281 resultados para Southwell Friendly Institution.


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dwell times at stations and inter-station run times are the two major operational parameters to maintain train schedule in railway service. Current practices on dwell-time and run-time control are that they are only optimal with respect to certain nominal traffic conditions, but not necessarily the current service demand. The advantages of dwell-time and run-time control on trains are therefore not fully considered. The application of a dynamic programming approach, with the aid of an event-based model, to devise an optimal set of dwell times and run times for trains under given operational constraints over a regional level is presented. Since train operation is interactive and of multi-attributes, dwell-time and run-time coordination among trains is a multi-dimensional problem. The computational demand on devising trains' instructions, a prime concern in real-time applications, is excessively high. To properly reduce the computational demand in the provision of appropriate dwell times and run times for trains, a DC railway line is divided into a number of regions and each region is controlled by a dwell- time and run-time controller. The performance and feasibility of the controller in formulating the dwell-time and run-time solutions for real-time applications are demonstrated through simulations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

With daily commercial and social activity in cities, regulation of train service in mass rapid transit railways is necessary to maintain service and passenger flow. Dwell-time adjustment at stations is one commonly used approach to regulation of train service, but its control space is very limited. Coasting control is a viable means of meeting the specific run-time in an inter-station run. The current practice is to start coasting at a fixed distance from the departed station. Hence, it is only optimal with respect to a nominal operational condition of the train schedule, but not the current service demand. The advantage of coasting can only be fully secured when coasting points are determined in real-time. However, identifying the necessary starting point(s) for coasting under the constraints of current service conditions is no simple task as train movement is governed by a large number of factors. The feasibility and performance of classical and heuristic searching measures in locating coasting point(s) is studied with the aid of a single train simulator, according to specified inter-station run times.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Policymakers often propose strict enforcement strategies to fight the shadow economy and to increase tax morale. However, there is an alternative bottom-up approach that decentralises political power to those who are close to the problems. This paper analyses the relationship with local autonomy. We use data on tax morale at the individual level and macro data on the size of the shadow economy to analyse the relevance of local autonomy and compliance in Switzerland. The findings suggest that there is a positive (negative) relationship between local autonomy and tax morale (size of the shadow economy).

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Digital platforms in cultural institutions offer exciting opportunities for oral history and digital storytelling that can augment and enrich traditional collections. The way in which cultural institutions allow access to the public is changing dramatically, prompting substantial expansions of their oral history and digital story holdings. In Queensland, Australia, public libraries and museums are becoming innovative hubs of a wide assortment of collections that represent a cross-section of community groups and organisations through the integration of oral history and digital storytelling. The State Library of Queensland (SLQ) features digital stories online to encourage users to explore what the institution has in the catalogue through their website. Now SLQ also offers oral history interviews online, to introduce users to oral history and other components of their collections,- such as photographs and documents to current, as well as new users. This includes the various departments, Indigenous centres and regional libraries affiliated with SLQ statewide, who are often unable to access the materials held within, or even full information about, the collections available within the institution. There has been a growing demand for resources and services that help to satisfy community enthusiasm and promote engagement. Demand increases as public access to affordable digital media technologies increases, and as community or marginalised groups become interested in do it yourself (DIY) history; and SLQ encourages this. This paper draws on the oral history and digital story-based research undertaken by the Queensland University of Technology (QUT) for the State Library of Queensland including: the Apology Collection: The Prime Minister’s apology to Australia’s Indigenous Stolen Generation; Five Senses: regional Queensland artists; Gay history of Brisbane; and The Queensland Business Leaders Hall of Fame.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

