350 resultados para Input timedelays


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Hydraulic excavators in the mining industry are widely used owing to the large payload capabilities these machines can achieve. However, there are very few optimisation studies for producing efficient hydraulic excavator backets. An efficient bucket can avoid unnecessary weight; greatly influence the payload and optimise the efficiency of hydraulic mining excavators. This paper presents a framework for the development of a scaled hydraulic excavator by examining the geometry and force relationships. A small hydraulic excavator was purchased and fitted with a broom scaled to a factor. Geometric and force relationships of the model were derived to assist computer instrumentation to retrieve necessary variable input for bucket design.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This paper presents a new rat animat, a rat-sized bio-inspired robot platform currently being developed for embodied cognition and neuroscience research. The rodent animat is 150mm x 80mm x 70mm and has a different drive, visual, proximity, and odometry sensors, x86 PC, and LCD interface. The rat animat has a bio-inspired rodent navigation and mapping system called RatSLAM which demonstrates the capabilities of the platform and framework. A case study is presented of the robot's ability to learn the spatial layout of a figure of eight laboratory environment, including its ability to close physical loops based on visual input and odometry. A firing field plot similar to rodent 'non-conjunctive grid cells' is shown by plotting the activity of an internal network. Having a rodent animat the size of a real rat allows exploration of embodiment issues such as how the robot's sensori-motor systems and cognitive abilities interact. The initial observations concern the limitations of the deisgn as well as its strengths. For example, the visual sensor has a narrower field of view and is located much closer to the ground than for other robots in the lab, which alters the salience of visual cues and the effectiveness of different visual filtering techniques. The small size of the robot relative to corridors and open areas impacts on the possible trajectories of the robot. These perspective and size issues affect the formation and use of the cognitive map, and hence the navigation abilities of the rat animat.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Optimal scheduling of voltage regulators (VRs), fixed and switched capacitors and voltage on customer side of transformer (VCT) along with the optimal allocaton of VRs and capacitors are performed using a hybrid optimisation method based on discrete particle swarm optimisation and genetic algorithm. Direct optimisation of the tap position is not appropriate since in general the high voltage (HV) side voltage is not known. Therefore, the tap setting can be determined give the optimal VCT once the HV side voltage is known. The objective function is composed of the distribution line loss cost, the peak power loss cost and capacitors' and VRs' capital, operation and maintenance costs. The constraints are limits on bus voltage and feeder current along with VR taps. The bus voltage should be maintained within the standard level and the feeder current should not exceed the feeder-rated current. The taps are to adjust the output voltage of VRs between 90 and 110% of their input voltages. For validation of the proposed method, the 18-bus IEEE system is used. The results are compared with prior publications to illustrate the benefit of the employed technique. The results also show that the lowest cost planning for voltage profile will be achieved if a combination of capacitors, VRs and VCTs is considered.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

As order dependencies between process tasks can get complex, it is easy to make mistakes in process model design, especially behavioral ones such as deadlocks. Notions such as soundness formalize behavioral errors and tools exist that can identify such errors. However these tools do not provide assistance with the correction of the process models. Error correction can be very challenging as the intentions of the process modeler are not known and there may be many ways in which an error can be corrected. We present a novel technique for automatic error correction in process models based on simulated annealing. Via this technique a number of process model alternatives are identified that resolve one or more errors in the original model. The technique is implemented and validated on a sample of industrial process models. The tests show that at least one sound solution can be found for each input model and that the response times are short.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Pedestrian movement is known to cause significant effects on indoor MIMO channels. In this paper, a statistical characterization of the indoor MIMO-OFDM channel subject ot pedestrian movement is reported. The experiment used 4 sending and 4 receiving antennas and 114 sub-carriers at 5.2 GHz. Measurement scenarios varied from zero to ten pedestrians walking randomly between transmitter (tx) and receiver (Rx) arrays. The empirical cumulative distribution function (CDF) of the received fading envelope fits the Ricean distribution with K factors ranging from 7dB to 15 dB, for the 10 pedestrians and vacant scenarios respectively. In general, as the number of pedestrians increase, the CDF slope tends to decrease proportionally. Furthermore, as the number of pedestrians increase, increasing multipath contribution, the dynamic range of channel capacity increases proportionally. These results are consistent with measurement results obtained in controlled scenarios for a fixed narrowband Single-Input Single-Output (SISO) link at 5.2 GHz in previous work. The described empirical characterization provides an insight into the prediction of human-body shadowing effects for indoor MIMO-OFDM channels at 5.2 GHz.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The purpose of this work is to validate and automate the use of DYNJAWS; a new component module (CM) in the BEAMnrc Monte Carlo (MC) user code. The DYNJAWS CM simulates dynamic wedges and can be used in three modes; dynamic, step-and-shoot and static. The step-and-shoot and dynamic modes require an additional input file defining the positions of the jaw that constitutes the dynamic wedge, at regular intervals during its motion. A method for automating the generation of the input file is presented which will allow for the more efficient use of the DYNJAWS CM. Wedged profiles have been measured and simulated for 6 and 10 MV photons at three field sizes (5 cm x 5 cm , 10 cm x10 cm and 20 cm x 20 cm), four wedge angles (15, 30, 45 and 60 degrees), at dmax and at 10 cm depth. Results of this study show agreement between the measured and the MC profiles to within 3% of absolute dose or 3 mm distance to agreement for all wedge angles at both energies and depths. The gamma analysis suggests that dynamic mode is more accurate than the step-and-shoot mode. The DYNJAWS CM is an important addition to the BEAMnrc code and will enable the MC verification of patient treatments involving dynamic wedges.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

