687 resultados para Project monitoring
Resumo:
This project aims to develop a methodology for designing and conducting a systems engineering analysis to build and fly continuously, day and night, propelled uniquely by solar energy for one week with a 0.25Kg payload consuming 0.5 watt without fuel or pollution. An airplane able to fly autonomously for many days could find many applications. Including coastal or border surveillance, atmospherical and weather research and prediction, environmental, forestry, agricultural, and oceanic monitoring, imaging for the media and real-estate industries, etc. Additional advantages of solar airplanes are their low cost and the simplicity with which they can be launched. For example, in the case of potential forest fire risks during a warm and dry period, swarms of solar airplanes, easily launched with the hand, could efficiently monitor a large surface, reporting rapidly any fire starts. This would allow a fast intervention and thus reduce the cost of such disaster, in terms of human and material losses. At higher dimension, solar HALE platforms are expected to play a major role as communication relays and could replace advantageously satellites in a near future.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
A study of Australian nurses on their use of information technology in the workplace was undertaken by the Australian Nursing Federation (ANF) in 2007. This study of over 4000 nurses highlighted that nurses recognise benefits to adopting more information technology in the workplace although there are significant barriers to their use. It also identified gross deficits in the capacity of the nursing workforce to engage in the digital processing of information. Following the release of the study last year, the ANF commenced work on a number of key recommendations from the report in order to overcome identified barriers and provide opportunities for nurses to better utilise information technology and information management systems. One of these recommendations was to seek research funding to develop national information technology and information management competency standards for nurses. This project has now received Federal Government funding to undertake this development. This project is being developed in collaboration with the ANF and the Queensland University of Technology. This paper will discuss the methodology, development and publication of the Australian Nursing Informatics Competency Standards Project which is currently underway and due for completion in May 2009. The Australian Nursing Informatics Competencies will be presented at the conference.
Resumo:
Many studies in the area of project management and social networks have identified the significance of project knowledge transfer within and between projects. However, only few studies have examined the intra- and inter-projects knowledge transfer activities. Knowledge in projects can be transferred via face-to-face interactions on the one hand, and via IT-based tools on the other. Although companies have allocated many resources to the IT tools, it has been found that they are not always effectively utilised, and people prefer to look for knowledge using social face-to-face interactions. This paper explores how to effectively leverage two alternative knowledge transfer techniques, face-to-face and IT-based tools to facilitate knowledge transfer and enhance knowledge creation for intra- and inter-project knowledge transfer. The paper extends the previous research on the relationships between and within teams by examining the project’s external and internal knowledge networks concurrently. Social network qualitative analysis, using a case study within a small-medium enterprise, was used to examine the knowledge transfer activities within and between projects, and to investigate knowledge transfer techniques. This paper demonstrates the significance of overlapping employees working simultaneously on two or more projects and their impact on facilitating knowledge transfer between projects within a small/medium organisation. This research is also crucial to gaining better understanding of different knowledge transfer techniques used for intra- and inter-project knowledge exchange. The research provides recommendations on how to achieve better knowledge transfer within and between projects in order to fully utilise a project’s knowledge and achieve better project performance.
