690 resultados para Relative construction
Resumo:
Contractual relationships have become increasingly strained in recent years in the construction industry result in the use of the judicial system for the settlement of contractual disagreements. Why is this so? Evidence from anecdotes suggest that the lack of capacity amongst owners and contractors to carry out a contract using a good practice approach during the construction of a project contribute to the occurrence of conflicts, losses, deficient contractual relationships and poor performance of the construction work. Recognizing that current forms of contract in use today perpetuate a legacy of construction problems, we are conducting explanatory research to examine whether the widely publicized benefits of New Engineering Contract (NEC) could be realized in the Australian construction industry. This paper outlines a research agenda that will help shed light on how contract forms are able to be used as a mechanism to ensure construction projects are delivered successfully whilst also meeting the goals of multiple stakeholders. Understanding the Critical Success Factors (CSFs), commonly used construction contracts and the NEC system can help us address some of these issues. However, there are gaps in the validation of the benefits of NEC and its link with project success. We identify some of these gaps and propose a methodology by which to gain insights into this phenomenon. Keywords: Project Success, Construction Contracting, New Engineering Contract (NEC)
Resumo:
The purpose of this paper is to summarize the outcomes of a detailed research study carried out as part of the fulfilment of a doctoral programme which examined the relationships between, and impacts of organisational culture on construction performance within a Hong Kong context. The research used a mixed methodology approach consisting of an organisational culture survey using an adapted validated and reliable measurement instrument (the Denison Organisational Culture Survey), mini-case studies in four Hong Kong construction companies and correlated the derived culture scores against performance scores measured by the Hong Kong Housing Department Performance Assessment Scoring System (PASS). The significance of the research was to advance knowledge of the importance of organisational culture strength as a performance driver in the construction industry and the further proof of the culture performance links using a set of measures of the latter which were not financially-based. The findings of the research make a contribution to theory by further validating the work by Denison (1990) and others, not only in that a successful link between organisational culture and performance was demonstrated, but it also identifies particular cultural factors in organisations that appear to be significantly responsible for achieving successful outcomes and reveals opportunities for further research into the organisational culture of construction companies Keywords: organisational culture, construction performance, business success.
Resumo:
Highway construction often requires a significant capital input; therefore it often causes serious financial implications for developers, owners and operators. The recent industry-wide focus on sustainability has added a new dimension to the evaluation of highway projects, particularly on the economical scale of ‘going green’. Comprehensive analysis of the whole-of-life highway development that responds to sustainability challenges is one of the primary concerns for stakeholders. Principles of engineering economics and life cycle costing have been used to determine the incremental capacity investments for highway projects. However, the consideration of costs and issues associated with sustainability is still very limited in current studies on highway projects. Previous studies have identified that highway project investments are primarily concerned with direct market costs that can be quantified through life cycle costing analysis (LCCA). But they tend to ignore costs that are difficult to calculate, as those related to environmental and social elements. On a more positive note, these studies proved that the inclusion of such costs is an essential part of the overall development investment and a primary concern for decision making by the stakeholders. This paper discusses a research attempt to identify and categorise sustainability cost elements for highway projects. Through questionnaire survey, a set of sustainability cost elements on highway projects has been proposed. These cost elements are incorporated into the extension of some of the existing Life Cycle Costing Analysis (LCCA) models in order to produce a holistic financial picture of the highway project. It is expected that a new LCCA model will be established to serve as a suitable tool for decision making for highway project stakeholders.
