219 resultados para OPM3 (Organizational Project Management Model Maturity)
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Many studies in the area of project management and social networks have identified the significance of project knowledge transfer within and between projects. However, only few studies have examined the intra- and inter-projects knowledge transfer activities. Knowledge in projects can be transferred via face-to-face interactions on the one hand, and via IT-based tools on the other. Although companies have allocated many resources to the IT tools, it has been found that they are not always effectively utilised, and people prefer to look for knowledge using social face-to-face interactions. This paper explores how to effectively leverage two alternative knowledge transfer techniques, face-to-face and IT-based tools to facilitate knowledge transfer and enhance knowledge creation for intra- and inter-project knowledge transfer. The paper extends the previous research on the relationships between and within teams by examining the project’s external and internal knowledge networks concurrently. Social network qualitative analysis, using a case study within a small-medium enterprise, was used to examine the knowledge transfer activities within and between projects, and to investigate knowledge transfer techniques. This paper demonstrates the significance of overlapping employees working simultaneously on two or more projects and their impact on facilitating knowledge transfer between projects within a small/medium organisation. This research is also crucial to gaining better understanding of different knowledge transfer techniques used for intra- and inter-project knowledge exchange. The research provides recommendations on how to achieve better knowledge transfer within and between projects in order to fully utilise a project’s knowledge and achieve better project performance.
Resumo:
Client-side project managers face challenges in motivating project organisations to pursue exceptional design and construction performance. One approach to improving the motivation of project organisations is by offering a financial incentive reward for the achievement of voluntary performance standards above the minimum required standard. However, little investigation has been undertaken into the features of a successful incentive system as a part of an overall procurement strategy. In response to a lack of information available to client-side project managers tasked with the initial design of an incentive system, the paper explores motivation under a successful incentive and identifies key learnings for client-side project managers to consider when designing incentives. Our findings are based on the results of a large Australian case study which is interpreted against a conceptual framework based on both economic and psychological perspectives of motivation. The results suggest that motivation towards incentive goals is influenced by the value the project organisations place on the incentive reward as a commercial opportunity to increase their profit margins. However, perhaps more important are the relationship management processes that promote commitment to the project; and pride in the achievement of project goals. In the case study, these processes intensified the direct motivational effect of the incentive reward on offer. The findings also highlight the importance of ensuring that incentive goals and performance measurement processes remain relevant to the organisations throughout a project to continuously encourage motivation under changing project conditions.
Resumo:
Purpose – One of the critical issues for change management, particularly in relation to the implementation of new technologies, is the existence of prior knowledge and established mental models which may hinder change efforts. Understanding unlearning and how it might assist during organizational change is a way to address this resistance. The purpose of this paper is to present research designed to identify specific factors that facilitate unlearning. Design/methodology/approach – Drawing together issues identified as potential influencers of unlearning, a survey questionnaire was developed and administered in an Australian corporation undergoing large-scale change due to the implementation of an enterprise information system. The results were analyzed to identify specific factors that impact on unlearning. Findings – Findings from this paper identify factors that hinder or help the unlearning process during times of change including understanding the need for change, the level of organizational support and training, assessment of the change, positive experience and informal support, the organization's history of change, individual's prior outlooks, and individuals' feelings and expectations. Research limitations/implications – The use of only one organization does not allow for comparisons between organizations of different sizes, cultures or industries and therefore extension of this research is recommended. Practical implications – For practitioners, this paper provides specific elements at both the level of individuals and the organization that need to be considered for optimal unlearning during times of change. Originality/value – Previous literature on unlearning has been predominantly conceptual and theoretical. These empirical findings serve to further an earlier model based on qualitative research into potential influencers of unlearning.
