaining to Crown Land no such protection is offered, although this position is not uniform across Australia. Notably those with Crown leasehold interests or a profit a prendre on Crown Land in Queensland are not protected through registration on the freehold land register and do not have the benefit of indefeasibility of title. The issue of management of interests pertaining to Crown Land has become increasingly relevant due to the complexities associated with balancing public interests including native title with more commercial interests in land generated through carbon sequestration, forestry and mining. This paper considers the framework for the management of Crown Land in Queensland and the adequacy of this framework for commercial interests that pertain to Crown Land.