523 resultados para Subgrid-scale Modelling
Resumo:
OBJECTIVE The aim of this research project was to obtain an understanding of the barriers to and facilitators of providing palliative care in neonatal nursing. This article reports the first phase of this research: to develop and administer an instrument to measure the attitudes of neonatal nurses to palliative care. METHODS The instrument developed for this research (the Neonatal Palliative Care Attitude Scale) underwent face and content validity testing with an expert panel and was pilot tested to establish temporal stability. It was then administered to a population sample of 1285 neonatal nurses in Australian NICUs, with a response rate of 50% (N 645). Exploratory factor-analysis techniques were conducted to identify scales and subscales of the instrument. RESULTS Data-reduction techniques using principal components analysis were used. Using the criteria of eigenvalues being 1, the items in the Neonatal Palliative Care Attitude Scale extracted 6 factors, which accounted for 48.1% of the variance among the items. By further examining the questions within each factor and the Cronbach’s of items loading on each factor, factors were accepted or rejected. This resulted in acceptance of 3 factors indicating the barriers to and facilitators of palliative care practice. The constructs represented by these factors indicated barriers to and facilitators of palliative care practice relating to (1) the organization in which the nurse practices, (2) the available resources to support a palliative model of care, and (3) the technological imperatives and parental demands. CONCLUSIONS The subscales identified by this analysis identified items that measured both barriers to and facilitators of palliative care practice in neonatal nursing. While establishing preliminary reliability of the instrument by using exploratory factor-analysis techniques, further testing of this instrument with different samples of neonatal nurses is necessary using a confirmatory factor-analysis approach.
Resumo:
Reflecting its importance to thc financial success of organisations, interest in consumer loyalty continues unabated. However, there are still many unanswered questions about its conceptualisation and measurement.These questions must he resolved before academics and practitioners can usefully apply the concept. We argue that consumer loyalty is best conceptualised as a multi-dimensional phenomenon. Based on this multi-dimensional view, we develop and test a new measure of consumer loyalty. We hypothesise a threedimensional structure containing affective, temporal and instrumental dimensions, Results from a preliminary test are reported. The results indicate that the construct can be reprcxeuted with two dimensions: affective and temporal loyally. As an additional check on the reliability of our results, we find significant correlations between these two dimensions and a measure of behavioural loyalty.
Resumo:
This paper draws on a study of government initiat ives aimed at facilitating economic development, specifically the Multifunction Polis Feasibility Study involving the governments and business enterprises of Australia and Japan (1987-1991). Large scale projects that involve collaboration between gove rnment and business (termed: large scale collaborative venture LSCV)are identified as one aspect of competing in the new economy . The study pursued the research propos ition that a LSCV can be effectively facilitated by following a theory based process similar to those in corporate practice. An approach to managing such ventures is outlined, based on strategic marketing theory that may enhance their success and thereby help countries part icipate more successfully in global competition through such ventures.
Resumo:
This paper relates to government initiatives which aim at advancing their country’s economic development and investor attractiveness. It identifies large scale projects that involve collaboration between government and business (termed: large scale collaborative venture – LSCV) as one aspect of competing in the new economy. The study pursued the research proposition that a LSCV can be effectively facilitated by following a theory based process similar to what is used in corporate practice. An approach to managing such ventures is outlined, based on strategic marketing theory applied to a major project, the Multifunction Polis. It is proposed that such an approach may enhance the success of a collaborative venture and thereby help countries participate more successfully in global competition through such ventures.
Resumo:
This paper assesses and compares the performances of two daylight collection strategies, one passive and one active, for large-scale mirrored light pipes (MLP) illuminating deep plan buildings. Both strategies use laser cut panels (LCP) as the main component of the collection system. The passive system comprises LCPs in pyramid form, whereas the active system uses a tiled LCP on a simple rotation mechanism that rotates 360° in 24 hours. Performance is assessed using scale model testing under sunny sky conditions and mathematical modelling. Results show average illuminance levels for the pyramid LCP ranging from 50 to 250 lux and 150 to 200 lux for the rotating LCPs. Both systems improve the performance of a MLP. The pyramid LCP increases the performance of a MLP by 2.5 times and the rotating LCP by 5 times, when compared to an open pipe particularly for low sun elevation angles.
Resumo:
Selecting an appropriate business process modelling technique forms an important task within the methodological challenges of a business process management project. While a plethora of available techniques has been developed over the last decades, there is an obvious shortage of well-accepted reference frameworks that can be used to evaluate and compare the capabilities of the different techniques. Academic progress has been made at least in the area of representational analyses that use ontology as a benchmark for such evaluations. This paper reflects on the comprehensive experiences with the application of a model based on the Bunge ontology in this context. A brief overview of the underlying research model characterizes the different steps in such a research project. A comparative summary of previous representational analyses of process modelling techniques over time gives insights into the relative maturity of selected process modelling techniques. Based on these experiences suggestions are made as to where ontology-based representational analyses could be further developed and what limitations are inherent to such analyses.