A Simulink Matlab control system of a heavy vehicle suspension has been developed. The aim of the exercise presented in this paper was to develop a Simulink Matlab control system of a heavy vehicle suspension. The objective facilitated by this outcome was the use of a working model of a heavy vehicle (HV) suspension that could be used for future research. A working computer model is easier and cheaper to re-configure than a HV axle group installed on a truck; it presents less risk should something go wrong and allows more scope for variation and sensitivity analysis before embarking on further "real-world" testing. Empirical data recorded as the input and output signals of a heavy vehicle (HV) suspension were used to develop the parameters for computer simulation of a linear time invariant system described by a second-order differential equation of the form: (i.e. a "2nd-order" system). Using the empirical data as an input to the computer model allowed validation of its output compared with the empirical data. The errors ranged from less than 1% to approximately 3% for any parameter, when comparing like-for-like inputs and outputs. The model is presented along with the results of the validation. This model will be used in future research in the QUT/Main Roads project Heavy vehicle suspensions – testing and analysis, particularly so for a theoretical model of a multi-axle HV suspension with varying values of dynamic load sharing. Allowance will need to be made for the errors noted when using the computer models in this future work.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Freeways are divided roadways designed to facilitate the uninterrupted movement of motor vehicles. However, many freeways now experience demand flows in excess of capacity, leading to recurrent congestion. The Highway Capacity Manual (TRB, 1994) uses empirical macroscopic relationships between speed, flow and density to quantify freeway operations and performance. Capacity may be predicted as the maximum uncongested flow achievable. Although they are effective tools for design and analysis, macroscopic models lack an understanding of the nature of processes taking place in the system. Szwed and Smith (1972, 1974) and Makigami and Matsuo (1990) have shown that microscopic modelling is also applicable to freeway operations. Such models facilitate an understanding of the processes whilst providing for the assessment of performance, through measures of capacity and delay. However, these models are limited to only a few circumstances. The aim of this study was to produce more comprehensive and practical microscopic models. These models were required to accurately portray the mechanisms of freeway operations at the specific locations under consideration. The models needed to be able to be calibrated using data acquired at these locations. The output of the models needed to be able to be validated with data acquired at these sites. Therefore, the outputs should be truly descriptive of the performance of the facility. A theoretical basis needed to underlie the form of these models, rather than empiricism, which is the case for the macroscopic models currently used. And the models needed to be adaptable to variable operating conditions, so that they may be applied, where possible, to other similar systems and facilities. It was not possible to produce a stand-alone model which is applicable to all facilities and locations, in this single study, however the scene has been set for the application of the models to a much broader range of operating conditions. Opportunities for further development of the models were identified, and procedures provided for the calibration and validation of the models to a wide range of conditions. The models developed, do however, have limitations in their applicability. Only uncongested operations were studied and represented. Driver behaviour in Brisbane was applied to the models. Different mechanisms are likely in other locations due to variability in road rules and driving cultures. Not all manoeuvres evident were modelled. Some unusual manoeuvres were considered unwarranted to model. However the models developed contain the principal processes of freeway operations, merging and lane changing. Gap acceptance theory was applied to these critical operations to assess freeway performance. Gap acceptance theory was found to be applicable to merging, however the major stream, the kerb lane traffic, exercises only a limited priority over the minor stream, the on-ramp traffic. Theory was established to account for this activity. Kerb lane drivers were also found to change to the median lane where possible, to assist coincident mergers. The net limited priority model accounts for this by predicting a reduced major stream flow rate, which excludes lane changers. Cowan's M3 model as calibrated for both streams. On-ramp and total upstream flow are required as input. Relationships between proportion of headways greater than 1 s and flow differed for on-ramps where traffic leaves signalised intersections and unsignalised intersections. Constant departure onramp metering was also modelled. Minimum follow-on times of 1 to 1.2 s were calibrated. Critical gaps were shown to lie between the minimum follow-on time, and the sum of the minimum follow-on time and the 1 s minimum headway. Limited priority capacity and other boundary relationships were established by Troutbeck (1995). The minimum average minor stream delay and corresponding proportion of drivers delayed were quantified theoretically in this study. A simulation model was constructed to predict intermediate minor and major stream delays across all minor and major stream flows. Pseudo-empirical relationships were established to predict average delays. Major stream average delays are limited to 0.5 s, insignificant compared with minor stream delay, which reach infinity at capacity. Minor stream delays were shown to be less when unsignalised intersections are located upstream of on-ramps than signalised intersections, and less still when ramp metering is installed. Smaller delays correspond to improved merge area performance. A more tangible performance measure, the distribution of distances required to merge, was established by including design speeds. This distribution can be measured to validate the model. Merging probabilities can be predicted for given taper lengths, a most useful performance measure. This model was also shown to be applicable to lane changing. Tolerable limits to merging probabilities require calibration. From these, practical capacities can be estimated. Further calibration is required of traffic inputs, critical gap and minimum follow-on time, for both merging and lane changing. A general relationship to predict proportion of drivers delayed requires development. These models can then be used to complement existing macroscopic models to assess performance, and provide further insight into the nature of operations.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