Resumo:
Public awareness and the nature of highway construction works demand that sustainability measures are first on the development agenda. However, in the current economic climate, individual volition and enthusiasm for such high capital investments do not present as strong cases for decision making as the financial pictures of pursuing sustainability. Some stakeholders consider sustainability to be extra work that costs additional money. Though, stakeholders realised its importance in infrastructure development. They are keen to identify the available alternatives and financial implications on a lifecycle basis. Highway infrastructure development is a complex rocess which requires expertise and tools to evaluate investment options, such as environmentally sustainable features for road and highway development. Life-cycle cost analysis (LCCA) is a valuable approach for investment decision making for construction works. However, LCCA applications in highway development are still limited. Current models, for example focus on economic issues alone and do not deal with sustainability factors, which are more difficult to quantify and encapsulate in estimation modules. This paper reports the research which identifies sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into past and proven LCCA models to produce a new long term decision support model. The research via questionnaire, model building, analytical hierarchy processes (AHP) and case studies have identified, evaluated and then processed highway sustainability related cost elements. These cost elements need to be verified by industry before being integrated for further development of the model. Then the Australian construction industry will have a practical tool to evaluate investment decisions which provide an optimum balance between financial viability and sustainability deliverables.
Resumo:
A persistent question in the development of models for macroeconomic policy analysis has been the relative role of economic theory and evidence in their construction. This paper looks at some popular strategies that involve setting up a theoretical or conceptual model (CM) which is transformed to match the data and then made operational for policy analysis. A dynamic general equilibrium model is constructed that is similar to standard CMs. After calibration to UK data it is used to examine the utility of formal econometric methods in assessing the match of the CM to the data and also to evaluate some standard model-building strategies. Keywords: Policy oriented economic modeling; Model evaluation; VAR models
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
Productivity is basic statistical information for many international comparisons and country performance assessments. This study estimates the construction labour productivity of 79 selected economies. The real (purchasing power parities converted) and nominal construction expenditure from the Report of 2005 International Comparison Programme published by the World Bank and construction employment from the database of labour statistics (LABORSTA) operated by the Bureau of Statistics of International Labour Organization were used in the estimation. The inference statistics indicate that the descending order of nominal construction labour productivity from high income economies to low income economies is not established. The average construction labour productivity of low income economies is higher than middle income economies when the productivity calculation uses purchasing power parities converted data. Malaysia ranked 50th and 63rd position among the 79 selected economies on real and nominal measurement respectively.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
This paper describes technologies we have developed to perform autonomous large-scale off-world excavation. A scale dragline excavator of size similar to that required for lunar excavation was made capable of autonomous control. Systems have been put in place to allow remote operation of the machine from anywhere in the world. Algorithms have been developed for complete autonomous digging and dumping of material taking into account machine and terrain constraints and regolith variability. Experimental results are presented showing the ability to autonomously excavate and move large amounts of regolith and accurately place it at a specified location.
Resumo:
Uninhabited aerial vehicles (UAVs) are a cutting-edge technology that is at the forefront of aviation/aerospace research and development worldwide. Many consider their current military and defence applications as just a token of their enormous potential. Unlocking and fully exploiting this potential will see UAVs in a multitude of civilian applications and routinely operating alongside piloted aircraft. The key to realising the full potential of UAVs lies in addressing a host of regulatory, public relation, and technological challenges never encountered be- fore. Aircraft collision avoidance is considered to be one of the most important issues to be addressed, given its safety critical nature. The collision avoidance problem can be roughly organised into three areas: 1) Sense; 2) Detect; and 3) Avoid. Sensing is concerned with obtaining accurate and reliable information about other aircraft in the air; detection involves identifying potential collision threats based on available information; avoidance deals with the formulation and execution of appropriate manoeuvres to maintain safe separation. This thesis tackles the detection aspect of collision avoidance, via the development of a target detection algorithm that is capable of real-time operation onboard a UAV platform. One of the key challenges of the detection problem is the need to provide early warning. This translates to detecting potential threats whilst they are still far away, when their presence is likely to be obscured and hidden by