Construction sector application of Lead Indicators generally and Positive Performance Indicators (PPIs) particularly, are largely seen by the sector as not providing generalizable indicators of safety effectiveness. Similarly, safety culture is often cited as an essential factor in improving safety performance, yet there is no known reliable way of measuring safety culture. This paper proposes that the accurate measurement of safety effectiveness and safety culture is a requirement for assessing safe behaviours, safety knowledge, effective communication and safety performance. Currently there are no standard national or international safety effectiveness indicators (SEIs) that are accepted by the construction industry. The challenge is that quantitative survey instruments developed for measuring safety culture and/ or safety climate are inherently flawed methodologically and do not produce reliable and representative data concerning attitudes to safety. Measures that combine quantitative and qualitative components are needed to provide a clear utility for safety effectiveness indicators.
Resumo:
The aim of this project is to develop a systematic investment decision-making framework for infrastructure asset management by incorporation economic justification, social and environmental consideration in the decision-making process. This project assesses the factors that are expected to provide significant impacts on the variability of expenditures. A procedure for assessing risk and reliability for project investment appraisals will be developed. The project investigates public perception, social and environmental impacts on road infrastructure investment. This research will contribute to the debate about how important social and environmental issues should be incorporated into the investment decision-making process for infrastructure asset management.
Resumo:
Objectives The objectives of this project were two-fold: • Assess the ease with which current architectural CAD systems supported the use ofparametric descriptions in defining building shape, engineering system performance and cost at the early stages of building design; • Assess the feasibility of implementing a software decision support system that allowed designers to trade-off the characteristics and configuration of various engineering systems to move towards a “global optimum” rather than considering each system in isolation and expecting humans to weigh up all of the costs and benefits. The first stage of the project consisted of using four different CAD systems to define building shells (envelopes) with different usages. These models were then exported into a shared database using the IFC information exchange specifications. The second stage involved the implementation of small computer programs that were able to estimate relevant system parameters based on performance requirements and the constraints imposed by the other systems. These are presented in a unified user interface that extracts the appropriate building shape parameters from the shared database Note that the term parametric in this context refers to the relationships among and between all elements of the building model - not just geometric associations - which will enable the desired coordination.
Resumo:
Belonging to an online community offers teachers the opportunity to exchange ideas, make connections with a wider peer group and form collaborative networks. The increasing popularity of teacher professional communities means that we need to understand how they work and determine the role they may play in teacher professional development. This chapter will map data from a doctoral study to a recentlydeveloped model of professional development to offer a new perspective of how online communities can add to a teacher’s personal and professional growth and, in so doing, add to the small number of studies in this field. This chapter will conclude with a call for a revision of the way we approach professional development in the 21st century and suggest that old models and metaphors are hindering the adoption of more effective means of professional development for teachers.
Resumo:
- This paper presents a validation proposal for development of diagnostic and prognostic algorithms for SF6 puffer circuit-breakers reproduced from actual site waveforms. The re-ignition/restriking rates are duplicated in given circuits and the cumulative energy dissipated in interrupters by the restriking currents. The targeted objective is to provide a simulated database for diagnosis of re-ignition/restrikes relating to the phase to earth voltage and the number of re-ignition/restrikes as well as estimating the remaining life of SF6 circuit-breakers. The model-based diagnosis of a tool will be useful in monitoring re-ignition/restrikes as well as predicting a nozzle’s lifetime. This will help ATP users with practical study cases and component data compilation for shunt reactor switching and capacitor switching. This method can be easily applied with different data for the different dielectric curves of circuit breakers and networks. This paper presents modelling details and some of the available cases, required project support, the validation proposal, the specific plan for implementation and the propsed main contributions.
