342 resultados para Grant funded projects
Resumo:
Numerous different and sometimes discrepant interests can be affected, both positively and negatively, throughout the course of a major infrastructure and construction (MIC) project. Failing to address and meet the concerns and expectations of the stakeholders involved has resulted in many project failures. One way to address this issue is through a participatory approach to project decision making. Whether the participation mechanism is effective or not depends largely on the client/owner. This paper provides a means of systematically evaluating the effectiveness of the public participation exercise, or even the whole project, through the measurement of stakeholder satisfaction. Since the process of satisfaction measurement is complicated and uncertain, requiring approximate reasoning involving human intuition, a fuzzy approach is adopted. From this, a multi-factor hierarchical fuzzy comprehensive evaluation model is established to facilitate the evaluation of satisfaction in both single stakeholder group and overall MIC project stakeholders.
Resumo:
Process modelling – the design and use of graphical documentations of an organisation’s business processes – is a key method to document and use information about business processes in organisational projects. Still, despite current interest in process modelling, this area of study still faces essential challenges. One of the key unanswered questions concerns the impact of process modelling in organisational practice. Process modelling initiatives call for tangible results in the form of returns on the substantial investments that organisations undertake to achieve improved processes. This study explores the impact of process model use on end-users and its contribution to organisational success. We posit that the use of conceptual models creates impact in organisational process teams. We also report on a set of case studies in which we explore tentative evidence for the development of impact of process model use. The results of this work provide a better understanding of process modelling impact from information practices and also lead to insights into how organisations should conduct process modelling initiatives in order to achieve an optimum return on their investment.
Resumo:
Over the last few decades, construction project performance has been evaluated due to the increase of delays, cost overruns and quality failures. Growing numbers of disputes, inharmonious working environments, conflict, blame cultures, and mismatches of objectives among project teams have been found to be contributory factors to poor project performance. Performance measurement (PM) approaches have been developed to overcome these issues, however, the comprehensiveness of PM as an overall approach is still criticised in terms of the iron triangle; namely time, cost, and quality. PM has primarily focused on objective measures, however, continuous improvement requires the inclusion of subjective measures, particularly contractor satisfaction (Co-S). It is challenging to deal with the two different groups of large and small-medium contractor satisfaction as to date, Co-S has not been extensively defined, primarily in developing countries such as Malaysia. Therefore, a Co-S model is developed in this research which aims to fulfil the current needs in the construction industry by integrating performance measures to address large and small-medium contractor perceptions. The positivist paradigm used in the research was adhered to by reviewing relevant literature and evaluating expert discussions on the research topic. It yielded a basis for the contractor satisfaction model (CoSMo) development which consists of three elements: contractor satisfaction (Co-S) dimensions; contributory factors and characteristics (project and participant). Using valid questionnaire results from 136 contractors in Malaysia lead to the prediction of several key factors of contractor satisfaction and to an examination of the relationships between elements. The relationships were examined through a series of sequential statistical analyses, namely correlation, one-way analysis of variance (ANOVA), t-tests and multiple regression analysis (MRA). Forward and backward MRAs were used to develop Co-S mathematical models. Sixteen Co-S models were developed for both large and small-medium contractors. These determined that the large contractor Malaysian Co-S was most affected by the conciseness of project scope and quality of the project brief. Contrastingly, Co-S for small-medium contractors was strongly affected by the efficiency of risk control in a project. The results of the research provide empirical evidence in support of the notion that appropriate communication systems in projects negatively contributes to large Co-S with respect to cost and profitability. The uniqueness of several Co-S predictors was also identified through a series of analyses on small-medium contractors. These contractors appear to be less satisfied than large contractors when participants lack effectiveness in timely authoritative decision-making and communication between project team members. Interestingly, the empirical results show that effective project health and safety measures are influencing factors in satisfying both large and small-medium contractors. The perspectives of large and small-medium contractors in respect to the performance of the entire project development were derived from the Co-S models. These were statistically validated and refined before a new Co-S model was developed. Developing such a unique model has the potential to increase project value and benefit all project participants. It is important to improve participant collaboration as it leads to better project performance. This study may encourage key project participants; such as client, consultant, subcontractor and supplier; to increase their attention to contractor needs in the development of a project. Recommendations for future research include investigating other participants‟ perspectives on CoSMo and the impact of the implementation of CoSMo in a project, since this study is focused purely on the contractor perspective.
Resumo:
The work by graduate teachers in this volume represent intentional design of learning experiences using technology for Early Childhood settings. They were given a two-part design task: a sequence of lessons organised around a themed project; and the collection of resources to support such activities. The project had to be constructive in nature where the children built objects and representations that were meaningful to them. The excellent works presented here offer a range of approaches that would be suitable in a variety of contexts. Because they are reasoned, these projects offer flexibility in implementation along with confidence that they would be effective.
