384 resultados para MIP Mathematical Programming Job Shop Scheduling
Resumo:
The process of becoming numerate begins in the early years. According to Vygotskian theory (1978), teachers are More Knowledgeable Others who provide and support learning experiences that influence children’s mathematical learning. This paper reports on research that investigates three early childhood teachers mathematics content knowledge. An exploratory, single case study utilised data collected from interviews, and email correspondence to investigate the teachers’ mathematics content knowledge. The data was reviewed according to three analytical strategies: content analysis, pattern matching, and comparative analysis. Findings indicated there was variation in teachers’ content knowledge across the five mathematical strands and that teachers might not demonstrate the depth of content knowledge that is expected of four year specially trained early years’ teachers. A significant factor that appeared to influence these teachers’ content knowledge was their teaching experience. Therefore, an avenue for future research is the investigation of factors that influence teachers’ content numeracy knowledge.
Resumo:
Planning on utilization of train-set is one of the key tasks of transport organization for passenger dedicated railway in China. It also has strong relationships with timetable scheduling and operation plans at a station. To execute such a task in a railway hub pooling multiple railway lines, the characteristics of multiple routing for train-set is discussed in term of semicircle of train-sets' turnover. In programming the described problem, the minimum dwell time is selected as the objectives with special derive constraints of the train-set's dispatch, the connecting conditions, the principle of uniqueness for train-sets, and the first plus for connection in the same direction based on time tolerance σ. A compact connection algorithm based on time tolerance is then designed. The feasibility of the model and the algorithm is proved by the case study. The result indicates that the circulation model and algorithm about multiple routing can deal with the connections between the train-sets of multiple directions, and reduce the train's pulling in or leaving impact on the station's throat.
Resumo:
Tangible programming elements offer the dynamic and programmable properties of a computer without the complexity introduced by the keyboard, mouse and screen. This paper explores the extent to which programming skills are used by children during interactions with a set of tangible programming elements: the Electronic Blocks. An evaluation of the Electronic Blocks indicates that children become heavily engaged with the blocks, and learn simple programming with a minimum of adult support.
Resumo:
This article examined the relationship between time structure and Macan's process model of time management. This study proposed that time structure—‘appraisal of effective time usage’—would be a more parsimonious mediator than perceived control over time in the relationship between time management behaviours and outcome variables, such as job satisfaction and psychological well-being. Alternative structure models were compared using a sample of 111 university students. Model 1 tested Macan's process model of time management with perceived control over time as the mediator. Model 2 replaced perceived control over time by the construct of time structure. Model 3 examined the possibility of perceived control over time and time structure as being parallel mediators of the relationships between time management and outcomes. Results of this study showed that Model 1 and Model 2 fitted the data equally well. On the other hand, the mediated effects were small and partial in both models. This pattern of results calls for reassessment of the process model.
Resumo:
We present a spatiotemporal mathematical model of chlamydial infection, host immune response and spatial movement of infectious particles. The re- sulting partial differential equations model both the dynamics of the infection and changes in infection profile observed spatially along the length of the host genital tract. This model advances previous chlamydia modelling by incorporating spatial change, which we also demonstrate to be essential when the timescale for movement of infectious particles is equal to, or shorter than, the developmental cycle timescale. Numerical solutions and model analysis are carried out, and we present a hypothesis regarding the potential for treatment and prevention of infection by increasing chlamydial particle motility.
Resumo:
Distributed pipeline assets systems are crucial to society. The deterioration of these assets and the optimal allocation of limited budget for their maintenance correspond to crucial challenges for water utility managers. Decision makers should be assisted with optimal solutions to select the best maintenance plan concerning available resources and management strategies. Much research effort has been dedicated to the development of optimal strategies for maintenance of water pipes. Most of the maintenance strategies are intended for scheduling individual water pipe. Consideration of optimal group scheduling replacement jobs for groups of pipes or other linear assets has so far not received much attention in literature. It is a common practice that replacement planners select two or three pipes manually with ambiguous criteria to group into one replacement job. This is obviously not the best solution for job grouping and may not be cost effective, especially when total cost can be up to multiple million dollars. In this paper, an optimal group scheduling scheme with three decision criteria for distributed pipeline assets maintenance decision is proposed. A Maintenance Grouping Optimization (MGO) model with multiple criteria is developed. An immediate challenge of such modeling is to deal with scalability of vast combinatorial solution space. To address this issue, a modified genetic algorithm is developed together with a Judgment Matrix. This Judgment Matrix is corresponding to various combinations of pipe replacement schedules. An industrial case study based on a section of a real water distribution network was conducted to test the new model. The results of the case study show that new schedule generated a significant cost reduction compared with the schedule without grouping pipes.
