Project diagnostics : assessing the condition of projects and identifying poor health combing forces
Resumo:
In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.
Resumo:
Project Diagnostics is a tool for construction industry stakeholders wishing to improve project delivery and outcomes. This software identifies areas of poor project health, then establishes probable root causes and provides suggested remedial measures. Its focus is to act as an advanced warning system for construction projects that are failing to meet predetermined objectives based on the critical success factors (CSFs) of cost, time, quality, safety, relationships, environment and stakeholder value.
Resumo:
The literature and anecdotal evidence suggests that that there is more to tenancy selection (firm location) than the profit maximisation drive that traditional neo-classical economic location theory suggests. In the first instance these models assume property markets are rational and perfectly competitive; the CBD office market is clearly neither rational nor perfectly competitive. This fact alone relegates such models to the margins of usefulness for an industry that seeks to satisfy tenant demand in order to optimise returns on capital invested. Acknowledgment of property market imperfections are universally accepted to the extent that all contemporary texts discuss the lack of a coherent centralised market place and incomplete and poorly disseminated information processes as fundamental inadequacies which characterise the property market inefficiencies. Less well researched are the facets of the market which allow the observer to determine market activity to be significantly irrational. One such facet is that of ‘decision maker preferences’. The decision to locate a business operation at one location as opposed to another seems ostensibly a routine choice based on short, medium and long term business objectives. These objectives are derived from a process of strategic planning by one or more individuals whose goal is held to be to optimise outcomes which benefit the business (and presumably those employed within it). However the decision making processes appear bounded by how firms function, the institutional context in which they operate, as well as by opportunistic behaviour by individual decision makers who allow personal preferences to infiltrate and ‘corrupt’ the process. In this way, history, culture, geography, as well as institutions all become significant to the extent that these influence and shape individual behaviour which in turn determine the morphology of individual preferences, as well as providing a conduit for them to take effect. This paper exams historical and current literature on the impact of individual behaviour in the decision making process within organisations as a precursor to an investigation of the tenancy decision making process within the CBD office market. Literature on the topic falls within a number of research disciplines, philosophy, psychology and economics to name a few.
Resumo:
Queensland Department of Main Roads, Australia, spends approximately A$ 1 billion annually for road infrastructure asset management. To effectively manage road infrastructure, firstly road agencies not only need to optimise the expenditure for data collection, but at the same time, not jeopardise the reliability in using the optimised data to predict maintenance and rehabilitation costs. Secondly, road agencies need to accurately predict the deterioration rates of infrastructures to reflect local conditions so that the budget estimates could be accurately estimated. And finally, the prediction of budgets for maintenance and rehabilitation must provide a certain degree of reliability. This paper presents the results of case studies in using the probability-based method for an integrated approach (i.e. assessing optimal costs of pavement strength data collection; calibrating deterioration prediction models that suit local condition and assessing risk-adjusted budget estimates for road maintenance and rehabilitation for assessing life-cycle budget estimates). The probability concept is opening the path to having the means to predict life-cycle maintenance and rehabilitation budget estimates that have a known probability of success (e.g. produce budget estimates for a project life-cycle cost with 5% probability of exceeding). The paper also presents a conceptual decision-making framework in the form of risk mapping in which the life-cycle budget/cost investment could be considered in conjunction with social, environmental and political issues.
Resumo:
A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.
Resumo:
This paper provides an overview of a new framework for a design stage Building Environmental Assessment (BEA) tool and a discussion of strategic responses to existing tool issues and relative stakeholder requirements that lead to the development of this tool founded on new information and communication technology (ICT) related to developments in 3D CAD technology. After introducing the context of the BEA and some of their team’s new work the authors • Critique current BEA tool theory; • Review previous assessments of stakeholder needs; • Introduce a new framework applied to analyse such tools • Highlight and key results considering illustrative ICT capabilities and • Discuss their potential significance upon BEA tool stakeholders.
Resumo:
Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.
Resumo:
Maintaining the health of a construction project can help to achieve the desired outcomes of the project. An analogy is drawn to the medical process of a human health check where it is possible to broadly diagnose health in terms of a number of key areas such as blood pressure or cholesterol level. Similarly it appears possible to diagnose the current health of a construction project in terms of a number of Critical Success Factors (CSFs) and key performance indicators (KPIs). The medical analogy continues into the detailed investigation phase where a number of contributing factors are evaluated to identify possible causes of ill health and through the identification of potential remedies to return the project to the desired level of health. This paper presents the development of a model that diagnoses the immediate health of a construction project, investigates the factors which appear to be causing the ill health and proposes a remedy to return the project to good health. The proposed model uses the well-established continuous improvement management model (Deming, 1986) to adapt the process of human physical health checking to construction project health.