Resumo:
Quality and equity issues as they relate to assessment practices and policy are becoming increasingly important as Australia introduces a national curriculum and achievement standards. In a context of high-stakes accountability, concerns regarding equity and quality have important implications for teachers‘ practice for the improvement of learner outcomes. This article is based on three research projects that were conducted over the past four years and were funded by the Australian Federal Government. The research focus, emergent questions, the educational contexts, and the rationale for the studies are discussed prior to the presentation of the analysis of the research findings and the implications for teachers‘ practice and policy reform.
Resumo:
This paper is based on an Australian Learning & Teaching Council (ALTC) funded evaluation in 13 universities across Australia and New Zealand of the use of Engineers Without Borders (EWB) projects in first-year engineering courses. All of the partner institutions have implemented this innovation differently and comparison of these implementations affords us the opportunity to assemble "a body of carefully gathered data that provides evidence of which approaches work for which students in which learning environments". This study used a mixed-methods data collection approach and a realist analysis. Data was collected by program logic analysis with course co-ordinators, observation of classes, focus groups with students, exit survey of students and interviews with staff as well as scrutiny of relevant course and curriculum documents. Course designers and co-ordinators gave us a range of reasons for using the projects, most of which alluded to their presumed capacity to deliver experience in and learning of higher order thinking skills in areas such as sustainability, ethics, teamwork and communication. For some students, however, the nature of the projects decreased their interest in issues such as ethical development, sustainability and how to work in teams. We also found that the projects provoked different responses from students depending on the nature of the courses in which they were embedded (general introduction, design, communication, or problem-solving courses) and their mode of delivery (lecture, workshop or online).
Resumo:
Current literature has established that organisational culture influences knowledge management efforts; however, it is only recently that research on project management has focused its interest on organisational culture in the context of knowledge sharing and some preliminary studies have been conducted. In response, this paper adds a significant contribution by providing rich empirical evidence of the relationships between culture and the willingness to share knowledge, demonstrating which cultural values are more and which are less likely to improve inter-project knowledge sharing behaviours. The use of interviews and the Organisational Culture Assessment Instrument (OCAI) (Cameron & Quinn, 2005) in the cross-case examination of culture in four participating cases has resulted in rich empirical contributions. Furthermore, this paper adds to the project management literature by introducing the Competing Values Framework (CVF) of Cameron and Quinn (2005) to evaluate knowledge sharing in the inter-project context.
Resumo:
Waste management and minimisation is considered to be an important issue for achieving sustainability in the construction industry. Retrofit projects generate less waste than demolitions and new builds, but they possess unique features and require waste management approaches that are different to traditional new builds. With the increasing demand for more energy efficient and environmentally sustainable office spaces, the office building retrofit market is growing in capital cities around Australia with a high level of refurbishment needed for existing aging properties. Restricted site space and uncertain delivery process in these projects make it a major challenge to manage waste effectively. The labour-intensive nature of retrofit projects creates the need for the involvement of small and medium enterprises (SMEs) as subcontractors in on-site works. SMEs are familiar with on-site waste generation but are not as actively motivated and engaged in waste management activities as the stakeholders in other construction projects in the industry. SMEs’ responsibilities for waste management in office building retrofit projects need to be identified and adapted to the work delivery processes and the waste management system supported by project stakeholders. The existing literature provides an understanding of how to manage construction waste that is already generated and how to increase the waste recovery rate for office building retrofit projects. However, previous research has not developed theories or practical solutions that can guide project stakeholders to understand the specific waste generation process and effectively plan for and manage waste in ongoing project works. No appropriate method has been established for the potential role and capability of SMEs to manage and minimise waste from their subcontracting works. This research probes into the characteristics of office building retrofit project delivery with the aim to develop specific tools to manage waste and incorporate SMEs in this process in an appropriate and effective way. Based on an extensive literature review, the research firstly developed a questionnaire survey to identify the critical factors of on-site waste generation in office building retrofit projects. Semi-structured interviews were then utilised to validate the critical waste factors and establish the interrelationships between the factors. The interviews served another important function of identifying the current problems of waste management in the industry and the performance of SMEs in this area. Interviewees’ opinions on remedies to the problems were also collected. On the foundation of the findings from the questionnaire survey and semi-structured interviews, two waste planning and management strategies were identified for the dismantling phase and fit-out phase of office building retrofit projects, respectively. Two models were then established to organize SMEs’ waste management activities, including a work process-based integrated waste planning model for the dismantling phase and a system dynamics model for the fit-out phase. In order to apply the models in real practice, procedures were developed to guide SMEs’ work flow in on-site waste planning and management. In addition, a collaboration framework was established for SMEs and other project stakeholders for effective waste planning and management. Furthermore, an organisational engagement strategy was developed to improve SME waste management practices. Three case studies were conducted to validate and finalise the research deliverables. This research extends the current literature that mostly covers waste management plans in new build projects, by presenting the knowledge and understanding of addressing waste problems in retrofit projects. It provides practical tools and guidance for industry practitioners to effectively manage the waste generation processes in office building retrofit projects. It can also promote industry-level recognition of the role of SMEs and their performance in on-site waste management.