Resumo:
Infrastructure organisations are operating in an increasingly challenging business environment as a result of globalisation, privatisation and deregulation. Under such circumstances, asset managers need to manage their infrastructure assets effectively in order to contribute to the overall performance of their organisation. In an external business environment that is constantly changing, extant literature on strategic management advocates a resourced--�]based view (RBV) approach that focuses on factors internal to the organisation such as resources and capabilities to sustain organisation performance. The aim of this study is to explore the core capabilities needed in the management of infrastructure assets. Using a multiple case study research strategy focusing on transport infrastructure, this research firstly examines the goals of infrastructure asset management and their alignment with broader corporate goals of an infrastructure organisation. It then examines the strategic infrastructure asset management processes that are needed to achieve these goals. The core capabilities that can support the strategic infrastructure asset management processes are then identified. This research produced a number of findings. First, it provided empirical evidence that asset management goals are being pursued with the aim of supporting the broader business goals of infrastructure organisations. Second, through synthesising the key asset management processes deemed necessary to achieve the asset management goals, a strategic infrastructure asset management model is proposed. Third, it identified five core capabilities namely stakeholder connectivity, cross-functional, relational, technology absorptive and integrated information management capability as central to executing the strategic infrastructure asset management processes well. These findings culminate in the development of a capability model to improve the performance of infrastructure assets.
Resumo:
Construction procurement organisations in the Australian framework provide broad guidelines on project management in setting benchmark performance measurements and processes for evaluating their projects. Despite this, little has been known in the project management practise in transport construction projects in Australia, in particular Queensland. Questionnaire data from 53 project management practitioners employed in State and City public sector organisations in Queensland,suggested that many practitioners in the public sector have little or a lack of understanding of government regulatory policies, which are used as economic evaluation tools for project options. Public sector project managers perceive socio-economic evaluation tools as inappropriate for public sector projects. The survey results also found conducting risk management analysis, developing a risk register and mitigation of risks were most effective way of managing risk. This study provides an opportunity for the public sector to review and provide training on project management practices and government regulatory policies governing public projects. This will improve project management practitioners’ understanding and interpretation of government regulatory policies.
Resumo:
Transport regulators consider that, with respect to pavement damage, heavy vehicles (HVs) are the riskiest vehicles on the road network. That HV suspension design contributes to road and bridge damage has been recognised for some decades. This thesis deals with some aspects of HV suspension characteristics, particularly (but not exclusively) air suspensions. This is in the areas of developing low-cost in-service heavy vehicle (HV) suspension testing, the effects of larger-than-industry-standard longitudinal air lines and the characteristics of on-board mass (OBM) systems for HVs. All these areas, whilst seemingly disparate, seek to inform the management of HVs, reduce of their impact on the network asset and/or provide a measurement mechanism for worn HV suspensions. A number of project management groups at the State and National level in Australia have been, and will be, presented with the results of the project that resulted in this thesis. This should serve to inform their activities applicable to this research. A number of HVs were tested for various characteristics. These tests were used to form a number of conclusions about HV suspension behaviours. Wheel forces from road test data were analysed. A “novel roughness” measure was developed and applied to the road test data to determine dynamic load sharing, amongst other research outcomes. Further, it was proposed that this approach could inform future development of pavement models incorporating roughness and peak wheel forces. Left/right variations in wheel forces and wheel force variations for different speeds were also presented. This led on to some conclusions regarding suspension and wheel force frequencies, their transmission to the pavement and repetitive wheel loads in the spatial domain. An improved method of determining dynamic load sharing was developed and presented. It used the correlation coefficient between two elements of a HV to determine dynamic load sharing. This was validated against a mature dynamic loadsharing metric, the dynamic load sharing coefficient (de Pont, 1997). This was the first time that the technique of measuring correlation between elements on a HV has been used for a test case vs. a control case for two different sized air lines. That dynamic load sharing was improved at the air springs was shown for the test case of the large longitudinal air lines. The statistically significant improvement in dynamic load sharing at the air springs from larger longitudinal air lines varied from approximately 30 percent to 80 percent. Dynamic load sharing at the wheels was improved only for low air line flow events for the test case of larger longitudinal air lines. Statistically significant improvements to some suspension metrics across the range of test speeds and “novel roughness” values were evident from the use of larger longitudinal air lines, but these were not uniform. Of note were improvements to suspension metrics involving peak dynamic forces ranging from below the error margin to approximately 24 percent. Abstract models of HV suspensions were developed from the results of some of the tests. Those models were used to propose further development of, and future directions of research into, further gains in HV dynamic load sharing. This was from alterations to currently available damping characteristics combined with implementation of large longitudinal air lines. In-service testing of HV suspensions was found to be possible within a documented range from below the error margin to an error of approximately 16 percent. These results were in comparison with either the manufacturer’s certified data or test results replicating the Australian standard for “road-friendly” HV suspensions, Vehicle Standards Bulletin 11. OBM accuracy testing and development of tamper evidence from OBM data were detailed for over 2000 individual data points across twelve test and control OBM systems from eight suppliers installed on eleven HVs. The results indicated that 95 percent of contemporary OBM systems available in Australia are accurate to +/- 500 kg. The total variation in OBM linearity, after three outliers in the data were removed, was 0.5 percent. A tamper indicator and other OBM metrics that could be used by jurisdictions to determine tamper events were developed and documented. That OBM systems could be used as one vector for in-service testing of HV suspensions was one of a number of synergies between the seemingly disparate streams of this project.