Resumo:
Aims: To describe a local data linkage project to match hospital data with the Australian Institute of Health and Welfare (AIHW) National Death Index (NDI) to assess longterm outcomes of intensive care unit patients. Methods: Data were obtained from hospital intensive care and cardiac surgery databases on all patients aged 18 years and over admitted to either of two intensive care units at a tertiary-referral hospital between 1 January 1994 and 31 December 2005. Date of death was obtained from the AIHW NDI by probabilistic software matching, in addition to manual checking through hospital databases and other sources. Survival was calculated from time of ICU admission, with a censoring date of 14 February 2007. Data for patients with multiple hospital admissions requiring intensive care were analysed only from the first admission. Summary and descriptive statistics were used for preliminary data analysis. Kaplan-Meier survival analysis was used to analyse factors determining long-term survival. Results: During the study period, 21 415 unique patients had 22 552 hospital admissions that included an ICU admission; 19 058 surgical procedures were performed with a total of 20 092 ICU admissions. There were 4936 deaths. Median follow-up was 6.2 years, totalling 134 203 patient years. The casemix was predominantly cardiac surgery (80%), followed by cardiac medical (6%), and other medical (4%). The unadjusted survival at 1, 5 and 10 years was 97%, 84% and 70%, respectively. The 1-year survival ranged from 97% for cardiac surgery to 36% for cardiac arrest. An APACHE II score was available for 16 877 patients. In those discharged alive from hospital, the 1, 5 and 10-year survival varied with discharge location. Conclusions: ICU-based linkage projects are feasible to determine long-term outcomes of ICU patients
Resumo:
This paper describes the gaps in monitoring and surveillance identified while conducting Community Food Security assessments in three geographical areas located in south-east Queensland, Australia
Resumo:
An Approach with Vertical Guidance (APV) is an instrument approach procedure which provides horizontal and vertical guidance to a pilot on approach to landing in reduced visibility conditions. APV approaches can greatly reduce the safety risk to general aviation by improving the pilot’s situational awareness. In particular the incidence of Controlled Flight Into Terrain (CFIT) which has occurred in a number of fatal air crashes in general aviation over the past decade in Australia, can be reduced. APV approaches can also improve general aviation operations. If implemented at Australian airports, APV approach procedures are expected to bring a cost saving of millions of dollars to the economy due to fewer missed approaches, diversions and an increased safety benefit. The provision of accurate horizontal and vertical guidance is achievable using the Global Positioning System (GPS). Because aviation is a safety of life application, an aviation-certified GPS receiver must have integrity monitoring or augmentation to ensure that its navigation solution can be trusted. However, the difficulty with the current GPS satellite constellation alone meeting APV integrity requirements, the susceptibility of GPS to jamming or interference and the potential shortcomings of proposed augmentation solutions for Australia such as the Ground-based Regional Augmentation System (GRAS) justifies the investigation of Aircraft Based Augmentation Systems (ABAS) as an alternative integrity solution for general aviation. ABAS augments GPS with other sensors at the aircraft to help it meet the integrity requirements. Typical ABAS designs assume high quality inertial sensors to provide an accurate reference trajectory for Kalman filters. Unfortunately high-quality inertial sensors are too expensive for general aviation. In contrast to these approaches the purpose of this research is to investigate fusing GPS with lower-cost Micro-Electro-Mechanical System (MEMS) Inertial Measurement Units (IMU) and a mathematical model of aircraft dynamics, referred to as an Aircraft Dynamic Model (ADM) in this thesis. Using a model of aircraft dynamics in navigation systems has been studied before in the available literature and shown to be useful particularly for aiding inertial coasting or attitude determination. In contrast to these applications, this thesis investigates its use in ABAS. This thesis presents an ABAS architecture concept which makes use of a MEMS IMU and ADM, named the General Aviation GPS Integrity System (GAGIS) for convenience. GAGIS includes a GPS, MEMS IMU, ADM, a bank of Extended Kalman Filters (EKF) and uses the Normalized Solution Separation (NSS) method for fault detection. The GPS, IMU and ADM information is fused together in a tightly-coupled configuration, with frequent GPS updates applied to correct the IMU and ADM. The use of both IMU