Resumo:
In architecture courses, instilling a wider understanding of the industry specific representations practiced in the Building Industry is normally done under the auspices of Technology and Science subjects. Traditionally, building industry professionals communicated their design intentions using industry specific representations. Originally these mainly two dimensional representations such as plans, sections, elevations, schedules, etc. were produced manually, using a drawing board. Currently, this manual process has been digitised in the form of Computer Aided Design and Drafting (CADD) or ubiquitously simply CAD. While CAD has significant productivity and accuracy advantages over the earlier manual method, it still only produces industry specific representations of the design intent. Essentially, CAD is a digital version of the drawing board. The tool used for the production of these representations in industry is still mainly CAD. This is also the approach taken in most traditional university courses and mirrors the reality of the situation in the building industry. A successor to CAD, in the form of Building Information Modelling (BIM), is presently evolving in the Construction Industry. CAD is mostly a technical tool that conforms to existing industry practices. BIM on the other hand is revolutionary both as a technical tool and as an industry practice. Rather than producing representations of design intent, BIM produces an exact Virtual Prototype of any building that in an ideal situation is centrally stored and freely exchanged between the project team. Essentially, BIM builds any building twice: once in the virtual world, where any faults are resolved, and finally, in the real world. There is, however, no established model for learning through the use of this technology in Architecture courses. Queensland University of Technology (QUT), a tertiary institution that maintains close links with industry, recognises the importance of equipping their graduates with skills that are relevant to industry. BIM skills are currently in increasing demand throughout the construction industry through the evolution of construction industry practices. As such, during the second half of 2008, QUT 4th year architectural students were formally introduced for the first time to BIM, as both a technology and as an industry practice. This paper will outline the teaching team’s experiences and methodologies in offering a BIM unit (Architectural Technology and Science IV) at QUT for the first time and provide a description of the learning model. The paper will present the results of a survey on the learners’ perspectives of both BIM and their learning experiences as they learn about and through this technology.
Resumo:
We introduce K-tree in an information retrieval context. It is an efficient approximation of the k-means clustering algorithm. Unlike k-means it forms a hierarchy of clusters. It has been extended to address issues with sparse representations. We compare performance and quality to CLUTO using document collections. The K-tree has a low time complexity that is suitable for large document collections. This tree structure allows for efficient disk based implementations where space requirements exceed that of main memory.
Resumo:
This study investigated the mediating effect of learner selfconcept between conceptions of learning and students' approaches to learning using structural equation modelling. Data were collected using a modified version of Biggs' Learning Process Questionnaire, together with the recently developed 'What is Learning Survey' and 'Learner Self-Concept Scale'. A sample of 355 high school students participated in the study. Results indicate that learner self-concept does mediate between conceptions of meaning and approaches to learning. Students who adopted a deep approach liked learning new things and indirectly viewed learning as experiential, involving social interaction and directly viewed learning as personal development. Implications for teachers are discussed, with consideration given to appropriate classroom practice.
Resumo:
“SOH see significant benefit in digitising its drawings and operation and maintenance manuals. Since SOH do not currently have digital models of the Opera House structure or other components, there is an opportunity for this national case study to promote the application of Digital Facility Modelling using standardized Building Information Models (BIM)”. The digital modelling element of this project examined the potential of building information models for Facility Management focusing on the following areas: • The re-usability of building information for FM purposes • BIM as an Integrated information model for facility management • Extendibility of the BIM to cope with business specific requirements • Commercial facility management software using standardised building information models • The ability to add (organisation specific) intelligence to the model • A roadmap for SOH to adopt BIM for FM The project has established that BIM – building information modelling - is an appropriate and potentially beneficial technology for the storage of integrated building, maintenance and management data for SOH. Based on the attributes of a BIM, several advantages can be envisioned: consistency in the data, intelligence in the model, multiple representations, source of information for intelligent programs and intelligent queries. The IFC – open building exchange standard – specification provides comprehensive support for asset and facility management functions, and offers new management, collaboration and procurement relationships based on sharing of intelligent building data. The major advantages of using an open standard are: information can be read and manipulated by any compliant software, reduced user “lock in” to proprietary solutions, third party software can be the “best of breed” to suit the process and scope at hand, standardised BIM solutions consider the wider implications of information exchange outside the scope of any particular vendor, information can be archived as ASCII files for archival purposes, and data quality can be enhanced as the now single source of users’ information has improved accuracy, correctness, currency, completeness and relevance. SOH current building standards have been successfully drafted for a BIM environment and are confidently expected to be fully developed when BIM is adopted operationally by SOH. There have been remarkably few technical difficulties in converting the House’s existing conventions and standards to the new model based environment. This demonstrates that the IFC model represents world practice for building data representation and management (see Sydney Opera House – FM Exemplar Project Report Number 2005-001-C-3, Open Specification for BIM: Sydney Opera House Case Study). Availability of FM applications based on BIM is in its infancy but focussed systems are already in operation internationally and show excellent prospects for implementation systems at SOH. In addition to the generic benefits of standardised BIM described above, the following FM specific advantages can be expected from this new integrated facilities management environment: faster and more effective processes, controlled whole life costs and environmental data, better customer service, common operational picture for current and strategic planning, visual decision-making and a total ownership cost model. Tests with partial BIM data – provided by several of SOH’s current consultants – show that the creation of a SOH complete model is realistic, but subject to resolution of compliance and detailed functional support by participating software applications. The showcase has demonstrated successfully that IFC based exchange is possible with several common BIM based applications through the creation of a new partial model of the building. Data exchanged has been geometrically accurate (the SOH building structure represents some of the most complex building elements) and supports rich information describing the types of objects, with their properties and relationships.
Resumo:
This Digital Modelling Report incorporates the previous research completed for the FM Exemplar Project utilising the Sydney Opera House as a case study. The research has demonstrated significant benefits in digitising design documentation and operational and maintenance manuals. Since Sydney Opera House do not have digital models of its structure, there is an opportunity to investigate the application of Digital Facility Modelling using standardised Building Information Models (BIM). The digital modelling research project has examined the potential of standardised building information models to develop a digital facility model supporting facilities management (FM). The focus of this investigation was on the following areas: • The re-usability of standardised building information models (BIM) for FM purposes. • The potential of BIM as an information framework acting as integrator for various FM data sources. • The extendibility and flexibility of the BIM to cope with business specific data and requirements. • Commercial FM software using standardised building information models. • The ability to add (organisation-specific) intelligence to the model. • A roadmap for Sydney Opera House to adopt BIM for FM.