Resumo:
The concept of asset management is not a new but an evolving idea that has been attracting attention of many organisations operating and/or owning some kind of infrastructure assets. The term asset management have been used widely with fundamental differences in interpretation and usage. Regardless of the context of the usage of the term, asset management implies the process of optimising return by scrutinising performance and making key strategic decisions throughout all phases of an assets lifecycle (Sarfi and Tao, 2004). Hence, asset management is a philosophy and discipline through which organisations are enabled to more effectively deploy their resources to provide higher levels of customer service and reliability while balancing financial objectives. In Australia, asset management made its way into the public works in 1993 when the Australian Accounting Standard Board issued the Australian Accounting Standard 27 – AAS27. Standard AAS27 required government agencies to capitalise and depreciate assets rather than expense them against earnings. This development has indirectly forced organisations managing infrastructure assets to consider the useful life and cost effectiveness of asset investments. The Australian State Treasuries and the Australian National Audit Office was the first organisation to formalise the concepts and principles of asset management in Australia in which they defined asset management as “ a systematic, structured process covering the whole life of an asset”(Australian National Audit Office, 1996). This initiative led other Government bodies and industry sectors to develop, refine and apply the concept of asset management in the management of their respective infrastructure assets. Hence, it can be argued that the concept of asset management has emerged as a separate and recognised field of management during the late 1990s. In comparison to other disciplines such as construction, facilities, maintenance, project management, economics, finance, to name a few, asset management is a relatively new discipline and is clearly a contemporary topic. The primary contributors to the literature in asset management are largely government organisations and industry practitioners. These contributions take the form of guidelines and reports on the best practice of asset management. More recently, some of these best practices have been made to become a standard such as the PAS 55 (IAM, 2004, IAM, 2008b) in UK. As such, current literature in this field tends to lack well-grounded theories. To-date, while receiving relatively more interest and attention from empirical researchers, the advancement of this field, particularly in terms of the volume of academic and theoretical development is at best moderate. A plausible reason for the lack of advancement is that many researchers and practitioners are still unaware of, or unimpressed by, the contribution that asset management can make to the performance of infrastructure asset. This paper seeks to explore the practices of organisations that manage infrastructure assets to develop a framework of strategic infrastructure asset management processes. It will begin by examining the development of asset management. This is followed by the discussion on the method to be adopted for this paper. Next, is the discussion of the result form case studies. It first describes the goals of infrastructure asset management and how they can support the broader business goals. Following this, a set of core processes that can support the achievement of business goals are provided. These core processes are synthesised based on the practices of asset managers in the case study organisations.
Resumo:
The use of appropriate financial incentives within construction projects can contribute to strong alignment of project stakeholder motivation with project goals. However, effective incentive system design can be a challenging task and takes skillful planning by client managers in the early stages of a project. In response to a lack of information currently available to construction clients in this area, this paper explores the features of a successful incentive system and identifies key learnings for client managers to consider when designing incentives. Our findings, based on data from a large Australian case study, suggest that key stakeholders place greater emphasis on the project management processes that support incentives than on the incentive itself. Further, contractors need adequate time and information to accurately estimate construction costs prior to their tender price submission to ensure cost-focused incentive goals remain achievable. Thus, client managers should be designing incentives as part of a supportive procurement strategy to maximize project stakeholder motivation and prevent goal misalignment.
