540 resultados para Infrastructure Projects
Resumo:
The US National Institute of Standards and Technology (NIST) showed that, in 2004, owners and operations managers bore two thirds of the total industry cost burden from inadequate interoperability in construction projects from inception to operation, amounting to USD10.6 billion. Building Information Modelling (BIM) and similar tools were identified by Engineers Australia in 2005 as potential instruments to significantly reduce this sum, which in Australia could amount to total industry-wide cost burden of AUD12 billion. Public sector road authorities in Australia have a key responsibility in driving initiatives to reduce greenhouse gas emissions from the construction and operations of transport infrastructure. However, as previous research has shown the Environmental Impact Assessment process, typically used for project approvals and permitting based on project designs available at the consent stage, lacks Key Performance Indicators (KPIs) that include long-term impact factors and transfer of information throughout the project life cycle. In the building construction industry, BIM is widely used to model sustainability KPIs such as energy consumption, and integrated with facility management systems. This paper proposes that a similar use of BIM in early design phases of transport infrastructure could provide: (i) productivity gains through improved interoperability and documentation; (ii) the opportunity to carry out detailed cost-benefit analyses leading to significant operational cost savings; (iii) coordinated planning of street and highway lighting with other energy and environmental considerations; iv) measurable KPIs that include long-term impact factors which are transferable throughout the project life cycle; and (v) the opportunity for integrating design documentation with sustainability whole-of-life targets.
Resumo:
ABSTRACT A rapidly changing business environment and legacy IT problems has resulted in many organisations implementing standard package solutions. This 'common systems' approach establishes a common IT and business process infrastructure within organisations and its increasing dominance raises several important strategic issues. These are to what extent do common systems impose common business processes and management systems on competing firms, and what is the source of competitive advantage if the majority of firms employ almost identical information systems and business processes? A theoretical framework based on research into legacy systems and earlier IT strategy literature is used to analyse three case studies in the manufacturing, chemical and IT industries. It is shown that the organisations are treating common systems as the core of their organisations' abilities to manage business transactions. To achieve competitive advantage they are clothing these common systems with information systems designed to capture information about competitors, customers and suppliers, and to provide a basis for sharing knowledge within the organisation and ultimately with economic partners. The importance of these approaches to other organisations and industries is analysed and an attempt is made at outlining the strategic options open to firms beyond the implementation of common business systems.
Resumo:
Many infrastructure agencies adopt sustainability objectives at a corporate level and incorporate sustainability targets and indicators as part of corporate reporting processes. These objectives are expected to translate to all stages of the project delivery process, including project selection. For infrastructure capital works projects and programs, a robust project management approach involves the development of a business case to guide investment decision making. A key tool in the assessment of project options and selection of a delivery strategy is Cost Benefit Analysis (CBA). Infrastructure providers are required to undertake cost benefit analysis to support project selection through regulatory approval and budgetary processes. This tool has emerged through the prism of economic analysis rather than sustainability. A literature review reveals the limitations of CBA alone to effectively evaluate economic, environmental and social externalities or impacts that apply over a long time frame, and that are ultimately irreversible. Multi-Criteria Analysis (MCA) has been introduced as a means to incorporate a wider array of factors into decision making such as sustainability. This, however, presents new challenges with issues around how to transparently represent wider community values in the selection of a preferred solution. Are these tools effective in assessing the wider sustainability costs and benefits taking into account that these are public works with long life spans and significant impacts across institutional boundaries? The research indicates a need to develop clear guidelines for investment decision making in order to better align with corporate sustainability objectives. Findings from the literature review indicate that a more sustainable approach to investment decision-making framework should include: the incorporation of sustainability goals from corporate planning documents; problem definition and option generation using best practice investment management guidelines; improved guidelines for Business Case development using a combination of both Cost Benefit Analysis and Multi-Criteria Analysis; and an integrated public participation process.
Resumo:
For design-build (DB) projects, owners normally use lump sum and Guaranteed Maximum Price (GMP) as the major contract payment provisions. However, there was a lack of empirical studies to compare the project performance within different contract types and investigate how different project characteristics affect the owners’ selection of contract arrangement. Project information from Design-build Institute of America (DBIA) database was collected to reveal the statistical relationship between different project characteristics and contract types and to compare project performance between lump sum and GMP contract. The results show that lump sum is still the most frequently used contract method for DB projects, especially in the public sector. However, projects using GMP contract are more likely to have less schedule delay and cost overrun as compared to those with lump sum contract. The chi-square tests of cross tabulations reveal that project type, owner type, and procurement method affect the selection of contract types significantly. Civil infrastructure rather than industrial engineering project tends to use lump sum more frequently; and qualification-oriented contractor selection process resorts to GMP more often compared with cost-oriented process. The findings of this research contribute to the current body of knowledge concerning the effect of associated project characteristics on contract type selection. Overall, the results of this study provide empirical evidence from real DB projects that can be used by owners to select appropriate contract types and eventually improve future project performance.