Resumo:
Value Management (VM) is a proven methodology that provides a structured framework using supporting tools and techniques that facilitate effective decision-making in many types of projects, thus achieving ‘best value’ for clients. It offers an exceptionally robust approach to exploring the need and function of projects to be aligned with client’s objectives. The functional analysis and creativity phases of VM are crucial as it focused on utilising innovative thinking to understand the objectives of clients’ projects and provide value-adding solutions at the early discovery stages of projects. There is however a perception of VM as just being another cost-cutting tool, which has overshadowed the fundamental benefits of the method, therefore negating both influence and wider use in the construction industry. This paper describes findings from a series of case studies conducted at project and corporate levels of a current public funded infrastructure projects in Malaysia. The study aims to investigate VM processes practised by the project client organisation and evaluate the effects of project team involvement in VM workshops during the design-stage of these projects. The focus of the study is on how issues related to ‘upstream’ infrastructure design aimed at improving ‘downstream’ construction process on-site, are being resolved through multi-disciplinary team consideration and decision-making. Findings from the case studies indicate that the mix of disciplines of project team members at a design-stage of a VM workshop has minimal influence on improving construction processes. However, the degree of interaction, institutionalized thinking, cultural dimensions and visualization aids adopted, have a significant impact in maximizing creativity amongst project team members during VM workshop. The case studies conducted for this research have focused on infrastructure projects that utilise traditional VM workshop as client’s chosen VM methodology to review and develop designs. Documents review and semi-structured interview with project teams are used as data collection techniques for the case study. The significant outcomes of this research are expected to offer alternative perspectives for construction professionals and clients to minimise the constraints and strengthen strategies for implementing VM on future projects.
Resumo:
This paper reports on a four year Australian Research Council funded Linkage Project titled Skilling Indigenous Queensland, conducted in regional areas of Queensland, Australia from 2009 to 2013. The project sought to investigate vocational education, training (VET) and teaching, Indigenous learners’ needs, employer cultural and expectations and community culture and expectations to identify best practice in numeracy teaching for Indigenous VET learners. Specifically it focused on ways to enhance the teaching and learning of courses and the associated mathematics in such courses to benefit learners and increase their future opportunities of employment. To date thirty-nine teachers/trainers/teacher aides and two hundred and thirty-one students consented to participate in the project. Nine VET courses were nominated to be the focus on the study. This paper focuses on questionnaire and interview responses from four trainers, two teacher aides and six students. In recent years a considerable amount of funding has been allocated to increasing Indigenous Peoples’ participation in education and employment. This increased funding is predicated on the assumption that it will make a difference and contribute to closing the education gap between Indigenous and non-Indigenous Australians (Council of Australia Governments, 2009). The central tenet is that access to education for Indigenous People will create substantial social and economic benefits for regional and remote Indigenous People. The project’s aim is to address some of the issues associated with the gap. To achieve the aims, the project adopted a mixed methods design aimed at benefitting research participants and included: participatory collaborative action research (Kemmis & McTaggart, 1988) and, community research (Smith, 1999). Participatory collaborative action research refers to a is a “collective, self-reflective enquiry undertaken by participants in social situations in order to improve the rationality and justice of their own social and educational practices” (Kemmis et al., 1988, p. 5). Community research is described as an approach that “conveys a much more intimate, human and self-defined space” (p. 127). Community research relies on and validates the community’s own definitions. As the project is informed by the social at a community level, it is described as “community action research or emancipatory research” (Smith, 1999, p. 127). It seeks to demonstrate benefit to the community, making positive differences in the lives of Indigenous People and communities. The data collection techniques included survey questionnaires, video recording of teaching and learning processes, teacher reflective video analysis of teaching, observations, semi-structured interviews and student numeracy testing. As a result of these processes, the findings indicate that VET course teachers work hard to adopt contextualising strategies to their teaching, however this process is not always straight forward because of the perceptions of how mathematics has been taught and learned historically. Further teachers, trainers and students have high expectations of one another with the view to successful outcomes from the courses.
