Cyclone Yasi struck the Cassowary Coast of Northern Queensland, Australia, in the early hours of February 3, 2011, destroying many homes and property, including the destruction of the Cardwell and district historical society’s premises. With their own homes flattened, many residents were forced to live in mobile accommodation, with extended family, or leave the area altogether. The historical society members seemed, however, particularly devastated by their flattened foreshore museum and loss of their precious collection of material. A call for assistance was made through the Oral History Association of Australia’s Queensland branch (OHAA Qld), which along with a Queensland University of Technology (QUT) research team sponsored a trip to best plan how they could start to pick up the pieces to rebuild the museum. This chapter highlights the need for communities to gather, preserve and present their own stories, in a way that is sustainable and meaningful to them – whether that be because of a disaster, or as they go about life in their contemporary communities – the key being that good advice, professional support and embedded evaluation practices at crucial moments along the way can be critically important.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative infrastructure projects use hybrid formal and informal governance structures to manage transactions. Based on previous desk-top research, the authors identified the key mechanisms underlying project governance, and posited the performance implications of the governance (Chen et al. 2012). The current paper extends that qualitative research by testing the veracity of those findings using data from 320 Australian construction organisations. The results provide, for the first time, reliable and valid scales to measure governance and performance of collaborative projects, and the relationship between them. The results confirm seven of seven hypothesised governance mechanisms; 30 of 43 hypothesised underlying actions; eight of eight hypothesised key performance indicators; and the dual importance of formal and informal governance. A startling finding of the study was that the implementation intensity of informal mechanisms (non-contractual conditions) is a greater predictor of project performance variance than that of formal mechanisms (contractual conditions). Further, contractual conditions do not directly impact project performance; instead their impact is mediated by the non-contractual features of a project. Obligations established under the contract are not sufficient to optimise project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND Research on engineering design is a core area of concern within engineering education and a fundamental understanding of how engineering students approach and undertake design is necessary in order to develop effective design models and pedagogies. Understanding the factors related to design experiences in education and how they affect student practice can help educators as well as designers to leverage these factors as part of the design process. PURPOSE This study investigated the design practices of first-year engineering students’ and their experiences with a first-year engineering course design project. The research questions that guided the investigation were: 1. From a student perspective, what design parameters or criteria are most important? 2. How does this perspective impact subsequent student design practice throughout the design process? DESIGN/METHOD The authors employed qualitative multi-case study methods (Miles & Huberman, 1994) in order to the answer the research questions. Participant teams were observed and video recorded during team design meetings in which they researched the background for the design problem, brainstormed and sketched possible solutions, as well as built prototypes and final models of their design solutions as part of a course design project. Analysis focused on explanation building (Yin, 2009) and utilized within-case and cross-case analysis (Miles & Huberman, 1994). RESULTS We found that students focused disproportionally on the functional parameter, i.e. the physical implementation of their solution, and the possible/applicable parameter, i.e. a possible and applicable solution that benefited the user, in comparison to other given parameters such as safety and innovativeness. In addition, we found that individual teams focused on the functional and possible/ applicable parameters in early design phases such as brainstorming/ ideation and sketching. When prompted to discuss these non-salient parameters (from the student perspective) in the final design report, student design teams often used a post-hoc justification to support how the final designs fit the parameters that they did not initially consider. CONCLUSIONS This study suggests is that student design teams become fixated on (and consequently prioritize) certain parameters they interpret as important because they feel these parameters were described more explicitly in terms how they were met and assessed. Students fail to consider other parameters, perceived to be less directly assessable, unless prompted to do so. Failure to consider other parameters in the early design phases subsequently affects their approach in design phases as well. Case studies examining students’ study strategies within three Australian Universities illustrate similarities with some student approaches to design.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper discusses the opportunities and challenges that arise within storytelling projects that are facilitated by public service broadcasters and that aim to amplify the voices of ‘ordinary people’. In particular, it focuses on two of the Australian Broadcasting Corporation’s current life storytelling projects: ABC Open and Heywire.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This thesis identifies attributes, skills and behaviours that major project managers require for stakeholder relationships competence and project success within a major project environment. It develops valid and reliable measures of internal and external stakeholder relationships competence, tests a complex conceptual model and explores the effectiveness of the QUT Executive Masters of Complex Project Management and Strategic Procurement in developing major project managers' stakeholder relationships competence. Implications of this thesis are for government and industry in identifying factors associated with major project success, as this will lead to better major project outcomes potentially resulting in time and monetary savings of years and billions of dollars.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Gross value of cons truction work in the repair , maintenance, minor alte ration and addition (RMAA) sector in Hong Kong has expanded dramatically by 58% from 1998 to 2007, accounting for over 53% of the whole construction market in 2007. Unfortunately, the portion of industrial accidents arising from this sector also increased substantially during the same period. It is important to improve the safety performance of the RMAA sector. This paper has set out the objectives to examine safety statistics of RMAA works; to compare them with those of green field projects; and more importantly, to highlight potential hurdles en countered in the process of comparison and finally to provide effective recommendations for overcoming these impediments. To strive for continuous safety improvement of RMAA works, comparable safety statistics should be compiled for this sector.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was a step forward in developing an extension of the concept of constructability to include the post-occupancy stages of operation and maintenance. This was through an in-depth study of Australian health projects and interviews with professionals in the field. The thesis investigated how the operation and maintenance stakeholders can enter the initial planning, design and construction phases resulting in more efficient and effective delivery of infrastructure projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The design-build (DB) system is regarded as an effective means of delivering sustainable buildings. Specifying clear sustainability requirements to potential contractors is of great importance to project success. This research investigates the current state-of-the-practice for the definition of sustainability requirements within the public sectors of the U.S. construction market using a robust content analysis of 49 DB requests for proposals (RFPs). The results reveal that owners predominantly communicate their desired level of sustainability through the LEED certification system. The sustainability requirement has become an important dimension for the best-value evaluation of DB contractors with specific importance weightings of up to 25%. Additionally, owners of larger projects and who provide less design information in their RFPs generally allocate significantly higher importance weightings to sustainability requirements. The primary knowledge contribution of this study to the construction industry is the reveal of current trend in DB procurement for green projects. The findings also provide owners, architects, engineers, and constructors with an effective means of communicating sustainability objectives in solicitation documents.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Civil infrastructure and especially roads are being impacted with increasing frequency by flood, Tsunami, cyclone related natural and manmade disasters in the world. Responding to such events and in preparing for more regular and intense climate-change induced events in future, the road governing agencies are reviewing how postdisaster road infrastructure recovery projects are best planned and delivered. In particular, there is awareness that rebuilding such infrastructure require sustainable asset management strategies across economic, environmental and social dimensions. A comprehensive asset management framework for pre and post disaster situations can minimize negative impacts on our communities, economy and environment. This research paper is focused on post disaster management in road infrastructures and road infrastructure asset management strategies used by road authorities. Analyzing the implications of disruption to transport network and associated services is an important part of preparing local and regional responses to the impacts of disasters. This research paper will contribute to strategic infrastructure asset planning, management leading to safe, efficient and integrated transport system that supports sustainable economic, social and environmental outcomes. This paper also focuses on proper asset management, governance and engineering principles which should be followed and adopted in post disaster recovery projects to maximize sustainability in environmental, social and economic dimensions.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This project was a step forward in developing a 'descriptive theory' of contracting in the oil and gas industry that reflects the operating environment in which the project manager operates. This study investigates the existing processes and methods used in establishing contracts which are very often prescriptive, and not always appropriate or optimal for a given situation. This study contributes to contracting effectiveness or optimal contracting in the oil and gas industry.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.