Resumo:
Mathematics education literature has called for an abandonment of ontological and epistemological ideologies that have often divided theory-based practice. Instead, a consilience of theories has been sought which would leverage the strengths of each learning theory and so positively impact upon contemporary educational practice. This research activity is based upon Popper’s notion of three knowledge worlds which differentiates the knowledge shared in a community from the personal knowledge of the individual, and Bereiter’s characterisation of understanding as the individual’s relationship to tool-like knowledge. Using these notions, a re-conceptualisation of knowledge and understanding and a subsequent re-consideration of learning theories are proposed as a way to address the challenge set by literature. Referred to as the alternative theoretical framework, the proposed theory accounts for the scaffolded transformation of each individual’s unique understanding, whilst acknowledging the existence of a body of domain knowledge shared amongst participants in a scientific community of practice. The alternative theoretical framework is embodied within an operational model that is accompanied by a visual nomenclature with which to describe consensually developed shared knowledge and personal understanding. This research activity has sought to iteratively evaluate this proposed theory through the practical application of the operational model and visual nomenclature to the domain of early-number counting, addition and subtraction. This domain of mathematical knowledge has been comprehensively analysed and described. Through this process, the viability of the proposed theory as a tool with which to discuss and thus improve the knowledge and understanding with the domain of mathematics has been validated. Putting of the proposed theory into practice has lead to the theory’s refinement and the subsequent achievement of a solid theoretical base for the future development of educational tools to support teaching and learning practice, including computer-mediated learning environments. Such future activity, using the proposed theory, will advance contemporary mathematics educational practice by bringing together the strengths of cognitivist, constructivist and post-constructivist learning theories.
Resumo:
Real-world business processes rely on the availability of scarce, shared resources, both human and non-human. Current workflow management systems support allocation of individual human resources to tasks but lack support for the full range of resource types used in practice, and the inevitable constraints on their availability and applicability. Based on past experience with resource-intensive workflow applications, we derive generic requirements for a workflow system which can use its knowledge of resource capabilities and availability to help create feasible task schedules. We then define the necessary architecture for implementing such a system and demonstrate its practicality through a proof-of-concept implementation. This work is presented in the context of a real-life surgical care process observed in a number of German hospitals.
Resumo:
The elastic task model, a significant development in scheduling of real-time control tasks, provides a mechanism for flexible workload management in uncertain environments. It tells how to adjust the control periods to fulfill the workload constraints. However, it is not directly linked to the quality-of-control (QoC) management, the ultimate goal of a control system. As a result, it does not tell how to make the best use of the system resources to maximize the QoC improvement. To fill in this gap, a new feedback scheduling framework, which we refer to as QoC elastic scheduling, is developed in this paper for real-time process control systems. It addresses the QoC directly through embedding both the QoC management and workload adaptation into a constrained optimization problem. The resulting solution for period adjustment is in a closed-form expressed in QoC measurements, enabling closed-loop feedback of the QoC to the task scheduler. Whenever the QoC elastic scheduler is activated, it improves the QoC the most while still meeting the system constraints. Examples are given to demonstrate the effectiveness of the QoC elastic scheduling.
Resumo:
New technologies have the potential to both expose children to and protect them from television news footage likely to disturb or frighten. The advent of cheap, portable and widely available digital technology has vastly increased the possibility of violent news events being captured and potentially broadcast. This material has the potential to be particularly disturbing and harmful to young children. But on the flipside, available digital technology could be used to build in protection for young viewers especially when it comes to preserving scheduled television programming and guarding against violent content being broadcast during live crosses from known trouble spots. Based on interviews with news directors, parents and a review of published material two recommendations are put forward: 1. Digital television technology should be employed to prevent news events "overtaking" scheduled children's programming and to protect safe harbours placed in the classifications zones to protect children. 2. Broadcasters should regain control of the images that go to air during "live" feeds from obviously volatile situations by building in short delays in G classification zones.
Resumo:
Fractures of long bones are sometimes treated using various types of fracture fixation devices including internal plate fixators. These are specialised plates which are used to bridge the fracture gap(s) whilst anatomically aligning the bone fragments. The plate is secured in position by screws. The aim of such a device is to support and promote the natural healing of the bone. When using an internal fixation device, it is necessary for the clinician to decide upon many parameters, for example, the type of plate and where to position it; how many and where to position the screws. While there have been a number of experimental and computational studies conducted regarding the configuration of screws in the literature, there is still inadequate information available concerning the influence of screw configuration on fracture healing. Because screw configuration influences the amount of flexibility at the area of fracture, it has a direct influence on the fracture healing process. Therefore, it is important that the chosen screw configuration does not inhibit the healing process. In addition to the impact on the fracture healing process, screw configuration plays an important role in the distribution of stresses in the plate due to the applied loads. A plate that experiences high stresses is prone to early failure. Hence, the screw configuration used should not encourage the occurrence of high stresses. This project develops a computational program in Fortran programming language to perform mathematical optimisation to determine the screw configuration of an internal fixation device within constraints of interfragmentary movement by minimising the corresponding stress in the plate. Thus, the optimal solution suggests the positioning and number of screws which satisfies the predefined constraints of interfragmentary movements. For a set of screw configurations the interfragmentary displacement and the stress occurring in the plate were calculated by the Finite Element Method. The screw configurations were iteratively changed and each time the corresponding interfragmentary displacements were compared with predefined constraints. Additionally, the corresponding stress was compared with the previously calculated stress value to determine if there was a reduction. These processes were continued until an optimal solution was achieved. The optimisation program has been shown to successfully predict the optimal screw configuration in two cases. The first case was a simplified bone construct whereby the screw configuration solution was comparable with those recommended in biomechanical literature. The second case was a femoral construct, of which the resultant screw configuration was shown to be similar to those used in clinical cases. The optimisation method and programming developed in this study has shown that it has potential to be used for further investigations with the improvement of optimisation criteria and the efficiency of the program.