Resumo:
Studies indicate project success should be viewed from the different perspectives of the individual stakeholders. Project managers are owner’s agents. In order to allow early corrective actions to take place in case a project is diverted from plan, to accurately report perceived success of the stakeholders by project managers is essential, though there has been little systematic research in this area. The aim of this paper is to report the findings of an empirical study that compares the level of alignment between project managers and key stakeholders on a list of project performance indicators. A telephone survey involving 18 complex project managers and various key project stakeholder groups was conducted in this study. Krippendorff’s Kappa alpha reliability test was used to assess the alignment levels between project managers and stakeholders. Despite the overall agreement level between project manager and stakeholders is only medium; results have also identified 12 performance indicators that have significant level of agreement between project managers and stakeholders.
Resumo:
Purpose – The construction industry in Australia is characterised by a long work-hours culture, with conditions that make it difficult for staff to balance their work and non-work lives. The objective of this paper is to measure the success of a work-place intervention designed to improve work-life balance (WLB) in an alliance project in the construction industry, and the role the project manager plays in this success. Design/methodology/approach – The paper focuses on an alliance case study. Interviews were conducted at two points in time, several months apart, after the interventions were implemented. Findings – Results showed that staff on the whole were more satisfied with their work experience after the interventions, and indicated the important role that managers' attitudes and behaviours played. Originality/value – Managerial support for work-life initiatives is a critical element in achieving WLB and satisfaction with working arrangements. The fact that the manager “talked the talk and walked the walk” was a major contributing success factor, which has not previously been demonstrated.
Resumo:
Effective knowledge transfer between infrastructure projects plays a significant role in organisational success and discovery of new technologies, helping to achieve and maintain competitive advantage and, in effect, sustainable infrastructure development. Knowledge is recognised as an important organisational asset that adds value while being shared. To date, research on knowledge transfer has focused on traditional (functional) types of organisations. However, existing knowledge transfer approaches fail to address the issue of unique characteristics of project-based organisations, and the fact that functional and project-based organisations significantly differ in terms of structure, processes, and characteristics. Therefore, there is a need for a different, separate approach for managing knowledge in the project environment. The aim of this chapter is to highlight this need. An extensive literature review is provided on the areas of project management, knowledge management, and organisational structure; this is further supported by empirical evidence from interviews with project management practitioners. Conducting a ‘cross-field’ literature review provides a better understanding of the knowledge transfer mechanisms and its application to projects, and of the importance of knowledge transfer across projects. This research is crucial to gaining a better understanding of knowledge transfer in the project environment. It stresses that there are dissimilarities between project-based organisations and functional organisations in terms of organisational structure, duration of processes, viewpoint of time, response to change, and mobility of people, and that there is a need for a unique strategic approach in order to achieve effective transfer of knowledge. Furthermore, findings presented in this chapter reveal key elements that play an important role in across project knowledge transfer. These elements include: social communication, lessons learned databases, and project management offices.
Resumo:
The selection of projects and programs of work is a key function of both public and private sector organisations. Ideally, projects and programs that are selected to be undertaken are consistent with strategic objectives for the organisation; will provide value for money and return on investment; will be adequately resourced and prioritised; will not compete with general operations for resources and not restrict the ability of operations to provide income to the organisation; will match the capacity and capability of the organisation to deliver; and will produce outputs that are willingly accepted by end users and customers. Unfortunately,this is not always the case. Possible inhibitors to optimal project portfolio selection include: processes that are inconsistent with the needs of the organisation; reluctance to use an approach that may not produce predetermined preferences; loss of control and perceived decision making power; reliance on quantitative methods rather than qualitative methods for justification; ineffective project and program sponsorship; unclear project governance, processes and linkage to business strategies; ignorance, taboos and perceived effectiveness; inadequate education and training about the processes and their importance.
Resumo:
The paper addresses the issue of providing access control via delegation and constraint management across multiple security domains. Specifically, this paper proposes a novel Delegation Constraint Management model to manage and enforce delegation constraints across security domains. An algorithm to trace the authority of delegation constraints is introduced as well as an algorithm to form a delegation constraint set and detect/prevent potential conflicts. The algorithms and the management model are built upon a set of formal definitions of delegation constraints. In addition, a constraint profile based on XACML is proposed as a means to express the delegation constraint. The paper also includes a protocol to exchange delegation constraints (in the form of user commitments) between the involved entities in the delegation process.