System analysis within the traction power system is vital to the design and operation of an electrified railway. Loads in traction power systems are often characterised by their mobility, wide range of power variations, regeneration and service dependence. In addition, the feeding systems may take different forms in AC electrified railways. Comprehensive system studies are usually carried out by computer simulation. A number of traction power simulators have been available and they allow calculation of electrical interaction among trains and deterministic solutions of the power network. In the paper, a different approach is presented to enable load-flow analysis on various feeding systems and service demands in AC railways by adopting probabilistic techniques. It is intended to provide a different viewpoint to the load condition. Simulation results are given to verify the probabilistic-load-flow models.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The concept of moving block signallings (MBS) has been adopted in a few mass transit railway systems. When a dense queue of trains begins to move from a complete stop, the trains can re-start in very close succession under MBS. The feeding substations nearby are likely to be overloaded and the service will inevitably be disturbed unless substations of higher power rating are used. By introducing starting time delays among the trains or limiting the trains’ acceleration rate to a certain extent, the peak energy demand can be contained. However, delay is introduced and quality of service is degraded. An expert system approach is presented to provide a supervisory tool for the operators. As the knowledge base is vital for the quality of decisions to be made, the study focuses on its formulation with a balance between delay and peak power demand.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Traffic conflicts at railway junctions are very conmon, particularly on congested rail lines. While safe passage through the junction is well maintained by the signalling and interlocking systems, minimising the delays imposed on the trains by assigning the right-of-way sequence sensibly is a bonus to the quality of service. A deterministic method has been adopted to resolve the conflict, with the objective of minimising the total weighted delay. However, the computational demand remains significant. The applications of different heuristic methods to tackle this problem are reviewed and explored, elaborating their feasibility in various aspects and comparing their relative merits for further studies. As most heuristic methods do not guarantee a global optimum, this study focuses on the trade-off between computation time and optimality of the resolution.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Conflict occurs when two or more trains approach the same junction within a specified time. Such conflicts result in delays. Current practices to assign the right of way at junctions achieve orderly and safe passage of the trains, but do not attempt to reduce the delays. A traffic controller developed in the paper assigns right of way to impose minimum total weighted delay on the trains. The traffic flow model and the optimisation technique used in this controller are described. Simulation studies of the performance of the controller are given.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Fuzzy logic has been applied to control traffic at road junctions. A simple controller with one fixed rule-set is inadequate to minimise delays when traffic flow rate is time-varying and likely to span a wide range. To achieve better control, fuzzy rules adapted to the current traffic conditions are used.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

In general, simple and traditional methods are applied to resolve traffic conflicts at railway junctions. They are, however, either inefficient or computationally demanding. A simple genetic algorithm is presented to enable a search for a near optimal resolution to be carried out while meeting the constraints on generation evolution and minimising the search time.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A new explicit rate allocation algorithm is proposed for achieving generic weight-proportional max-min (GWPMM) fairness in asynchronous transfer mode (ATM) available bit rate services. This algorithm scales well with a fixed computational complexity of O(1) and can realise GWPMM fair rate allocation in an ATM network accurately.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A hybrid genetic algorithm/scaled conjugate gradient regularisation method is designed to alleviate ANN `over-fitting'. In application to day-ahead load forecasting, the proposed algorithm performs better than early-stopping and Bayesian regularisation, showing promising initial results.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

High reliability of railway power systems is one of the essential criteria to ensure quality and cost-effectiveness of railway services. Evaluation of reliability at system level is essential for not only scheduling maintenance activities, but also identifying reliability-critical components. Various methods to compute reliability on individual components or regularly structured systems have been developed and proven to be effective. However, they are not adequate for evaluating complicated systems with numerous interconnected components, such as railway power systems, and locating the reliability critical components. Fault tree analysis (FTA) integrates the reliability of individual components into the overall system reliability through quantitative evaluation and identifies the critical components by minimum cut sets and sensitivity analysis. The paper presents the reliability evaluation of railway power systems by FTA and investigates the impact of maintenance activities on overall reliability. The applicability of the proposed methods is illustrated by case studies in AC railways.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Condition monitoring on rails and train wheels is vitally important to the railway asset management and the rail-wheel interactions provide the crucial information of the health state of both rails and wheels. Continuous and remote monitoring is always a preference for operators. With a new generation of strain sensing devices in Fibre Bragg Grating (FBG) sensors, this study explores the possibility of continuous monitoring of the health state of the rails; and investigates the required signal processing techniques and their limitations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Maintenance activities in a large-scale engineering system are usually scheduled according to the lifetimes of various components in order to ensure the overall reliability of the system. Lifetimes of components can be deduced by the corresponding probability distributions with parameters estimated from past failure data. While failure data of the components is not always readily available, the engineers have to be content with the primitive information from the manufacturers only, such as the mean and standard deviation of lifetime, to plan for the maintenance activities. In this paper, the moment-based piecewise polynomial model (MPPM) are proposed to estimate the parameters of the reliability probability distribution of the products when only the mean and standard deviation of the product lifetime are known. This method employs a group of polynomial functions to estimate the two parameters of the Weibull Distribution according to the mathematical relationship between the shape parameter of two-parameters Weibull Distribution and the ratio of mean and standard deviation. Tests are carried out to evaluate the validity and accuracy of the proposed methods with discussions on its suitability of applications. The proposed method is particularly useful for reliability-critical systems, such as railway and power systems, in which the maintenance activities are scheduled according to the expected lifetimes of the system components.