Resumo:
In 2011 Queensland suffered both floods and cyclones, leaving residents without homes and their communities in ruins (2011). This paper presents how researchers from QUT, who are also members of the Oral History Association of Australia (OHAA) Queensland’s chapter, are using oral history, photographs, videography and digital storytelling to help heal and empower rural communities around the state and how evaluation has become a key element of our research. QUT researchers ran storytelling workshops in the capital city of Brisbane i early 2011, after the city suffered sever flooding. Cyclone Yasi then struck the town of Cardwell (in February 2011) destroying their historical museum and recording equipment. We delivered an 'emergency workshop', offering participants hands on use of the equipment, ethical and interviewing theory, so that the community could start to build a new collection. We included oral history workshops as well as sessions on how best to use a video camera, digital camera and creative writing sessions, so the community would also know how to make 'products' or exhibition pieces out of the interviews they were recording. We returned six months later to conduct follow-up workshops and the material produced by and with the community had been amazing. More funding has now been secured to replicate audio/visual/writing workshops in other remote rural Queensland communities including Townsville, Mackay and Cunnamulla and Toowoomba in 2012, highlighting the need for a multi media approach, to leverage the most out of OH interviews as a mechanism to restore and promote community resilience and pride.
Resumo:
On 3 February 2011, Cyclone Yasi struck the coast of North Queensland, causing widespread damage. The cyclone destroyed the small coastal town of Cardwell, about 165 kilometres north of Townsville, Queensland. This chapter serves as a case study of a collaborative outreach project mobilised in response to this disaster in North Queensland. A public history research team, consisting of practitioners from the Queensland University of Technology’s Creative Industries Faculty, with the support of the Oral History Association of Australia, Queensland branch, partnered with the Cardwell and District Historical Society to support the society to collect community narratives in the wake of Cyclone Yasi.
Resumo:
Cyclone Yasi struck the Cassowary Coast of Queensland in the early hours of Feb 3, 2011, destroying many homes sand property, including the destruction of the Cardwell and district historical society’s premises. With their own homes flattened, many were forced to live in mobile accommodation, with extended family, or leave altogether. The historical society members however were more devastated by their flattened foreshore museum and loss of their collection material. A call for assistance was made through the OHAA Qld branch, who along with QUT sponsored a trip to somehow plan how they could start to pick up the pieces to start again. This presentation highlights the need for communities to gather, preserve and present their own stories, in a way that is sustainable and meaningful to them, but that good advice and support along the way is important. Two 2 day workshops were held in March and then September, augmented by plenty of email correspondence and phone calls in between. Participants learnt that if they could conduct quality oral history interviews, they could later use these in many exhibitable ways including: documentary pieces; digital stories; photographic collections; creative short stories; audio segments –while also drawing closely together a suffering community. This story is not only about the people who were interviewed about the night Yasi struck, but the amazing women (all over 50) of the historical society who were willing to try and leap the digital divide that faces older Australians, especially those in rural Australia, so that their older local stories would not be lost and so that new stories could also be remembered.
Resumo:
Civil infrastructure plays a key role in supporting and improving current way of life. However, the assets can have a large impact on the region around them, which are both positive (usually for the purpose they are built) and negative (consequences and unintended effects). There is an increasing trend for society to place an importance on the role of sustainability to ensure that there is a world suitable for future generations. In order to ensure that the world for future generations is in the best possible condition it is increasingly important to look at integrating sustainability outcomes into the way industry operates, including the infrastructure industry. It is therefore important to undertake sustainability assessment of civil infrastructure projects. By having organisations take on sustainability assessments of civil infrastructure assets both during construction and in operation, the industry can assist to drive outcomes and results that will benefit society and future generations and make their own operations more efficient.
Resumo:
There is a worldwide demand for an increasingly sustainable built environment. This has resulted in the need for a more accurate evaluation of the level of sustainability of construction projects. To do this it involves the development of better measurement and benchmarking methods. One approach is to use a theoretical model to assess construction projects in terms of their sustainable development value (SDV) and sustainable development ability (SDA) for implementation in the project life cycle, where SDA measures the contribution of a project to development sustainability and as a major criterion for assessing its feasibility. This paper develops an improved SDA prototype model that incorporates the effects of dynamical factors on project sustainability. This involves the introduction of two major factors concerning technological advancement and changes in people's perceptions. A case study is used to demonstrate the procedures involved in simulation and modeling, one outcome of which is to demonstrate the greater influence of technological advancement on project sustainability than changes in perception.