352 resultados para Infrastructure and Construction Projects


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian Government and most Australian road authorities have set ambitious greenhouse gas emission (GHGe) reduction targets for the near future, many of which have translated into action plans. However, previous research has shown that the various Australian state road authorities are at different stages of implementing ‘green’ initiatives in construction planning and development, with considerable gaps in their monitoring, tendering, and contracting. This study illustrates the differences between procurement standards and project specific practices that aim to reduce GHGe from road construction projects in three of the largest Australian road construction clients, with a focus on the tools used, contract type and incentives for better performance.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Growing community concerns about the ecological, social, cultural and economic impact of housing and urban projects poses new challenges for those who have to deliver them. It is important that these concerns are addressed as part of the community engagement processes on projects. Community engagement is traditionally perceived as the purview of planners and disconnected from the building construction process. This is despite most project approval processes mandating on-going community engagement over the project’s entire lifetime. There is evidence that point to a culture of ambiguity and ambivalence among building professionals about their roles, responsibilities and expectations of community engagement during the construction phase of projects. This has contributed to a culture of distrust between communities and the construction industry. There is a clear need to build capacity among building professionals to empower them as active participants in community engagement processes which can promote better project outcomes and minimise delays and conflicts. This paper describes a process that utilises the Theory of Planned Behaviour as a framework to equip building professionals with the skills they need to engage effectively with local communities during the construction phase of projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background: Anecdotal evidence from the infrastructure and building sectors highlights issues of alcohol and other drugs (AODs) and its association with safety risk on construction sites. Currently, there is no clear evidence on the prevalence and risk of AOD use among Australian construction workers and there is limited evidential guidance regarding how to effectively address such an issue. Aims: The current research aims to scientifically evaluate the use of AODs within the Australian construction industry in order to reduce the potential resulting safety and performance impacts and engender a cultural change in the workforce. A nationally consistent and collaborative approach across the workforce will be adopted. Methods: A national assessment of the use of AODs was conducted in participating organisations across three states. The World Health Organisation’s Alcohol Use Disorders Identification Test (AUDIT) was used to measure alcohol use. Illicit drug use, ‘readiness to change’, impediments to reducing impairment, feasibility of proposed interventions, and employee attitudes and knowledge regarding AOD was also measured through a combination of survey items and interviews. Through an educative approach and consultation with employers, employees, union groups and leaders in applied AOD research, this assessment was used to inform and support cultural change management of AOD use in the industry. Results: Results (n=494) indicate that as in the general population, a proportion of those sampled in the construction sector may be at risk of hazardous alcohol consumption. A total of 286 respondents (58%) scored above the cut-off cumulative score for risky or hazardous alcohol use. Other drug use was also identified as a major issue. Interview responses and input from all project partners is presented within a guiding principle framework for cultural change. Conclusions: Results support the need for evidence-based, comprehensive and tailored responses in the workplace. This paper will discuss the final results in the context of facilitating cultural change in the construction industry.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Australian economy is currently supported by a resources boom and work opportunities in traditionally male dominated fields of construction and engineering and information technology are at a premium. Yet despite more than 25 years of anti discrimination and equal employment opportunity legislation these industries still employ few women in operational or management roles. This paper investigates the issue of the low representation of women in project management and their different work and career experiences through interviews with male and female project managers.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose Most barriers and enablers of sustainable projects are related to procurement. This study proposes a framework for evaluating green procurement practices throughout the lifecycle of road construction projects and demonstrates its application through an Australian case study. Design/methodology/approach The study is based on linking the phases of road construction with incentive mechanisms for proactively motivating behavioural change. A holistic view on utilised and potential incentives is attempted with a literature review and a state-of-practice review. The latter is based on interviews and 90 policy and procurement documents across five Australian states. Findings An evaluation framework with seven procurement stages is suggested to describe current state green procurement incentives throughout the delivery lifecycle of road construction projects. The Australian case study was found to provide useful data to identify gaps and strong points of the different states regarding their level of integration of sustainability and greenhouse gas emissions GHG) reduction elements in their procurement practices. This understanding was used to draw recommendations on future advancement of green procurement. Originality/value: Government entities across the globe can impact considerably the achievement of sustainability and GHG targets, by using their procurement practices and requirements to create incentives for contractors and suppliers to engage in more GHG conscious practices. The present study provides a systematic account of how green procurement practices can be underpinned using the Australian road construction industry as a case study, and distinguish between strong and weak links in the green procurement chain to draw recommendations for future initiatives.