157 resultados para stakeholder views
Resumo:
Introduction Electronic medication administration record (eMAR) systems are promoted as a potential intervention to enhance medication safety in residential aged care facilities (RACFs). The purpose of this study was to conduct an in-practice evaluation of an eMAR being piloted in one Australian RACF before its roll out, and to provide recommendations for system improvements. Methods A multidisciplinary team conducted direct observations of workflow (n=34 hours) in the RACF site and the community pharmacy. Semi-structured interviews (n=5) with RACF staff and the community pharmacist were conducted to investigate their views of the eMAR system. Data were analysed using a grounded theory approach to identify challenges associated with the design of the eMAR system. Results The current eMAR system does not offer an end-to-end solution for medication management. Many steps, including prescribing by doctors and communication with the community pharmacist, are still performed manually using paper charts and fax machines. Five major challenges associated with the design of eMAR system were identified: limited interactivity; inadequate flexibility; problems related to information layout and semantics; the lack of relevant decision support; and system maintenance issues.We suggest recommendations to improve the design of the eMAR system and to optimize existing workflows. Discussion Immediate value can be achieved by improving the system interactivity, reducing inconsistencies in data entry design and offering dedicated organisational support to minimise connectivity issues. Longer-term benefits can be achieved by adding decision support features and establishing system interoperability requirements with stakeholder groups (e.g. community pharmacies) prior to system roll out. In-practice evaluations of technologies like eMAR system have great value in identifying design weaknesses which inhibit optimal system use.
Resumo:
Major infrastructure and construction (MIC) projects are those with significant traffic or environmental impact, of strategic and regional significance and high sensitivity. The decision making process of schemes of this type is becoming ever more complicated, especially with the increasing number of stakeholders involved and their growing tendency to defend their own varied interests. Failing to address and meet the concerns and expectations of stakeholders may result in project failures. To avoid this necessitates a systematic participatory approach to facilitate decision-making. Though numerous decision models have been established in previous studies (e.g. ELECTRE methods, the analytic hierarchy process and analytic network process) their applicability in the decision process during stakeholder participation in contemporary MIC projects is still uncertain. To resolve this, the decision rule approach is employed for modeling multi-stakeholder multi-objective project decisions. Through this, the result is obtained naturally according to the “rules” accepted by any stakeholder involved. In this sense, consensus is more likely to be achieved since the process is more convincing and the result is easier to be accepted by all concerned. Appropriate “rules”, comprehensive enough to address multiple objectives while straightforward enough to be understood by multiple stakeholders, are set for resolving conflict and facilitating consensus during the project decision process. The West Kowloon Cultural District (WKCD) project is used as a demonstration case and a focus group meeting is conducted in order to confirm the validity of the model established. The results indicate that the model is objective, reliable and practical enough to cope with real world problems. Finally, a suggested future research agenda is provided.
Resumo:
Management and business literature affirm the role played by stakeholders in corporate social responsibility (CSR) practices as crucial, but what constitutes a true business–society partnership remains relatively unexplored. This paper aims to improve scholarly and management understanding beyond the usual managers’ perceptions on salience attributes, to include how stakeholders can acquire missing attributes to inform a meaningful partnership. In doing this, a model is proposed which conceptualises CSR practices and outcomes within the frameworks of stakeholder salience via empowerment, sustainable corporate social performances and partnership quality. A holistic discussion leads to generation of propositions on stakeholder salience management, corporate social performance, corporate–community partnership systems and CSR practices, which have both academic and management implications.
Resumo:
Developing major infrastructure and construction (MIC) projects is complicated, since it involves multifaceted policy issues. As a result, appropriate participatory mechanisms have been increasingly employed to improve the legitimacy of the project decision process. Yet it cannot always guarantee a mutually acceptable solution since the expectations and requirements of multiple stakeholders involved can be diverse and even conflicting. Overcoming this necessitates a thorough identification and careful analysis of the expectations of various stakeholder groups in MIC projects. On the other hand, though most project stakeholder concerns are consistent across the globe, contextual differences may lead to diverse priority levels being attached to these factors. This research, therefore, aimed to examine the perceptual differences between paired stakeholder groups from mainland China mega-cities and Hong Kong in rating their concerns over MIC projects. The research findings are expected to benefit both the Central Government of China and the Government of Hong Kong SAR for coping better with the rapid expansion of MIC projects in the territory and the increasing expectations of social equality, and therefore achieving the much desired harmonious development of the community.
