176 resultados para Development Projects
Resumo:
Floods are among the most devastating events that affect primarily tropical, archipelagic countries such as the Philippines. With the current predictions of climate change set to include rising sea levels, intensification of typhoon strength and a general increase in the mean annual precipitation throughout the Philippines, it has become paramount to prepare for the future so that the increased risk of floods on the country does not translate into more economic and human loss. Field work and data gathering was done within the framework of an internship at the former German Technical Cooperation (GTZ) in cooperation with the Local Government Unit of Ormoc City, Leyte, The Philippines, in order to develop a dynamic computer based flood model for the basin of the Pagsangaan River. To this end, different geo-spatial analysis tools such as PCRaster and ArcGIS, hydrological analysis packages and basic engineering techniques were assessed and implemented. The aim was to develop a dynamic flood model and use the development process to determine the required data, availability and impact on the results as case study for flood early warning systems in the Philippines. The hope is that such projects can help to reduce flood risk by including the results of worst case scenario analyses and current climate change predictions into city planning for municipal development, monitoring strategies and early warning systems. The project was developed using a 1D-2D coupled model in SOBEK (Deltares Hydrological modelling software package) and was also used as a case study to analyze and understand the influence of different factors such as land use, schematization, time step size and tidal variation on the flood characteristics. Several sources of relevant satellite data were compared, such as Digital Elevation Models (DEMs) from ASTER and SRTM data, as well as satellite rainfall data from the GIOVANNI server (NASA) and field gauge data. Different methods were used in the attempt to partially calibrate and validate the model to finally simulate and study two Climate Change scenarios based on scenario A1B predictions. It was observed that large areas currently considered not prone to floods will become low flood risk (0.1-1 m water depth). Furthermore, larger sections of the floodplains upstream of the Lilo- an’s Bridge will become moderate flood risk areas (1 - 2 m water depth). The flood hazard maps created for the development of the present project will be presented to the LGU and the model will be used to create a larger set of possible flood prone areas related to rainfall intensity by GTZ’s Local Disaster Risk Management Department and to study possible improvements to the current early warning system and monitoring of the basin section belonging to Ormoc City; recommendations about further enhancement of the geo-hydro-meteorological data to improve the model’s accuracy mainly on areas of interest will also be presented at the LGU.
Resumo:
The Control Theory has provided a useful theoretical foundation for Information Systems development outsourcing (ISD-outsourcing) to examine the co-ordination between the client and the vendor. Recent research identified two control mechanisms: structural (structure of the control mode) and process (the process through which the control mode is enacted). Yet, the Control Theory research to-date does not describe the ways in which the two control mechanisms can be combined to ensure project success. Grounded in case study data of eight ISD-outsourcing projects, we derive three ‘control configurations’; i) aligned, ii) negotiated, and 3) self-managed, which describe the combinative patterns of structural and process control mechanisms within and across control modes.
Resumo:
Collaborative contracting has emerged over the past 15 years as an innovative project delivery framework that is particularly suited to infrastructure projects. Australia leads the world in the development of project and program alliance approaches to collaborative delivery. These approaches are considered to promise superior project results. However, very little is known about the learning routines that are most widely used in support of collaborative projects in general and alliance projects in particular. The literature on absorptive capacity and dynamic capabilities indicates that such learning enhances project performance. The learning routines employed at corporate level during the operation of collaborative infrastructure projects in Australia were examined through a large survey conducted in 2013. This paper presents a descriptive summary of the preliminary findings. The survey captured the experiences of 320 practitioners of collaborative construction projects, including public and private sector clients, contractors, consultants and suppliers (three per cent of projects were located in New Zealand, but for brevity’s sake the sample is referred to as Australian). The majority of projects identified used alliances (78.6%); whilst 9% used Early Contractor Involvement (ECI) contracts and 2.7% used Early Tender Involvement contracts, which are ‘slimmer’ types of collaborative contract. The remaining 9.7% of respondents used traditional contracts that employed some collaborative elements. The majority of projects were delivered for public sector clients (86.3%), and/or clients experienced with asset procurement (89.6%). All of the projects delivered infrastructure assets; one third in the road sector, one third in the water sector, one fifth in the rail sector, and the rest spread across energy, building and mining. Learning routines were explored within three interconnected phases: knowledge exploration, transformation and exploitation. The results show that explorative and exploitative learning routines were applied to a similar extent. Transformative routines were applied to a relatively low extent. It was also found that the most highly applied routine is ‘regularly applying new knowledge to collaborative projects’; and the least popular routine was ‘staff incentives to encourage information sharing about collaborative projects’. Future research planned by the authors will examine the impact of these routines on project performance.