Resumo:
In moving from lowest cost adversarial based traditional procurement towards value driven methodologies the challenges range from re-engineering the process, to metrics and team alignment. This paper describes research into methodologies which encourage alignment of project partners towards achieving mutually beneficial goals. The research identifies nine variables which influence the achievement of successful projects delivering value. Results from case studies illustrate that not all parties can achieve value for themselves which directs attention to the balance between deliverables and the interests of team members. Re- valuing construction demands refocusing towards the delivery of operational assets and their place in the value system whilst recognising the need to manage the delivery process and the team to align the value to the parties. The objective of the project was to develop tools and recommendations for reform of project delivery in the building and construction industry to transform business-as-usual performance into exceptional performance. Benefits flow not only to the construction industry, but to the community as a whole because a more sophisticated industry can deliver more effective use of assets, financing, operating and maintenance of facilities to suit the community’s needs. This research was funded by the Australian Cooperative Research Centre for Construction Innovation.
Resumo:
A study into best practice project delivery and the development of a suite of products, resources and services to help guide clients and project teams towards the best approach for specific projects.
Resumo:
This paper examines the observable patterns of content creation by Australian political bloggers dur‐ing the 2007 election and its aftermath, thereby providing insight into the level and nature of activity in the Australian political blogosphere during that time. The performance indicators which are identi‐fied through this process enable us to target for further in‐depth research, to be reported in subse‐quent papers, those individual blogs and blog clusters showing especially high or unusual activity as compared to the overall baseline. This research forms the first stage in a larger project to investigate the shape and internal dynamics of the Australian political blogosphere. In this first stage, we tracked the activities of some 230 political blogs and related Websites in Australia from 2 November 2007 (the final month of the federal election campaign, with the election itself taking place on 24 Novem‐ber) to 24 January 2008. We harvested more than 65,000 articles for this study.
Resumo:
Construction organisations comprise geographically dispersed virtually-linked suborganisations that work together to realise projects. They increasingly do so using information and communication technology (ICT) to communicate, coordinate their activities and to solve complex problems. One salient problem they face is how to effectively use requisite ICT tools. One important tool at their disposal is the self-help group, a body of people that organically spring up to solve shared problems. The more recognised term for this organisational form is a community of practice (COP). COPs generate knowledge networks that enhance and sustain competitive advantage and they are also used to help COP members actually use ICT tools. Etienne Wenger defines communities of practice as “groups of people informally bound together by shared expertise and passion for a joint enterprise” (Wenger and Snyder 2000, p139). This ‘chicken-or-egg’ issue about needing a COP to use the tools that are needed to effective broaden COPs (beyond co-located these groups) led us to explore how best to improve the process of ICT diffusion through construction organisations— primarily using people supported by technology that improves knowledge sharing. We present insights gained from recent PhD research results in this area. A semistructured interview approach was used to collect data from ICT strategists and users in the three large Australian construction organisations that are among the 10 or so first tier companies by annual dollar turnover in Australia. The interviewees were categorised into five organisational levels: IT strategist, implementer, project or engineering manager, site engineer and foreman. The focus of the study was on the organisation and the way that it implements ICT diffusion of a groupware ICT diffusion initiative. Several types of COP networks from the three Australian cases are identified: withinorganisation COP; institutional, implementer or technical support; project manager/engineer focussed; and collegial support. Also, there are cross-organisational COPs that organically emerge as a result of people sharing an interest or experience in something significant. Firstly, an institutional network is defined as a strategic group, interested in development of technology innovation within an organisation. This COP principally links business process domain experts with an ICT strategist.
Resumo:
Many people and organisations continually repeat mistakes or fail to take advantage of opportunities because they have not learned from their past history, frequently as a result of not having taken the time to reflect and take stock of their experiences. This common error is avoidable, particularly with today’s capacity for information and communication technology (ICT) to enable organisations to not only record lessons learned but to easily make these available throughout an organisation. Moreover, the evidence of the literature and experience suggests that currently companies do not rigorously analyse past experience and log lessons learned using manual methods so it is hardly surprising that this trend is not changed by the availability of ICT.
Resumo:
Readers and writers use a variety of modes of inscription – print, oral and multimedia – to understand, analyze, critique and transform their social, cultural and political worlds. Beginning from Freire (1970), ‘critical literacy’ has become a theoretically diverse educational project, drawing from reader response theory, linguistic and grammatical analysis from critical linguistics, feminist, poststructuralist, postcolonial and critical race theory, and cultural and media studies. In the UK, Australia, Canada, South Africa, New Zealand and the US different approaches to critical literacy have been developed in curriculum and schools. These focus on social and cultural analysis and on how print and digital texts and discourses work, with a necessary and delicate tension between classroom emphasis on student and community cultural ‘voice’ and social analysis – and on explicit engagement with the technical features and social uses of written and multimodal texts.