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In Australia, collaborative contracts, and in particular, project alliances, have been increasingly used to govern infrastructure projects. These contracts use formal and informal governance mechanisms to manage the delivery of infrastructure projects. Formal mechanisms such as financial risk sharing are specified in the contract, while informal mechanisms such as integrated teams are not. Given that the literature contains a multiplicity of often untestable definitions, this paper reports on a review of the literature to operationalize the concepts of formal and informal governance. This work is the first phase of a study that will examine the optimal balance of formal and informal governance structures. Desk-top review of leading journals in the areas of construction management and business management, as well as recent government documents and industry guidelines, was undertaken to to conceptualise and operationalize formal and informal governance mechanisms. The study primarily draws on transaction-cost economics (e.g. Williamson 1979; Williamson 1991), relational contract theory (Feinman 2000; Macneil 2000) and social psychology theory (e.g. Gulati 1995). Content analysis of the literature was undertaken to identify key governance mechanisms. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. A previous study by the authors identified that formal governance mechanisms can be classified into seven measurable categories: (1) negotiated cost, (2) competitive cost, (3) commercial framework, (4) risk and reward sharing, (5) qualitative performance, (6) collaborative multi-party agreement, and (7) early contractor involvement. Similarly, informal governance mechanisms can be classified into four measureable categories: (1) leadership structure, (2) integrated team, (3) team workshops, and (4) joint management system. This paper explores and further defines the key operational characteristics of each mechanism category, highlighting its impact on value for money in alliance project delivery. The paper’s contribution is that it provides the basis for future research to compare the impact of a range of individual mechanisms within each category, as a means of improving the performance of construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The objective of this research was to develop a model to estimate future freeway pavement construction costs in Henan Province, China. A comprehensive set of factors contributing to the cost of freeway pavement construction were included in the model formulation. These factors comprehensively reflect the characteristics of region and topography and altitude variation, the cost of labour, material, and equipment, and time-related variables such as index numbers of labour prices, material prices and equipment prices. An Artificial Neural Network model using the Back-Propagation learning algorithm was developed to estimate the cost of freeway pavement construction. A total of 88 valid freeway cases were obtained from freeway construction projects let by the Henan Transportation Department during the period 1994−2007. Data from a random selection of 81 freeway cases were used to train the Neural Network model and the remaining data were used to test the performance of the Neural Network model. The tested model was used to predict freeway pavement construction costs in 2010 based on predictions of input values. In addition, this paper provides a suggested correction for the prediction of the value for the future freeway pavement construction costs. Since the change in future freeway pavement construction cost is affected by many factors, the predictions obtained by the proposed method, and therefore the model, will need to be tested once actual data are obtained.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Safety has long been a problem in the construction industry. Repair, maintenance, alteration and addition (RMAA) sector has emerged to play an important role in the construction industry. It accounted for 53% of the total construction market in Hong Kong in 2007. Safety performance of the RMAA words has been alarming. Statistics indicate that the percentage of fatal industrial accidents arising from RMAA work in Hong Kong was over 56% in 2006 while the remaining 44% was from new works. Effective safety measures to address the safety problems and improve safety performance of the RMAA sector are urgently needed. Unsafe behaviour has been attributed to one of the major causes of accidents. Traditional cost-benefit analysis of workers' safety behaviour seems to be inadequate. This paper proposes to adopt a game theoretical approach to analyse safety behaviour of RMAA workers. Game theory is concerned with the decision-making process in situations where outcomes depend upon choices made by one or more players. A game theoretical model between contractor and worker has been proffered. Mathematical analysis of this game model has been done and implications of the analysis have been discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

In this paper, we explore how BIM functionalities together with novel management concepts and methods have been utilized in thirteen hospital projects in the United States and the United Kingdom. Secondary data collection and analysis were used as the method. Initial findings indicate that the utilization of BIM enables a holistic view of project delivery and helps to integrate project parties into a collaborative process. The initiative to implement BIM must come from the top down to enable early involvement of all key stakeholders. It seems that it is rather resistance from people to adapt to the new way of working and thinking than immaturity of technology that hinders the utilization of BIM.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Megaprojects are described as large, complex and expensive construction projects. Recent studies have shown that megaprojects often result in cost overruns, time extensions and undesired outcomes. Regardless, megaprojects are common, particularly in developing countries, as they are a trigger for social and economic development (Li et al., 2010). Since 2007, the Government of Ecuador has begun an unprecedent investment in infrastructure. Through the National Water Secretary, the government has 16 projects in agenda accounting for over $ 3 billion, with 6 projects currently under construction. These projects are considered flagship infrastructure in the endeavour to enhance the country´s productivity.The Bulubulu-Naranjal-Cañar project, a $406 million multi-purpose hydraulic project for irrigation and flood control, consists of over 1,000 activities and was proposed to be completed by 2015. This novel project for Ecuador, presented as a case study, represents a challenge for project management and financing. The purpose of this preliminary study is to provide an insight to megaproject management in Ecuador, and propose improvements to megaproject management through optimization of stochastic project schedules.