and ADM allows for a number of different possible configurations. Three are investigated in this thesis; a GPS-IMU EKF, a GPS-ADM EKF and a GPS-IMU-ADM EKF. The integrity monitoring performance of the GPS-IMU EKF, GPS-ADM EKF and GPS-IMU-ADM EKF architectures are compared against each other and against a stand-alone GPS architecture in a series of computer simulation tests of an APV approach. Typical GPS, IMU, ADM and environmental errors are simulated. The simulation results show the GPS integrity monitoring performance achievable by augmenting GPS with an ADM and low-cost IMU for a general aviation aircraft on an APV approach. A contribution to research is made in determining whether a low-cost IMU or ADM can provide improved integrity monitoring performance over stand-alone GPS. It is found that a reduction of approximately 50% in protection levels is possible using the GPS-IMU EKF or GPS-ADM EKF as well as faster detection of a slowly growing ramp fault on a GPS pseudorange measurement. A second contribution is made in determining how augmenting GPS with an ADM compares to using a low-cost IMU. By comparing the results for the GPS-ADM EKF against the GPS-IMU EKF it is found that protection levels for the GPS-ADM EKF were only approximately 2% higher. This indicates that the GPS-ADM EKF may potentially replace the GPS-IMU EKF for integrity monitoring should the IMU ever fail. In this way the ADM may contribute to the navigation system robustness and redundancy. To investigate this further, a third contribution is made in determining whether or not the ADM can function as an IMU replacement to improve navigation system redundancy by investigating the case of three IMU accelerometers failing. It is found that the failed IMU measurements may be supplemented by the ADM and adequate integrity monitoring performance achieved. Besides treating the IMU and ADM separately as in the GPS-IMU EKF and GPS-ADM EKF, a fourth contribution is made in investigating the possibility of fusing the IMU and ADM information together to achieve greater performance than either alone. This is investigated using the GPS-IMU-ADM EKF. It is found that the GPS-IMU-ADM EKF can achieve protection levels approximately 3% lower in the horizontal and 6% lower in the vertical than a GPS-IMU EKF. However this small improvement may not justify the complexity of fusing the IMU with an ADM in practical systems. Affordable ABAS in general aviation may enhance existing GPS-only fault detection solutions or help overcome any outages in augmentation systems such as the Ground-based Regional Augmentation System (GRAS). Countries such as Australia which currently do not have an augmentation solution for general aviation could especially benefit from the economic savings and safety benefits of satellite navigation-based APV approaches.
Resumo:
Aligning the motivation of contractors and consultants to perform better than ‘business-as-usual’ (BAU) on a construction project is a complex undertaking and the costs of failure are high as misalignment can compromise project outcomes. Despite the potential benefits of effective alignment, there is still little information about optimally designing procurement approaches that promote motivation towards ‘above BAU’ goals. The paper contributes to this knowledge gap by examining the negative drivers of motivation in a major construction project that, despite a wide range of performance enhancing incentives, failed to exceed BAU performance. The paper provides a case study of an iconic infrastructure project undertaken in Australia between 2002 and 2004. It is shown that incentives provided to contractors and consultants to achieve above BAU performance can be compromised by a range of negative motivation drivers including: • inequitable contractual risk allocation; • late involvement of key stakeholders; • inconsistency between contract intentions and relationship intentions; • inadequate price negotiation; • inconsistency between the project performance goals and incentive goals; •unfair and inflexible incentive performance measurement processes. Future quantitative research is planned to determine the generalisability of these results.
Resumo:
Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
The Silk Road Project was a practice-based research project investigating the potential of motion capture technology to inform perceptions of embodiment in dance performance. The project created a multi-disciplinary collaborative performance event using dance performance and real-time motion capture at Deakin University’s Deakin Motion Lab. Several new technological advances in producing real-time motion capture performance were produced, along with a performance event that examined the aesthetic interplay between a dancer’s movement and the precise mappings of its trajectories created by motion capture and real-time motion graphic visualisations.