Resumo:
This document calls on governments, civil society and in particular educators to prioritize processes that develop and strengthen education for sustainable development (ESD). The world has changed since the UN World Summit on Sustainable Development in 2002. While there have been significant initiatives and progress has been made, the scale of effort is still overshadowed by the scope of the problem. For instance, human-induced climate change is creating a long-lasting ecological crisis with severe economic and social consequences. Recently the global economic crisis has drawn attention to the problem of borrowing from resources that do not exist. Poverty, conflict and social injustice remain critical issues on the global agenda. A renewed sense of commitment to the UN Decade of Education for Sustainable Development 2005-2014 is required. Formal, informal and non-formal education and learning processes for sustainability must be strengthened and prioritized. This document supports and builds on the concepts and values that are put forward within UNESCO’s International Implementation Scheme for Education for Sustainable Development and in the Earth Charter. The purpose of ESD is to reorient education in order to contribute to a sustainable future for the common good of present and future generations. ESD recognizes the interdependence of environmental, social and economic perspectives and the dependence of humanity on a healthy biosphere. Participation and involvement are necessary components of ESD, with an emphasis on empowerment and agency for active citizenship, human rights and societal change. Re-orientation is necessary at all levels and in all phases of education, and encompasses community learning, thus making ESD a wider process challenging the form and purpose of education itself.
Resumo:
The number of office building retrofit projects is increasing. These projects are characterised by processes which have a close relationship with waste generation and therefore demand a high level of waste management. In a preliminary study reported separately, we identified seven critical factors of on-site waste generation in office building retrofit projects. Through semi-structured interviews and Interpretive Structural Modelling, this research further investigated the interrelationships among these critical waste factors, to identify each factor’s level of influence on waste generation and propose effective solutions for waste minimization. “Organizational commitment” was identified as the fundamental issue for waste generation in the ISM system. Factors related to plan, design and construction processes were found to be located in the middle levels of the ISM model but still had significant impacts on the system as a whole. Based on the interview findings and ISM analysis results, some practical solutions were proposed for waste minimization in building retrofit projects: (1) reusable and adaptable fit-out design; (2) a system for as-built drawings and building information; (3) integrated planning for retrofitting work process and waste management; and (4) waste benchmarking development for retrofit projects. This research will provide a better understanding of waste issues associated with building retrofit projects and facilitate enhanced waste minimization.
Resumo:
One of the potentially far reaching recommendations of the Senate Inquiry of 2001 was to fund professional development for teachers of gifted children under the Australian Government Quality Teacher Program (AGQTP). This funding was made available to all sectors of schooling and led to a number of initiatives to address the shortcomings in gifted education identified in the Senate Report. This paper reports on the initiatives undertaken by one sector over an eight-year period. The initiative began with a commitment from the sector to provide professional development in gifted education and later required that sector to address gifted education in their school renewal planning. A professional development program was planned and implemented in stages drawing on the AGQTP modules. However, teachers were encouraged to pursue an active role in instigating their own professional development priorities and needs. Thus, teachers within an action research framework collaboratively designed, implemented and reflected on projects which progressively expanded over a three year period. Initial projects focussed on their own teaching or context. In the second year of the three-year-cycle projects expanded to include colleagues. Finally, in the third year teachers assumed a leadership role in their schools or district and mentored other teachers beginning the program. The paper presents both qualitative and quantitative data on the experiences of the participating teachers and the long term impact on the capacity of the jurisdiction to provide enhanced opportunities for gifted children.