During secondary fracture healing, various tissue types including new bone are formed. The local mechanical strains play an important role in tissue proliferation and differentiation. To further our mechanobiological understanding of fracture healing, a precise assessment of local strains is mandatory. Until now, static analyses using Finite Elements (FE) have assumed homogenous material properties. With the recent quantification of both the spatial tissue patterns (Vetter et al., 2010) and the development of elastic modulus of newly formed bone during healing (Manjubala et al., 2009), it is now possible to incorporate this heterogeneity. Therefore, the aim of this study is to investigate the effect of this heterogeneity on the strain patterns at six successive healing stages. The input data of the present work stemmed from a comprehensive cross-sectional study of sheep with a tibial osteotomy (Epari et al., 2006). In our FE model, each element containing bone was described by a bulk elastic modulus, which depended on both the local area fraction and the local elastic modulus of the bone material. The obtained strains were compared with the results of hypothetical FE models assuming homogeneous material properties. The differences in the spatial distributions of the strains between the heterogeneous and homogeneous FE models were interpreted using a current mechanobiological theory (Isakson et al., 2006). This interpretation showed that considering the heterogeneity of the hard callus is most important at the intermediate stages of healing, when cartilage transforms to bone via endochondral ossification.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The new configuration proposed in this paper for Marx Generator (MG) aims to generate high voltage for pulsed power applications through reduced number of semiconductor components with a more efficient load supplying process. The main idea is to charge two groups of capacitors in parallel through an inductor and take advantage of resonant phenomenon in charging each capacitor up to a double input voltage level. In each resonant half a cycle, one of those capacitor groups are charged, and eventually the charged capacitors will be connected in series and the summation of the capacitor voltages can be appeared at the output of the topology. This topology can be considered as a modified Marx generator which works based on the resonant concept. Simulated models of this converter have been investigated in Matlab/SIMULINK platform and a prototype set up has been implemented in laboratory. The acquired results of either fully satisfy the anticipations in proper operation of the converter.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