noise. Another important consideration is the choice of sensors to capture target information, which has implications for the design and practical implementation of the detection algorithm. The main contributions of the thesis are: 1) the proposal of a dim target detection algorithm combining image morphology and hidden Markov model (HMM) filtering approaches; 2) the novel use of relative entropy rate (RER) concepts for HMM filter design; 3) the characterisation of algorithm detection performance based on simulated data as well as real in-flight target image data; and 4) the demonstration of the proposed algorithm's capacity for real-time target detection. We also consider the extension of HMM filtering techniques and the application of RER concepts for target heading angle estimation. In this thesis we propose a computer-vision based detection solution, due to the commercial-off-the-shelf (COTS) availability of camera hardware and the hardware's relatively low cost, power, and size requirements. The proposed target detection algorithm adopts a two-stage processing paradigm that begins with an image enhancement pre-processing stage followed by a track-before-detect (TBD) temporal processing stage that has been shown to be effective in dim target detection. We compare the performance of two candidate morphological filters for the image pre-processing stage, and propose a multiple hidden Markov model (MHMM) filter for the TBD temporal processing stage. The role of the morphological pre-processing stage is to exploit the spatial features of potential collision threats, while the MHMM filter serves to exploit the temporal characteristics or dynamics. The problem of optimising our proposed MHMM filter has been examined in detail. Our investigation has produced a novel design process for the MHMM filter that exploits information theory and entropy related concepts. The filter design process is posed as a mini-max optimisation problem based on a joint RER cost criterion. We provide proof that this joint RER cost criterion provides a bound on the conditional mean estimate (CME) performance of our MHMM filter, and this in turn establishes a strong theoretical basis connecting our filter design process to filter performance. Through this connection we can intelligently compare and optimise candidate filter models at the design stage, rather than having to resort to time consuming Monte Carlo simulations to gauge the relative performance of candidate designs. Moreover, the underlying entropy concepts are not constrained to any particular model type. This suggests that the RER concepts established here may be generalised to provide a useful design criterion for multiple model filtering approaches outside the class of HMM filters. In this thesis we also evaluate the performance of our proposed target detection algorithm under realistic operation conditions, and give consideration to the practical deployment of the detection algorithm onboard a UAV platform. Two fixed-wing UAVs were engaged to recreate various collision-course scenarios to capture highly realistic vision (from an onboard camera perspective) of the moments leading up to a collision. Based on this collected data, our proposed detection approach was able to detect targets out to distances ranging from about 400m to 900m. These distances, (with some assumptions about closing speeds and aircraft trajectories) translate to an advanced warning ahead of impact that approaches the 12.5 second response time recommended for human pilots. Furthermore, readily available graphic processing unit (GPU) based hardware is exploited for its parallel computing capabilities to demonstrate the practical feasibility of the proposed target detection algorithm. A prototype hardware-in- the-loop system has been found to be capable of achieving data processing rates sufficient for real-time operation. There is also scope for further improvement in performance through code optimisations. Overall, our proposed image-based target detection algorithm offers UAVs a cost-effective real-time target detection capability that is a step forward in ad- dressing the collision avoidance issue that is currently one of the most significant obstacles preventing widespread civilian applications of uninhabited aircraft. We also highlight that the algorithm development process has led to the discovery of a powerful multiple HMM filtering approach and a novel RER-based multiple filter design process. The utility of our multiple HMM filtering approach and RER concepts, however, extend beyond the target detection problem. This is demonstrated by our application of HMM filters and RER concepts to a heading angle estimation problem.
Resumo:
This paper presents the results of a structural equation model (SEM) for describing and quantifying the fundamental factors that affect contract disputes between owners and contractors in the construction industry. Through this example, the potential impact of SEM analysis in construction engineering and management research is illustrated. The purpose of the specific model developed in this research is to explain how and why contract related construction problems occur. This study builds upon earlier work, which developed a disputes potential index, and the likelihood of construction disputes was modeled using logistic regression. In this earlier study, questionnaires were completed on 159 construction projects, which measured both qualitative and quantitative aspects of contract disputes, management ability, financial planning, risk allocation, and project scope definition for both owners and contractors. The SEM approach offers several advantages over the previously employed logistic regression methodology. The final set of structural equations provides insight into the interaction of the variables that was not apparent in the original logistic regression modeling methodology.