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Annually, several million tonnes of waste are produced from reworks, demolition, and use of substandard materials. Building Information Modelling (BIM), a digital representation of facilities and their constituent data, is a viable means of addressing some concerns about the impacts of these processes. BIM functionalities can be extended and combined with rich building information from specifications and product libraries, for efficient, streamlined design and construction. This paper conceptualises a framework for BIM-knowledge transfer from advanced economies for adaptation and use in urban development works in developing nations using the Sydney Down Under and Lagos Eko Atlantic projects as reference points. We present a scenario that highlights BIM-based lifecycle planning/specifications as agents of sustainable construction (in terms of cost and time) crucial to the quality of as-built data from early on in city development. We show how, through the use of BIM, city planners in developing nations can avoid high, retrospective (and sometimes wasteful) maintenance costs and leapfrog infrastructure management standards of advanced economies. Finally, this paper illustrates how BIM can address concerns about economic sustainability during city development in developing countries by enriching model objects with specification information sourced from a product library.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Construction scholars suggest that procurement processes can be used as mechanisms to change construction industry practices. This paper discusses industry changes as a response to the calls for integration of sustainability ideals into construction practices. Because major infrastructure construction has been identified as a key producer of greenhouse gas emissions (GHGE), this study explores collaborative procurement models that have been used to facilitate mitigation of GHGE. The study focuses on the application of non-price incentives and rewards that work together as a binary mechanism. Data were collected using mixed-methods: government document content analysis was complemented with data collected through focus groups and individual interviews with both clients and contractors. This report includes examples of greening procurement agendas for three Australian road authorities relating to collaborative procurement project delivery models. Three collaborative procurement models, Alliance Consortium, Early Contractor Involvement and Public Private Partnerships provide evidence of construction projects that were completed early. It can also be argued that both clients and contractors are rewarded through collaborative project delivery. The incentive of early completion is rewarded with reduction of GHGE. This positive environmental outcome, based on a dual benefit and non-price sustainability criteria, suggests a step towards changed industry practices though the use of green procurement models.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Background Value for money (VfM) on collaborative construction projects is dependent on the learning capabilities of the organisations and people involved. Within the context of infrastructure delivery, there is little research about the impact of organisational learning capability on project value. The literature contains a multiplicity of often un-testable definitions about organisational learning abilities. This paper defines learning capability as a dynamic capability that participant organisations purposely develop to add value to collaborative projects. The paper reports on a literature review that proposes a framework that conceptualises learning capability to explore the topic. This work is the first phase of a large-scale national survey funded by the Alliancing Association of Australasia and the Australian Research Council. Methodology Desk-top review of leading journals in the areas of strategic management, strategic alliances and construction management, as well as recent government documents and industry guidelines, was undertaken to synthesise, conceptualise and operationalise the concept of learning capability. The study primarily draws on the theoretical perspectives of the resource-based view of the firm (e.g. Barney 1991; Wernerfelt 1984), absorptive capacity (e.g. Cohen and Levinthal 1990; Zahra and George 2002); and dynamic capabilities (e.g. Helfat et al. 2007; Teece et al. 1997; Winter 2003). Content analysis of the literature was undertaken to identify key learning routines. Content analysis is a commonly used methodology in the social sciences area. It provides rich data through the systematic and objective review of literature (Krippendorff 2004). NVivo 9, a qualitative data analysis software package, was used to assist in this process. Findings and Future Research The review process resulted in a framework for the conceptualisation of learning capability that shows three phases of learning: (1) exploratory learning, (2) transformative learning and (3) exploitative learning. These phases combine both internal and external learning routines to influence project performance outcomes and thus VfM delivered under collaborative contracts. Sitting within these phases are eight categories of learning capability comprising knowledge articulation, identification, acquisition, dissemination, codification, internationalisation, transformation and application. The learning routines sitting within each category will be disaggregated in future research as the basis for measureable items in a large-scale survey study. The survey will examine the extent to which various learning routines influence project outcomes, as well as the relationships between them. This will involve identifying the routines that exist within organisations in the construction industry, their resourcing and rate of renewal, together with the extent of use and perceived value within the organisation. The target population is currently estimated to be around 1,000 professionals with experience in relational contracting in Australia. This future research will build on the learning capability framework to provide data that will assist construction organisations seeking to maximise VfM on construction projects.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

There is an increasing awareness of sustainability and climate change and its impact on infrastructure and engineering asset management in design, construction, and operations. Sustainability rating tools have been proposed and/or developed that provide ratings of infrastructure projects in differing phases of their life cycle on sustainability. This paper provides an overview of decision support systems using sustainability rating framework that can be used to prioritize or select tasks and activities within projects to enhance levels of sustainability outcomes. These systems can also be used to prioritize projects within an organization to optimize sustainability outcomes within an allocated budget.