Resumo:
This workshop comprised a diverse group of African construction experts, ranging far wider than RSA. Each of the attendees had attended the annual ASOCSA conference and was additionally provided with a short workshop pre-brief. The aim was to develop a view of their 15-20 year vision of construction improvement in RSA and the steps necessary to get there. These included sociological, structural, technical and process changes. Whilst some suggestions are significantly challenging, none are impossible, given sufficient collaboration between government, industry, academia and NGOs. The highest priority projects (more properly, programmes) were identified and further explored. These are: 1. Information Hub (‘Open Africa’). Aim – to utilise emerging trends in Open Data to provide a force for African unity. 2. Workforce Development. Aim – to rebuild a competent, skilled construction industry for RSA projects and for export. 3. Modular DIY Building. Aim – to accelerate the development of sustainable, cost-efficient and desirable housing for African economic immigrants and others living in makeshift and slum dwellings. Open Data is a maturing theme in different cities and governments around the world and the workshop attendees were very keen to seize such a possibility to assist in developing an environment where Africans can share information and foster collaboration. It is likely that NGOs might be keen to follow up such an initiative. There are significant developments taking place around the world in the construction sector currently, with comparatively large savings being made for taxpayers (20% plus in the UK). Not all of these changes would be easy to transplant to RSA (even more so to much of the rest of Africa). Workforce development was a keen plea amongst the attendees, who seemed concerned that expertise has leaked away and is not being replaced with sufficient intensity. It is possible today to develop modular buildings in such a way that even unskilled residents can assist in their construction, and even their appropriate design. These buildings can be sited nearly autonomously from infrastructures, thus relieving the tensions on cities and townships, whilst providing humane accommodation for the economically disadvantaged. Development of suitable solutions could either be conducted with other similarly stressed countries or developed in-country and the expertise exported. Finally, it should be pointed out that this was very much a first step. Any opportunity to collaborate from an Australian, QUT or CIB perspective would be welcomed, whilst acknowledging that the leading roles belong to RSA, CSIR, NRF, ASOCSA and the University of KwaZulu-Natal.
Resumo:
Since 2003, Mainland China has been promoting the public–private partnership (PPP) procurement model in the waste-to-energy incineration sector to reduce the waste burying rate and improve environmental quality. Five critical risk factors (CRFs) that affect the construction and operation of waste-to-energy incineration projects have been identified from real-life risk events of 14 PPP waste-to-energy incineration plants through content analysis. These risk factors are insufficient waste supply, disposal of non-licensed waste, environmental risk, payment risk, and lack of supporting infrastructure. A recently completed PPP waste-to-energy incineration plant, the Shanghai Tianma project, was investigated to learn from the effective management of CRFs. First-hand data about the Shanghai Tianma project was collected, with a focus on project negotiation and concession agreement. Lessons learned about risk management were acquired. This paper presents a detailed study of the contractual structure, risk sharing scheme, risk response measures to CRFs, and project transfer of a PPP project. The study results will provide governments with management implications to prepare equitable concession agreements and benefit private investors by effectively mitigating and managing risks in future PPP waste-to-energy incineration projects.
Resumo:
Public private partnerships (PPPs) have been adopted widely to provide public facilities and services. According to the PPP agreement, PPP projects would be transferred to the public sector. However, problems related to the subsequent management of ongoing PPP projects have not been studied thoroughly. Residual value risk (RVR) can occur if the public sector cannot obtain the project in the desired conditions as required in the agreement when a project is being transferred. RVR has been identified as an important risk in PPPs and has greatly influenced the outputs of the projects. In order to further observe the change of residual value (RV) during the process of PPP projects and to reveal the internal mechanism for reducing the RVR, a comparative case study of two PPP projects in mainland China and Hong Kong was conducted. Based on the case study, different factors leading to RVR and a series of key risk indicators (KRIs) were identified. The comparison demonstrates that RVR is an important risk that could influence the success of PPP projects. The cumulative effects during the concession period can play significant roles in the occurrence of RVR. Additionally, the cumulative effects in different cases can make the RVR different because of different stakeholders’ efforts on the projects and ways to treat RVR. Finally, alternatives for the public sector to treat RVR were proposed. The findings of this research can reduce RVR and improve the performance of PPP projects.
Resumo:
Even though today’s corporations recognize that they need to understand modern project management techniques (Schwalbe, 2002, p2), many researchers continue to provide evidence of poor IT project success. With Kotnour, (2000) finding that project performance is positively associated with project knowledge, a better understanding of how to effectively manage knowledge in IT projects should have considerable practical significance for increasing the chances of project success. Using a combined qualitative/quantitative method of data collection in multiple case studies spanning four continents, and comprising a variety of organizational types, the focus of this current research centered on the question of why individuals working within IT project teams might be motivated towards, or inhibited from, sharing their knowledge and experience in their activities, procedures, and processes. The research concluded with the development of a new theoretical model of knowledge sharing behavior, ‘The Alignment Model of Motivational Focus’. This model suggests that an individual’s propensity to share knowledge and experience is a function of perceived personal benefits and costs associated with the activity, balanced against the individual’s alignment to a group of ‘institutional’ factors. These factors are identified as alignments to the project team, to the organization, and dependent on the circumstances, to either the professional discipline or community of practice, to which the individual belongs.