Resumo:
Capability development is at the heart of creating competitive advantage. This thesis intends to conceptualise Strategic Capability Development as a renewal of an organisation's existing capability in line with the requirements of the market. It followed and compared four product innovation projects within Iran Khodro Company (IKCO), an exemplar of capability development within the Iranian Auto industry. Findings show that the maturation of strategic capability at the organisational level has occurred through a sequence of product innovation projects and by dynamically shaping the learning and knowledge integration processes in accordance with emergence of the new structure within the industry. Accordingly, Strategic Capability Development is conceptualised in an interpretive model. Such findings are useful for development of an explanatory model and a practical capability development framework for managing learning and knowledge across different product innovation projects.
Resumo:
This thesis identifies attributes, skills and behaviours that major project managers require for stakeholder relationships competence and project success within a major project environment. It develops valid and reliable measures of internal and external stakeholder relationships competence, tests a complex conceptual model and explores the effectiveness of the QUT Executive Masters of Complex Project Management and Strategic Procurement in developing major project managers' stakeholder relationships competence. Implications of this thesis are for government and industry in identifying factors associated with major project success, as this will lead to better major project outcomes potentially resulting in time and monetary savings of years and billions of dollars.
Resumo:
There has been a greater focus on strengthening evaluation capacity building (ECB) within development organisations in recent years. This can be attributed in part to the growing appreciation of the value of participatory and collaborative forms of evaluation. Evaluation is increasingly seen as an ongoing learning process and an important means of strengthening capacity and improving organisational performance (Horton et al., 2003:7). While there are many benefits of using participatory methodologies in ECB projects, our experiences and a review of the literature in this area highlight the many challenges, issues and contradictions that can affect the success of such ECB efforts. We discuss these issues, drawing on our learnings from the ongoing participatory action research (PAR) project 'Assessing Communication for Social Change’ (AC4SC). This four year project, which began in 2007, is a collaboration between communication and development academics and evaluation specialists from two Australian universities and communication for development practitioners and monitoring and evaluation (M&E) staff in the NGO Equal Access Nepal (EAN). The aim is to develop, implement, and evaluate a participatory methodology for assessing the social change impacts of community radio programs produced by EAN. It builds on previous projects that used ethnographic action research (EAR) methodology (Tacchi et al., 2007).
Resumo:
Until recently, sustainable development was perceived as essentially an environmental issue, relating to the integration of environmental concerns into economic decision-making. As a result, environmental considerations have been the primary focus of sustainability decision making during the economic development process for major projects, and the assessment and preservation of social and cultural systems has been arguably too limited. The practice of social impact and sustainability assessment is an established and accepted part of project planning, however, these practices are not aimed at delivering sustainability outcomes for social systems, rather they are designed to minimise ‘unsustainability’ and contribute to project approval. Currently, there exists no widely recognised standard approach for assessing social sustainability and accounting for positive externalities of existing social systems in project decision making. As a result, very different approaches are applied around the world, and even by the same organisations from one project to another. This situation is an impediment not only to generating a shared understanding of the social implications as related to major projects, but more importantly, to identifying common approaches to help improve social sustainability outcomes of proposed activities. This paper discusses the social dimension of sustainability decision making of mega-projects, and argues that to improve accountability and transparency of project outcomes it is important to understand the characteristics that make some communities more vulnerable than others to mega-project development. This paper highlights issues with current operational level approaches to social sustainability assessment at the project level, and asserts that the starting point for project planning and sustainability decision making of mega-projects needs to include the preservation, maintenance, and enhancement of existing social and cultural systems. It draws attention to the need for a scoping mechanism to systematically assess community vulnerability (or sensitivity) to major infrastructure development during the feasibility and planning stages of a project.