Resumo:
Recent initiatives around the world have highlighted the potential for information and communications technology (ICT) to foster better service delivery for businesses. Likewise, ICT has also been applied to government services and is seen to result in improved service delivery, improved citizen participation in government, and enhanced cooperation across government departments and between government departments. The Council of Australian Governments (COAG) (2006) identified local government development assessment (DA) arrangements as a ‘hot spot’ needing specific attention, as the inconsistent policies and regulations between councils impeded regional economic activity. COAG (2006) specifically suggested that trials of various ICT mechanisms be initiated which may well be able to improve DA processes for local government. While the authors have explored various regulatory mechanisms to improve harmonisation elsewhere (Brown and Furneaux 2007), the possibility of ICT being able to enhance consistency across governments is a novel notion from a public policy perspective. Consequently, this paper will explore the utility of ICT initiatives to improve harmonisation of DA across local governments. This paper examines as a case study the recent attempt to streamline Development Assessment (DA) in local governments in South East Queensland. This initiative was funded by the Regulation Reduction Incentive Fund (RRIF), and championed by the South East Queensland (SEQ) Council of Mayors. The Regulation Reduction Incentive Fund (RRIF) program was created by the Australian government with the aim to provide incentives to local councils to reduce red tape for small and medium sized businesses. The funding for the program was facilitated through a competitive merit-based grants process targeted at Local Government Authorities. Grants were awarded to projects which targeted specific areas identified for reform (AusIndustry, 2007), in SEQ this focused around improving DA processes and creating transparency in environmental health policies, regulation and compliance. An important key factor to note with this case study is that it is unusual for an eGovernment initiative. Typically individual government departments undertake eGovernment projects in order to improve their internal performance. The RRIF case study examines the implementation of an eGovernment initiative across 21 autonomous local councils in South East Queensland. In order to move ahead, agreement needed to be reached between councils at the highest level. Having reviewed the concepts of eGovernment and eGovernance, the literature review is undertaken to identify the typical cost and benefits, barriers and enablers of ICT projects in government. The specific case of the RRIF project is then examined to determine if similar costs and benefits, barriers and enablers could be found in the RRIF project. The outcomes of the project, particularly in reducing red tape by increasing harmonisation between councils are explored.
Resumo:
The supply chain in the construction industry is less well developed than in manufacturing. This project proposes to bring world class international business profile benchmarking to assist in the development of small and medium sized (SME) subcontractors. This approach has been widely used in Europe and has enabled significant sectoral supply chain development. The construction SME supply chain is a critical component in the delivery of all construction projects. Furthermore, it undermines the sustainability of the individual enterprise and puts construction projects and jobs at risk. Government procurement agencies view this as construction industry capacity building. In the developed and developing worlds, SME sector firms routinely make up over 95% of companies. The construction industry supply chain is dominated by such firms. Supply chain development and capacity building have been largely neglected in the construction sector, despite rhetoric about the importance of the SME sector to the economy This project seeks to investigate the potential to apply the International Business Profile Benchmarking instrument with the construction industry. The project recognises that there are many facets to the quest for continuous improvement in the construction industry and in wider workplace in general. This first interim report reviews the international literature relating to construction industry performance measurement and performance improvement. A summary of the findings follow. ‘Best value’ is dealt with in a separate interim report.
Resumo:
In the previous research CRC CI 2001-010-C “Investment Decision Framework for Infrastructure Asset Management”, a method for assessing variation in cost estimates for road maintenance and rehabilitation was developed. The variability of pavement strength collected from a 92km national highway was used in the analysis to demonstrate the concept. Further analysis was conducted to identify critical input parameters that significantly affect the prediction of road deterioration. In addition to pavement strength, rut depth, annual traffic loading and initial roughness were found to be critical input parameters for road deterioration. This report presents a method developed to incorporate other critical parameters in the analysis, such as unit costs, which are suspected to contribute to a certain degree to cost estimate variation. Thus, the variability of unit costs will be incorporated in this analysis. Bruce Highway located in the tropical east coast of Queensland has been identified to be the network for the analysis. This report presents a step by step methodology for assessing variation in road maintenance and rehabilitation cost estimates.