Resumo:
Since the Good Friday Agreement of 1998, large sums have been invested in community theatre projects in Northern Ireland, in the interests of conflict transformation and peace building. While this injection of funds has resulted in an unprecedented level of applied theatre activity, opportunities to maximise learning from this activity are being missed. It is generally assumed that project evaluation is undertaken at least partly to assess the degree of success of projects against important social objectives, with a view to learning what works, what does not, and what might work in the future. However, three ethnographic case studies of organisations delivering applied theatre projects in Northern Ireland indicate that current processes used to evaluate such projects are both flawed and inadequate for this purpose. Practitioners report that the administrative work involved in applying for and justifying funding is onerous, burdensome, and occurs at the expense of artistic activity. This is a very real concern when the time and effort devoted to ‘filling out the forms’ does not ultimately result in useful evaluative information. There are strong disincentives for organisations to report honestly on their experiences of difficulties, or undesirable impacts of projects, and this problem is not transcended by the use of external evaluators. Current evaluation processes provide little opportunity to capture unexpected benefits of projects, and small but significant successes which occur in the context of over-ambitious objectives. Little or no attempt is made to assess long-term impacts of projects on communities. Finally, official evaluation mechanisms fail to capture the reflective practice and dialogic analysis of practitioners, which would richly inform future projects. The authors argue that there is a need for clearer lines of communication, and more opportunities for mutual learning, among stakeholders involved in community development. In particular, greater involvement of the higher education sector in partnership with government and non-government agencies could yield significant benefits in terms of optimizing learning from applied theatre project evaluations.
Resumo:
With increasing pressure to provide environmentally responsible infrastructure products and services, stakeholders are putting significant foci on the early identification of financial viability and outcome of infrastructure projects. Traditionally, there has been an imbalance between sustainable measures and project budget. On one hand, the industry tends to employ the first-cost mentality and approach to developing infrastructure projects. On the other, environmental experts and technology innovators often push for the ultimately green products and systems without much of a concern for cost. This situation is being quickly changed as the industry is under pressure to continue to return profit, while better adapting to current and emerging global issues of sustainability. For the infrastructure sector to contribute to sustainable development, it will need to increase value and efficiency. Thus, there is a great need for tools that will enable decision makers evaluate competing initiatives and identify the most sustainable approaches to procuring infrastructure projects. In order to ensure that these objectives are achieved, the concept of life-cycle costing analysis (LCCA) will play significant roles in the economics of an infrastructure project. Recently, a few research initiatives have applied the LCCA models for road infrastructure that focused on the traditional economics of a project. There is little coverage of life-cycle costing as a method to evaluate the criteria and assess the economic implications of pursuing sustainability in road infrastructure projects. To rectify this problem, this paper reviews the theoretical basis of previous LCCA models before discussing their inability to determinate the sustainability indicators in road infrastructure project. It then introduces an on-going research aimed at developing a new model to integrate the various new cost elements based on the sustainability indicators with the traditional and proven LCCA approach. It is expected that the research will generate a working model for sustainability based life-cycle cost analysis.
Resumo:
This report presents the outcomes of a project undertaken by the VACCHO Public Health Research Unit to explore ways to build capacity in Aboriginal and Torres Strait Islander social determinants research. The project was funded by the Cooperative Research Centre for Aboriginal Health.----- The project involved a series of four social determinants research workshops conducted in July and August 2009 and a collaborative forum conducted in September 2009. Invitations to participate were extended to the VACCHO membership and the nine universities in Victoria. Three workshops were held with ACCHOs (in Bendigo, Melbourne and Gippsland), and one workshop with universities (in Melbourne).----- The workshops aimed to build VACCHO’s social determinants research capacity and provide direction for VACCHO on ways to more effectively engage in Aboriginal health research. Through the workshops, VACCHO aimed to work with ACCHOs to identify research processes and issues that are equitable and sustainable, and which address the social determinants of health.----- At the workshops, participants explored questions around the priorities for the social determinants of Aboriginal health and considered the key partnerships that might be important to social determinants research.----- At the workshops with ACCHOs, participants identified key research priorities and questions in Aboriginal social determinants and health. This focus reflects the need for Aboriginal and Torres Strait Islander community representatives to identify the priorities in health and social determinants research. Identifying these priorities is important if researchers are to respond in a meaningful way and undertake relevant research in the most urgent areas of need. At the university workshop, participants focused on identifying research process and implementation issues in social determinants research.----- The final forum brought together ACCHOs, university representatives, invited presenters and participants from justice, education and housing departments, and representatives from non-government funding organisations. The forum aimed to provide an insight into how priorities and funding decisions are made, and how research can help to ensure they are influenced by the priorities of the community. The findings from the workshops were presented at the forum and used to develop pathways for future research.