Resumo:
Road construction, maintenance and operation are activities that impact the environment by way of energy use, resource consumption and emission. Components such as construction material, transportation, street lighting, rolling resistance, traffic congestion during works, albedo and end-of-life processing impact the environment at different phases of the life of a road. With a view to promote sustainable development, a few sustainability rating schemes, e.g. Infrastructure Sustainability and Invest (Australia), Envision and Greenroads (USA), and CEEQUAL (UK) have been developed, that can assess road projects. These schemes address environmental areas such as: energy and emission, land, water, materials, discharges into surroundings, waste and ecology as factors for sustainable development. This paper assesses different rating schemes based on a defined comprehensive life cycle assessment (LCA) system boundary for road projects to identify different environmental indicators that address sustainable road development and operation. The findings indicate that new indicators are required to address different environmental components during the operation phase of roads.
Resumo:
Mobile devices are rapidly developing into the primary technology for users to work, socialize, and play in a variety of settings and contexts. Their pervasiveness has provided researchers with the means to investigate innovative solutions to ever more complex user demands. Tools for Mobile Multimedia Programming and Development investigates the use of mobile platforms for research projects, focusing on the development, testing, and evaluation of prototypes rather than final products, which enables researchers to better understand the needs of users through image processing, object recognition, sensor integration, and user interactions. This book benefits researchers and professionals in multiple disciplines who utilize such techniques in the creation of prototypes for mobile devices and applications. This book is part of the Advances in Wireless Technologies and Telecommunication series collection.
Resumo:
Road infrastructure has been considered as one of the most expensive and extensive infrastructure assets of the built environment globally. This asset also impacts the natural environment significantly during different phases of life e.g. construction, use, maintenance and end-of-life. The growing emphasis for sustainable development to meet the needs of future generations requires mitigation of the environmental impacts of road infrastructure during all phases of life e.g. construction, operation and end-of-life disposal (as required). Life-cycle analysis (LCA), a method of quantification of all stages of life, has recently been studied to explore all the environmental components of road projects due to limitations of generic environmental assessments. The LCA ensures collection and assessment of the inputs and outputs relating to any potential environmental factor of any system throughout its life. However, absence of a defined system boundary covering all potential environmental components restricts the findings of the current LCA studies. A review of the relevant published LCA studies has identified that environmental components such as rolling resistance of pavement, effect of solar radiation on pavement(albedo), traffic congestion during construction, and roadway lighting & signals are not considered by most of the studies. These components have potentially higher weightings for environment damage than several commonly considered components such as materials, transportation and equipment. This paper presents the findings of literature review, and suggests a system boundary model for LCA study of road infrastructure projects covering potential environmental components.
Resumo:
This series of research vignettes is aimed at sharing current and interesting research findings from our team of international Entrepreneurship researchers. In this vignette, Alireza Javanmardi Kashan and Kavoos Mohannak considers ‘How do firms develop competitive capabilities within product innovation projects?’
Resumo:
The construction and operation of infrastructure assets can have significant impact on society and the region. Using a sustainability assessment framework can be an effective means to build sustainability aspects into the design, construction and operation of infrastructure assets. The conventional evaluation processes and procedures for infrastructure projects do not necessarily measure the qualitative/quantitative effectiveness of all aspects of sustainability: environment, social wellbeing and economy. As a result, a few infrastructure sustainability rating schemes have been developed with a view to assess the level of sustainability attained in the infrastructure projects. These include: Infrastructure Sustainability (Australia); CEEQUAL (UK); and Envision (USA). In addition, road sector specific sustainability rating schemes such as Greenroads (USA) and Invest (Australia) have also been developed. These schemes address several aspects of sustainability with varying emphasis (weightings) on areas such as: use of resources; emission, pollution and waste; ecology; people and place; management and governance; and innovation. The attainment of sustainability of an infrastructure project depends largely on addressing the whole-of-life environmental issues. This study has analysed the rating schemes’ coverage of different environmental components for the road infrastructure under the five phases of a project: material, construction, use, maintenance and end-of-life. This is based on a comprehensive life cycle assessment (LCA) system boundary. The findings indicate that there is a need for the schemes to consider key (high impact) life cycle environmental components such as traffic congestion during construction, rolling resistance due to surface roughness and structural stiffness of the pavement, albedo, lighting, and end-of-life management (recycling) to deliver sustainable road projects.