163 resultados para Project 2004-028-C : Wayfinding in the Built Environment
Project diagnostics : assessing the condition of projects and identifying poor health combing forces
Resumo:
In many cases, construction projects do not achieve the objectives that the project participants set for them. If participants could better understand how their project is performing overall, at various stages of its delivery, then the opportunities to achieve project success would almost certainly be greater. This paper documents a method of assessing the status of a project, at a point in its design or construction phase, or after completion. The status is assessed in terms of up to seven (7) key success factors. Any evidence of less than adequate performance in these performance areas is scrutinised to seek out the root causes of why this situation is happening. Using these identified root causes of under performance, general suggestions can then be made as to how to return the project to good health. A software package that assists in assessing the status of the project has been developed. The package is currently being calibrated before commercial release.
Resumo:
The Queensland Department of Public Works (DPW) holds a significant interest in the Brisbane Central Business District (CBD) in controlling approximately 20 percent of the office space within its confines. This comprises a total of 333,903 square metres of space, of which 170,111 square metres is owned and 163,792 square metres is leased from the private sector. The department’s nominal ownership extends to several enduring, landmark buildings as well as several modern office towers. The portfolio includes the oldest building in the CBD, being the former Commissariat Stores building and one of the newest, a 15,000 square metre office tower under construction at 33 Charlotte Street.
Resumo:
Statistics indicate that the percentage of fatal industrial accidents arising from repair, maintenance, minor alteration and addition (RMAA) works in Hong Kong was disturbingly high and was over 56% in 2006. This paper provides an initial report of a research project funded by the Research Grants Council (RGC) of the HKSAR to address this safety issue. The aim of this study is to scrutinize the causal relationship between safety climate and safety performance in the RMAA sector. It aims to evaluate the safety climate in the RMAA sector; examine its impacts on safety performance, and recommend measures to improve safety performance in the RMAA sector. This paper firstly reports on the statistics of construction accidents arising from RMAA works. Qualitative and quantitative research methods applied in conducting the research are dis-cussed. The study will critically review these related problems and provide recommendations for improving safety performance in the RMAA sector.
Resumo:
In recent years culture has become one of the most studied topics in project management research. Some studies have investigated the influence of culture at different levels – such as national culture, industry culture, organisational culture and professional culture. As a project-based industry, the construction industry needs to have more insight concerning cultural issues at the project level and their influence on the performance of construction projects. Few studies, however, have focused on culture at the project level. This paper uses a questionnaire survey to determine the perceptions of Chinese contractors about the impact of project culture on the performance of local construction projects. This is augmented by a series of in-depth interviews with senior executive managers in the industry. The findings indicate that specific project culture does contribute significantly towards project outcomes. In particular, goal orientation and flexibility, as two dimensions of project culture, have a negative statistical correlation with perceived satisfaction of the process, commercial success, future business opportunities, lessons learnt from the project, satisfaction with the relationships, and overall performance. This paper also indicates that the affordability of developing an appropriate project culture is a major concern for industry practitioners.
Resumo:
The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
The significant challenge faced by government in demonstrating value for money in the delivery of major infrastructure resolves around estimating costs and benefits of alternative modes of procurement. Faced with this challenge, one approach is to focus on a dominant performance outcome visible on the opening day of the asset, as the means to select the procurement approach. In this case, value for money becomes a largely nominal concept and determined by selected procurement mode delivering, or not delivering, the selected performance outcome, and notwithstanding possible under delivery on other desirable performance outcomes, as well as possibly incurring excessive transaction costs. This paper proposes a mind-set change in this particular practice, to an approach in which the analysis commences with the conditions pertaining to the project and proceeds to deploy transaction cost and production cost theory to indicate a procurement approach that can claim superior value for money relative to other competing procurement modes. This approach to delivering value for money in relative terms is developed in a first-order procurement decision making model outlined in this paper. The model developed could be complementary to the Public Sector Comparator (PSC) in terms of cross validation and the model more readily lends itself to public dissemination. As a possible alternative to the PSC, the model could save time and money in preparation of project details to lesser extent than that required in the reference project and may send a stronger signal to the market that may encourage more innovation and competition.
Resumo:
The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its efficacy on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.
Resumo:
Much of the effort of the construction industry is directed towards the provision of services and products, many with substantial long term implications. Systems and procedures have evolved over centuries to provide these services and products, but inefficiencies have developed. One strategy for improving the efficiency of the construction industry is to restructure the systems and procedures which deliver projects so that improved benefits to the end users are provided. In this paper, contemporary systems and procedures for the delivery of projects are reviewed and the roles of the major stakeholders are examined. The recent construction of Woodford Correctional Centre in Queensland is reviewed as a case study in restructuring the delivery process and the lessons learned from this successful project are summarised.
Resumo:
This paper discusses a current research project building new understandings and knowledge relevant to R&D funding strategies in Australia. Building on a retrospective analysis of R&D trends and industry outcomes, an industry roadmap will be developed to inform R&D policies more attuned to future industry needs to improve research investment effectiveness. The project will also include analysis of research team formation and management (involving end users from public and private sectors together with research and knowledge institutions), and dissemination of outcomes and uptake in the Australian building and construction industry. The project will build on previous research extending open innovation system theory and network analysis and procurement, focused on R&D. Through the application of dynamic capabilities and strategic foresighting theory, an industry roadmap for future research investment will be developed, providing a stronger foundation for more targeted policy recommendations. This research will contribute to more effective construction processes in the future through more targeted research funding and more effective research partnerships between industry and researchers.
Resumo:
Sustainability has been a major factor and determinant of commercial property design, construction, retro-fitting and landlord and tenant requirements over the last decade, supported by the introduction of rating tools such as NABERS and GreenStar and the recently mandated Building Energy Efficiency Certificate (BEEC). However, the movement to sustainable and energy efficient housing has not been established for the same period, and although mandatory building regulations have been in place for new residential housing construction since 2004, the requirement to improve the sustainability and energy efficiency of housing constructed prior to 2004 has not been mandatory. Residential dwelling energy efficiency and rating schemes introduced in Australia over the past decade have included rating schemes such as BASIX, NatHERS, First rate, ACTHERS, and Building Code of Australia and these have applied to new dwelling construction. At both National and State level the use of energy efficiency schemes for existing residential dwellings has been voluntary and despite significant cash incentives have not always been successful or achieved widespread take-up. In 2010, the Queensland Government regulated that all homes offered for sale, whether a new or existing dwellings require the seller to provide a ―sustainability declaration‖ that provides details of the sustainability measures associated with the dwelling being sold. The purpose of this declaration being to inform buyers and increase community awareness of home sustainability features. This paper uses an extensive review of real estate marketing material, together with a comprehensive survey of real estate agents to analyse the current market compliance, awareness and acceptance of existing green housing regulations and the importance that residential property owners and purchasers place on energy efficient and sustainable housing. The findings indicate that there is still little community awareness or concern of sustainable housing features when making home purchase decisions.