Resumo:
The National Energy Efficient Building Project (NEEBP) Phase One report, published in December 2014, investigated “process issues and systemic failures” in the administration of the energy performance requirements in the National Construction Code. It found that most stakeholders believed that under-compliance with these requirements is widespread across Australia, with similar issues being reported in all states and territories. The report found that many different factors were contributing to this outcome and, as a result, many recommendations were offered that together would be expected to remedy the systemic issues reported. To follow up on this Phase 1 report, three additional projects were commissioned as part of Phase 2 of the overall NEEBP project. This Report deals with the development and piloting of an Electronic Building Passport (EBP) tool – a project undertaken jointly by pitt&sherry and a team at the Queensland University of Technology (QUT) led by Dr Wendy Miller. The other Phase 2 projects cover audits of Class 1 buildings and issues relating to building alterations and additions. The passport concept aims to provide all stakeholders with (controlled) access to the key documentation and information that they need to verify the energy performance of buildings. This trial project deals with residential buildings but in principle could apply to any building type. Nine councils were recruited to help develop and test a pilot electronic building passport tool. The participation of these councils – across all states – enabled an assessment of the extent to which these councils are currently utilising documentation; to track the compliance of residential buildings with the energy performance requirements in the National Construction Code (NCC). Overall we found that none of the participating councils are currently compiling all of the energy performance-related documentation that would demonstrate code compliance. The key reasons for this include: a major lack of clarity on precisely what documentation should be collected; cost and budget pressures; low public/stakeholder demand for the documentation; and a pragmatic judgement that non-compliance with any regulated documentation requirements represents a relatively low risk for them. Some councils reported producing documentation, such as certificates of final completion, only on demand, for example. Only three of the nine council participants reported regularly conducting compliance assessments or audits utilising this documentation and/or inspections. Overall we formed the view that documentation and information tracking processes operating within the building standards and compliance system are not working to assure compliance with the Code’s energy performance requirements. In other words the Code, and its implementation under state and territory regulatory processes, is falling short as a ‘quality assurance’ system for consumers. As a result it is likely that the new housing stock is under-performing relative to policy expectations, consuming unnecessary amounts of energy, imposing unnecessarily high energy bills on occupants, and generating unnecessary greenhouse gas emissions. At the same time, Councils noted that the demand for documentation relating to building energy performance was low. All the participant councils in the EBP pilot agreed that documentation and information processes need to work more effectively if the potential regulatory and market drivers towards energy efficient homes are to be harnessed. These findings are fully consistent with the Phase 1 NEEBP report. It was also agreed that an EBP system could potentially play an important role in improving documentation and information processes. However, only one of the participant councils indicated that they might adopt such a system on a voluntary basis. The majority felt that such a system would only be taken up if it were: - A nationally agreed system, imposed as a mandatory requirement under state or national regulation; - Capable of being used by multiple parties including councils, private certifiers, building regulators, builders and energy assessors in particular; and - Fully integrated into their existing document management systems, or at least seamlessly compatible rather than a separate, unlinked tool. Further, we note that the value of an EBP in capturing statistical information relating to the energy performance of buildings would be much greater if an EBP were adopted on a nationally consistent basis. Councils were clear that a key impediment to the take up of an EBP system is that they are facing very considerable budget and staffing challenges. They report that they are often unable to meet all community demands from the resources available to them. Therefore they are unlikely to provide resources to support the roll out of an EBP system on a voluntary basis. Overall, we conclude from this pilot that the public good would be well served if the Australian, state and territory governments continued to develop and implement an Electronic Building Passport system in a cost-efficient and effective manner. This development should occur with detailed input from building regulators, the Australian Building Codes Board (ABCB), councils and private certifiers in the first instance. This report provides a suite of recommendations (Section 7.2) designed to advance the development and guide the implementation of a national EBP system.
Resumo:
Australia is a vast land and access to quality higher education is challenging for many Australians that live outside the larger metropolitan areas. In 2010, the School of Education at an Australian university (Curtin University in Western Australia) moved to flexible delivery of a fully online Bachelor of Education degree for their rural students. The new model of delivery allows access for students from any location provided they have a computer and an internet connection.A number of teaching staff had previously used an asynchronous environment to deliver learning modules housed within a learning management system (LMS) but had not used synchronous software with their students. To enhance the learning environment and to provide high quality learning experiences to students learning at a distance, the adoption of synchronous software (Elluminate Live) was introduced. This software is a real-time virtual classroom environment that allows for communication through Voice over Internet Protocol (VoIP) and video conferencing, alongside a large number of collaboration tools to engage learners.This research paper reports on the integration of a live e-learning solution into the current Learning Management System (LMS) environment. Staff were interviewed about their perceptions and a questionnaire was administered to a sample of students to identify their experience with the synchronous software in order to inform future practice.
Resumo:
Research about disasters in tourism has emerged in earnest since the 1990s covering insights for preparedness and response. However, recently, authors have called for more systematic and holistic approaches to tourism disaster management research. To address this gap, this study adopted a public relations perspective to refocus attention to relationships and stakeholder expectations of destination communities across multiple phases of disaster management. The authors used a mixed method approach and developed a battery of disaster management attributes by conducting interviews and analyzing industry documents and the extant literature. These attributes formed part of a survey of tourism businesses. Exploratory factor analysis resulted in a two factor solution: - i) business disaster preparedness, and; - ii) destination disaster response and recovery. Findings also show that participants reported a gap between the importance and destination performance of these attributes. In particular, tourism businesses perceived destinations did not adequately engage in disaster preparedness activities, which had implications for disaster response and recovery.