Resumo:
Work environments have previously been studied to identify the strategies, structures and processes which increase the likelihood of creativity, innovation and collaboration for productive workplaces. A number of perspectives have emerged which identify social and cognitive factors known to contribute to or to restrict innovation and collaboration. Recently more attention has been given to designing physical environments to encourage processes relevant to innovation such as creativity (McCoy & Evans, 2002) knowledge sharing (Hemlin, Allwood & Martin, 2008) and collaboration (Bozeman & Corley, 2004). Some attention has been given specifically to research and development environments (Boutellier et al, 2008) but little integration of this research has occurred. In the context of the construction of new purpose-built premises which will bring together under one roof separate public sector agencies engaged in research and development in agriculture, natural resource systems and the environment, this paper examines the extant literature and develops initial propositions for research relevant to the transition, collaboration and performance of research and development in new organizational environments where traditional boundaries have been redrawn.
Resumo:
New product development projects are experiencing increasing internal and external project complexity. Complexity leadership theory proposes that external complexity requires adaptive and enabling leadership, which facilitates opportunity recognition (OR). We ask whether internal complexity also requires OR for increased adaptability. We extend a model of EO and OR to conclude that internal complexity may require more careful OR. This means that leaders of technically or structurally complex projects need to evaluate opportunities more carefully than those in projects with external or technological complexity.
Resumo:
In Australia, an average 49 building and construction workers have been killed at work each year since 1997-98. Building/construction workers are more than twice as likely to be killed at work, than the average worker in all Australian industries. The ‘Safer Construction’ project, funded by the CRC-Construction Innovation and led by a task force comprising representatives of construction clients, designers and constructors, developed a Guide to Best Practice for Safer Construction. The Guide, which was informed by research undertaken at RMIT University, Queensland University of Technology and Curtin University, establishes broad principles for the improvement of safety in the industry and provides a ‘roadmap’ for improvement based upon lifecycle stages of a building/construction project. Within each project stage, best practices for the management of safety are identified. Each best practice is defined in terms of the recommended action, its key benefits, desirable outcomes, performance measures and leadership. ‘Safer Construction’ practices are identified from the planning to commissioning stages of a project. The ‘Safer Construction’ project represents the first time that key stakeholder groups in the Australian building/construction industry have worked together to articulate best practice and establish an appropriate basis for allocating (and sharing) responsibility for project safety performance.
Resumo:
In Australia, between 1994 and 2000, 50 construction workers were killed each year as a result of their work, the industry fatality rate, at 10.4 per 100,000 persons, is similar to the national road toll fatality rate and the rate of serious injury is 50% higher than the all industries average. This poor performance represents a significant threat to the industry’s social sustainability. Despite the best efforts of regulators and policy makers at both State and Federal levels, the incidence of death, injury and illness in the Australian construction industry has remained intransigently high, prompting an industry-led initiative to improve the occupational health and safety (OHS) performance of the Australian construction industry. The ‘Safer Construction’ project involves the development of an evidence-based Voluntary Code of Practice for OHS in the industry.
Resumo:
Capital works procurement and its regulatory policy environment within a country can be complex entities. For example, by virtue of Australia’s governmental division between the Commonwealth, states and local jurisdictions and the associated procurement networks and responsibilities at each level, the tendering process is often convoluted. There are four inter-related key themes identified in the literature in relation to procurement disharmony, including decentralisation, risk & risk mitigation, free trade & competition, and tendering costs. This paper defines and discusses these key areas of conflict that adversely impact upon the business environments of industry through a literature review, policy analysis and consultation with capital works procurement stakeholders. The aim of this national study is to identify policy differences between jurisdictions in Australia, and ascertain whether those differences are a barrier to productivity and innovation. This research forms an element of a broader investigation with an aim of developing efficient, effective and nationally harmonised procurement systems. Keywords: capital works, procurement policy reform Acknowledgement: The research described in this paper carried out by the Australian Cooperative Research Centre for Construction Innovation.