Resumo:
Anecdotal evidence from the infrastructure and building sectors highlights issues of drugs and alcohol and its association with safety risk on construction sites. Operating machinery and mobile equipment, proximity to live traffic together with congested sites, electrical equipment and operating at heights conspire to accentuate the potential adverse impact of drugs and alcohol in the workplace. While most Australian jurisdictions have identified this as a critical safety issue, information is limited regarding the prevalence of alcohol and other drugs in the workplace and there is limited evidential guidance regarding how to effectively and efficiently address such an issue. No known study has scientifically evaluated the relationship between the use of drugs and alcohol and safety impacts in construction, and there has been only limited adoption of nationally coordinated strategies, supported by employers and employees to render it socially unacceptable to arrive at a construction workplace with impaired judgement from drugs and alcohol. A nationally consistent collaborative approach across the construction workforce - involving employers and employees; clients; unions; contractors and sub-contractors is required to engender a cultural change in the construction workforce – in a similar manner to the on-going initiative in securing a cultural change to drink-driving in our society where peer intervention and support is encouraged. This study has four key objectives. Firstly, using the standard World Health Organisation AUDIT, a national qualitative and quantitative assessment of the use of drugs and alcohol will be carried out. This will build upon similar studies carried out in the Australian energy and mining sectors. Secondly, the development of an appropriate industry policy will adopt a non-punitive and rehabilitative approach developed in consultation with employers and employees across the infrastructure and building sectors, with the aim it be adopted nationally for adoption at the construction workplace. Thirdly, an industry-specific cultural change management program will be developed through a nationally collaborative approach to reducing the risk of impaired performance on construction sites and increasing workers’ commitment to drugs and alcohol safety. Finally, an implementation plan will be developed from data gathered from both managers and construction employees. Such an approach stands to benefit not only occupational health and safety, through a greater understanding of the safety impacts of alcohol and other drugs at work, but also alcohol and drug use as a wider community health issue. This paper will provide an overview of the background and significance of the study as well as outlining the proposed methodology that will be used to evaluate the safety impacts of alcohol and other drugs in the construction industry.
Resumo:
-
Resumo:
Multi-level concrete buildings requrre substantial temporary formwork structures to support the slabs during construction. The primary function of this formwork is to safely disperse the applied loads so that the slab being constructed, or the portion of the permanent structure already constructed, is not overloaded. Multi-level formwork is a procedure in which a limited number of formwork and shoring sets are cycled up the building as construction progresses. In this process, each new slab is supported by a number of lower level slabs. The new slab load is, essentially, distributed to these supporting slabs in direct proportion to their relative stiffness. When a slab is post-tensioned using draped tendons, slab lift occurs as a portion of the slab self-weight is balanced. The formwork and shores supporting that slab are unloaded by an amount equivalent to the load balanced by the post-tensioning. This produces a load distribution inherently different from that of a conventionally reinforced slab. Through , theoretical modelling and extensive on-site shore load measurement, this research examines the effects of post-tensioning on multilevel formwork load distribution. The research demonstrates that the load distribution process for post-tensioned slabs allows for improvements to current construction practice. These enhancements include a shortening of the construction period; an improvement in the safety of multi-level form work operations; and a reduction in the quantity of form work materials required for a project. These enhancements are achieved through the general improvement in safety offered by post-tensioning during the various formwork operations. The research demonstrates that there is generally a significant improvement in the factors of safety over those for conventionally reinforced slabs. This improvement in the factor of safety occurs at all stages of the multi-level formwork operation. The general improvement in the factors of safety with post-tensioned slabs allows for a shortening of the slab construction cycle time. Further, the low level of load redistribution that occurs during the stripping operations makes post-tensioned slabs ideally suited to reshoring procedures. Provided the overall number of interconnected levels remains unaltered, it is possible to increase the number of reshored levels while reducing the number of undisturbed shoring levels without altering the factors of safety, thereby, reducing the overall quantity of formwork and shoring materials.