672 resultados para Project goal


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The construction industry plays a substantial role in a country’s national economy, irrespective of the country’s levels of economic development. The Malaysian Government has given a much needed boost to the country’s construction projects under the 9th Malaysian Plan where a total of 880 projects worth RM15billion (US$48billion) is to be tendered (The Star, 2006). However, Malaysia has not escaped the problems of project failure. In 2005, 17.3% of 417 Malaysian government contracts projects were considered “sick”. Project procurement is one of the most important stages of project delivery. Even though ethics in project procurement has been identified as one of the contributors to project failure, it has not been systematically studied before from the perspective of client in Malaysia. The aim of this paper is to present an exploration to the ethical issues in project procurement in Malaysian public sector projects. By exploring ethical issues from client perspective, this could provide an ethical standpoint for the project life cycle and could maintain a good affiliation between the clients and the customers. It is expected that findings from this review will be somewhat representative of other developing countries.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

There is a need for educational frameworks for computer ethics education. This discussion paper presents an approach to developing students’ moral sensitivity, an awareness of morally relevant issues, in project-based learning (PjBL). The proposed approach is based on a study of IT professionals’ levels of awareness of ethics. These levels are labelled My world, The corporate world, A shared world, The client’s world and The wider world. We give recommendations for how instructors may stimulate students’ thinking with the levels and how the levels may be taken into account in managing a project course and in an IS department. Limitations of the recommendations are assessed and issues for discussion are raised.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Background and Aim: To investigate participation in a second round of colorectal cancer screening using a fecal occult blood test (FOBT) in an Australian rural community, and to assess the demographic characteristics and individual perspectives associated with repeat screening. ---------- Methods: Potential participants from round 1 (50–74 years of age) were sent an intervention package and asked to return a completed FOBT (n = 3406). Doctors of participants testing positive referred to colonoscopy as appropriate. Following screening, 119 participants completed qualitative telephone interviews. Multivariable logistic regression models evaluated the association between round-2 participation and other variables.---------- Results: Round-2 participation was 34.7%; the strongest predictor was participation in round 1. Repeat participants were more likely to be female; inconsistent screeners were more likely to be younger (aged 50–59 years). The proportion of positive FOBT was 12.7%, that of colonoscopy compliance was 98.6%, and the positive predictive value for cancer or adenoma of advanced pathology was 23.9%. Reasons for participation included testing as a precautionary measure or having family history/friends with colorectal cancer; reasons for non-participation included apathy or doctors’ advice against screening.---------- Conclusion: Participation was relatively low and consistent across rounds. Unless suitable strategies are identified to overcome behavioral trends and/or to screen out ineligible participants, little change in overall participation rates can be expected across rounds.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Effective knowledge transfer between infrastructure projects plays a significant role in organisational success and discovery of new technologies, helping to achieve and maintain competitive advantage and, in effect, sustainable infrastructure development. Knowledge is recognised as an important organisational asset that adds value while being shared. To date, research on knowledge transfer has focused on traditional (functional) types of organisations. However, existing knowledge transfer approaches fail to address the issue of unique characteristics of project-based organisations, and the fact that functional and project-based organisations significantly differ in terms of structure, processes, and characteristics. Therefore, there is a need for a different, separate approach for managing knowledge in the project environment. The aim of this chapter is to highlight this need. An extensive literature review is provided on the areas of project management, knowledge management, and organisational structure; this is further supported by empirical evidence from interviews with project management practitioners. Conducting a ‘cross-field’ literature review provides a better understanding of the knowledge transfer mechanisms and its application to projects, and of the importance of knowledge transfer across projects. This research is crucial to gaining a better understanding of knowledge transfer in the project environment. It stresses that there are dissimilarities between project-based organisations and functional organisations in terms of organisational structure, duration of processes, viewpoint of time, response to change, and mobility of people, and that there is a need for a unique strategic approach in order to achieve effective transfer of knowledge. Furthermore, findings presented in this chapter reveal key elements that play an important role in across project knowledge transfer. These elements include: social communication, lessons learned databases, and project management offices.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