The new configuration proposed in this paper for Marx Generator (MG.) aims to generate high voltage for pulsed power applications through reduced number of semiconductor components with a more efficient load supplying process. The main idea is to charge two groups of capacitors in parallel through an inductor and take the advantage of resonant phenomenon in charging each capacitor up to a double input voltage level. In each resonant half a cycle, one of those capacitor groups are charged, and eventually the charged capacitors will be connected in series and the summation of the capacitor voltages can be appeared at the output of the topology. This topology can be considered as a modified Marx generator which works based on the resonant concept. Simulated models of this converter have been investigated in Matlab/SIMULINK platform and the acquired results fully satisfy the anticipations in proper operation of the converter.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Analytical and closed form solutions are presented in this paper for the vibration response of an L-shaped plate under a point force or a moment excitation. Inter-relationships between wave components of the source and the receiving plates are clearly defined. Explicit expressions are given for the quadratic quantities such as input power, energy flow and kinetic energy distributions of the L-shaped plate. Applications of statistical energy analysis (SEA) formulation in the prediction of the vibration response of finite coupled plate structures under a single deterministic forcing are examined and quantified. It is found that the SEA method can be employed to predict the frequency averaged vibration response and energy flow of coupled plate structures under a deterministic force or moment excitation when the structural system satisfies the following conditions: (1) the coupling loss factors of the coupled subsystems are known; (2) the source location is more than a quarter of the plate bending wavelength away from the source plate edges in the point force excitation case, or is more than a quarter wavelength away from the pair of source plate edges perpendicular to the moment axis in the moment excitation case due to the directional characteristic of moment excitations. SEA overestimates the response of the L-shaped plate when the source location is less than a quarter bending wavelength away from the respective plate edges owing to wave coherence effect at the plate boundary

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Under a Services Agreement dated 16th April 2010 the Australian Capital Territory (ACT) engaged Knowledge Consulting Pty Ltd to conduct an independent review of operations at the Alexander Maconochie Centre (AMC) in the ACT. The Review was commissioned following a motion passed in the ACT Legislative Assembly as follows: “That this Assembly: (1) notes: (a) concerns regarding the operation of the AMC; (b) the unanimous findings of the Standing Committee on Justice and Community Safety report, Inquiry into the delay in the commencement of operations at the Alexander Maconochie Centre; and (c) the Government’s intention to have a review into the operation of the AMC after its first year of operation; and (2) calls on the Government to: (a) commission an independent reviewer to conduct the one year review into the AMC; (b) ensure that the review be open and transparent and public, and include input from community and non-government groups with an interest or involvement in the AMC, including on the terms of reference for the review; (c) ensure the review is completed in a timely manner and be tabled in the Legislative Assembly immediately upon completion; and (d) report upon the progress of the review in August 2010;”

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Numerous econometric models have been proposed for forecasting property market performance, but limited success has been achieved in finding a reliable and consistent model to predict property market movements over a five to ten year timeframe. This research focuses on office rental growth forecasts and overviews many of the office rent models that have evolved over the past 20 years. A model by DiPasquale and Wheaton is selected for testing in the Brisbane, Australia office market. The adaptation of this study did not provide explanatory variables that could assist in developing a reliable, predictive model of office rental growth. In light of this result, the paper suggests a system dynamics framework that includes an econometric model based on historical data as well as user input guidance for the primary variables. The rent forecast outputs would be assessed having regard to market expectations and probability profiling undertaken for use in simulation exercises. The paper concludes with ideas for ongoing research.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

This protocol represents an attempt to assist in the instruction of teamwork assessment for first-year students across QUT. We anticipate that teaching staff will view this protocol as a generic resource in teamwork instruction, processes and evaluation. Teamwork has been acknowledged as a problematic practice at QUT while existing predominantly in importance amongst graduate capabilities for all students at this institution. This protocol is not an extensive document on the complexities and dynamics of teamwork processes, but instead presents itself as a set of best practice guidelines and recommendations to assist in team design, development, management, support and assessment. It is recommended that this protocol be progressively implemented across QUT, not only to attain teamwork teaching consistency, but to address and deal with the misconceptions and conflict around the importance of the teamwork experience. The authors acknowledge the extensive input and contributions from a Teamwork Steering Committee selected from academic staff and administrative members across the institution. As well, we welcome feedback and suggestions to both fine tune and make inclusive those strategies that staff believe add to optimal teamwork outcomes.