In sustainable development projects, as well as other types of projects, knowledge transfer is important for the organisations managing the project. Nevertheless, knowledge transfer among employees does not happen automatically and it has been found that the lack of social networks and the lack of trust among employees are the major barriers to effective knowledge transfer. Social network analysis has been recognised as a very important tool for improving knowledge transfer in the project environment. Transfer of knowledge is more effective where it depends heavily on social networks and informal dialogue. Based on the theory of social capital, social capital consists of two parts: conduits network and resource exchange network. This research studies the relationships among performance, the resource exchange network (such as the knowledge network) and the relationship network (such as strong ties network, energy network, and trust network) at the individual and project levels. The aim of this chapter is to present an approach to overcoming the lack of social networks and lack of trust to improve knowledge transfer within project-based organisations. This is to be done by identifying the optimum structure of relationship networks and knowledge networks within small and medium projects. The optimal structure of the relationship networks and knowledge networks is measured using two dimensions: intra-project and inter-project. This chapter also outlines an extensive literature review in the areas of social capital, knowledge management and project management, and presents the conceptual model of the research approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Presented as part of the Sampled Festival at Sadlers Wells UK in January 2009, PIPP #2 continues the exploration of the first installation (PIPP #1 Leeds) and asks audiences to connect with an interactive work presented in the foyer of a major dance festival. Literally choreographing their own dances on the walls of the venue, pedestrians re-connect with the architectural surrounds generating unique memories of self.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The Silk Road Project was a practice-based research project investigating the potential of motion capture technology to inform perceptions of embodiment in dance performance. The project created a multi-disciplinary collaborative performance event using dance performance and real-time motion capture at Deakin University’s Deakin Motion Lab. Performances at Deakin University, December 2007.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Carbon capture and storage (CCS) is considered to be an integral transitionary measure in the mitigation of the global greenhouse gas emissions from our continued use of fossil fuels. Regulatory frameworks have been developed around the world and pilot projects have been commenced. However, CCS processes are largely untested at commercial scales and there are many unknowns associated with the long terms risks from these storage projects. Governments, including Australia, are struggling to develop appropriate, yet commercially viable, regulatory approaches to manage the uncertain long term risks of CCS activities. There have been numerous CCS regimes passed at the Federal, State and Territory levels in Australia. All adopt a different approach to the delicate balance facilitating projects and managing risk. This paper will examine the relatively new onshore and offshore regimes for CCS in Australia and the legal issues arising in relation to the implementation of CCS projects. Comparisons will be made with the EU CCS Directive where appropriate.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper reports on a mathematics education research project centred on teachers’ pedagogical practices and capacity to assess Indigenous Australian students in a culture-fair manner. The project has been funded by the Australian Research Council Linkage program and is being conducted in seven Catholic and Independent primary schools in north Queensland. Our Industry Partners are Catholic Education and the Association of Independent Schools, Queensland. The study aims to provide greater understanding about how to build more equitable assessment practices to address the issue of underperforming Aboriginal and Torres Strait Islander (ATSI) students in regional and remote Australia. The goal is to identify ways forward by attending to culture-fair assessment practice. The research is exploring the attitudes, beliefs and responses of Indigenous students to assessment in the context of mathematics learning with particular focus on teacher knowledge in these educational settings in relation to the design of assessment tasks that are authentic and engaging for these students in an accountability context. This approach highlights how teachers need to distinguish the ‘funds of knowledge’ (González, Moll, Floyd Tenery, Rivera, Rendón, Gonzales & Amanti, 2008) that Indigenous students draw on and how teachers need to be culturally responsive in their pedagogy to open up curriculum and assessment practice to allow for different ways of knowing and being

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The increasing prevalence of new media technologies and the rise of citizen journalism has coincided with a crisis in industrial journalism –as the figure of the "journalist as hero" is fading, new media forms have facilitated the production of news content "from below" by citizens and "pro-am" journalists. Participation in an action-research project run during the 2007 Australian Federal Election, youdecide 2007, allowed the authors to gain first-hand insights into the progress of citizen-led news media in Australia, but also allowed us to develop an account of what the work of facilitating citizen journalism involves. These insights are important to understanding the future of professional journalism and journalism education, as more mainstream media organizations move to accommodate and harness user-created content. The paper considers the relevance of citizen journalism projects as forms of R&D for understanding news production and distribution in participatory media cultures, and the importance of grounded case studies for moving beyond normative debates about new media and the future of journalism.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Project focused group work is significant in developing social and personal skills as well as extending the ability to identify, formulate and solve engineering problems. As a result of increasing undergraduate class sizes, along with the requirement for many students to work part-time, group projects, peer and collaborative learning are seen as a fundamental part of engineering education. Group formation, connection to learning objectives and fairness of assessment has been widely reported as major issues that leave students dissatisfied with group project based units. Several strategies were trialled including a study of formation of groups by different methods across two engineering disciplines over the past 2 years. Other strategies involved a more structured approach to assessment practices of civil and electrical engineering disciplines design units. A confidential online teamwork management tool was used to collect and collate student self and peer assessment ratings and used for both formative feedback as well as assessment purposes. Student satisfaction and overall academic results in these subjects have improved since the introduction of these interventions. Both student and staff feedback highlight this approach as enhancing student engagement and satisfaction, improved student understanding of group roles, reducing number of dysfunctional groups whilst requiring less commitment of academic resources.