The case study of Lusoponte illustrates the concession awarded by the Portuguese Government to finance, design, build and operate two bridges over the Tagus in Lisbon, Portugal. It includes an overview of the project's background and an analysis of the main risk categories stating both the actual risks encountered and the mitigation measures adopted. Throughout the project a great attention was given to whole life cycle costs, and gains in efficiency and cost control. Among the lessons that can be learned from both the public and private sector is that a complete risk management analysis must include not only the technical factors but also a realistic assessment of environmental and social risks. These were the risks that were somewhat overseen and that caused the main problems to the project's development.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper suggests that collaborative design can be an effective tool to promote social change. A co-design methodology and the results of its application in branding the Waterfall Way (New South Wales, Australia) as an eco- and nature-based tourism destination are presented as an example. The co-design exercise actively involved stakeholders in all stages of the design process, harnessing local tacit knowledge in relation to communication design, stimulating reflection upon what is special about the places, and consequently reinforcing a sense of belonging and the environmental and cultural conservation of place. The achieved results reflect the involvement and ownership of the community towards the design process. However, the application of a collaborative brand design methodology produced more than just a destination brand that is attractive to visitors, in line with local values, ways of living and the environment. It helped to catalyse a social network around tourism, triggering self-organising activity amongst stakeholders, who started to liaise with each other around the emergent regional identity - represented by the new brand they created together. The Waterfall Way branding process is a good example of social construction of shared understanding in and through design, showing that design exercises can have a significant social impact not only on the final product, but also on the realities of people involved in the process.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The purpose of this paper is to emphasis the significance of public asset management in Indonesia that is by identifying opportunities and challenges of Indonesian local governments in adopting current practice of Public Asset Management System. A Case Study, in South Sulawesi Provincial government was used as the approach to achieve the research objective. The case study involved two data collection techniques i.e. interviews followed by study on documents. The result of the study indicates there are some significant opportunities and challenges that Indonesian local government might deal with in adopting current practice of public asset management. There are opportunities that can lead to more effective and efficient local government, accountable and auditable local government organization, increase local government portfolio, and improve the quality of public services. The challenges include no clear institutional and legal framework to support the asset management application, non-profit principle of public assets, cross jurisdictions in public asset management, complexity of local government objectives, and unavailability of data for managing public property. The study only covers condition of South Sulawesi Province, which could not represent exactly the whole local governments’ condition in Indonesia. Findings from this study provide useful input for the policy makers, scholars and asset management practitioners in Indonesia to establish a public asset management framework that suitable for Indonesia.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water quality issues are heavily dependent on land development and management decisions within river and lake catchments or watersheds. Economic benefits of urbanisation may be short‐ lived without cleaner environmental outcomes. However, whole‐of‐catchment thinking is not, as yet, as frequent a consideration in urban planning and development in China as it is in many other countries. Water is predominantly seen as a resource to be ‘owned’ by different jurisdictions and allocated to numerous users, both within a catchment and between catchments. An alternative to this approach is to think of water in the same way as other commodities that must be kept moving through a complex transport system. Water must ultimately arrive at particular destinations in the biosphere, although it travels across a broad landscape and may be held up temporarily at certain places along the way. While water extraction can be heavily controlled, water pollution is far more difficult to regulate. Both have significant impacts on water availability and flows both now and in the future. As Chinese cities strive to improve economic conditions for their citizens, new centres are being rebuilt and environmental valued

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Building for a sustainable environment requires sustainable infrastructure assets. Infrastructure capacity management is the process of ensuring optimal provision of such infrastructure assets. Effectiveness in this process will enable the infrastructure asset owners and its stakeholders to receive full value on their investment. Business research has shown that an organisation can only achieve business value when it has the right capabilities. This paradigm can also be applied to infrastructure capacity management. With limited access to resources, the challenge for infrastructure organisations is to identify and develop core capabilities to enable infrastructure capacity management. This chapter explores the concept of capability and identifies the core capability needed in infrastructure capacity management. Through a case study of the Port of Brisbane, this chapter shows that infrastructure organisations must develop their intelligence gathering capability to effectively manage the capacity of their infrastructure assets.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

With the rapid urbanization progress, water resources protection and water pollution control have become key problems of human environment construction and social sustainable development. Many countries, especially Australia, have mature experiences. Water Sensitive Urban Design (WSUD) is one of the successful strategies that is put forward under this global situation and helps releasing heavy environmental pressure from urbanization. The paper discussed main principles of WSUD and then took Shijiazhuang, Heibei and Yueng, Hunan for examples trying to apply WSUD in river landscape projects in China's new urban area, thus doing contributions to more sustainable water management in new urban areas in China.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A telehealth stethoscope would make it possible for doctors to perform physical examinations on patients at great distances. In order to develop a useful and usable telehealth stethoscope we have conducted fieldwork observations of existing anaesthetic preadmission clinics to understand how stethoscopes are currently used. Both face-to-face consultations and videoconference consultations have been studied. Our results indicate that the stethoscope plays a minor role in the consultation and that consultations are mediated by the administrative work that is the reason for the consultation. We suggest that a stethoscope plays an infrastructural role in the consultation. The implications of considering stethoscopes as infrastructure are explored and considered in the context of a future telehealth stethoscope.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Water Sensitive Urban Design (WSUD) systems have the potential mitigate the hydrologic disturbance and water quality concerns associated with stormwater runoff from urban development. In the last few years WSUD has been strongly promoted in South East Queensland (SEQ) and new developments are now required to use WSUD systems to manage stormwater runoff. However, there has been limited field evaluation of WSUD systems in SEQ and consequently knowledge of their effectiveness in the field, under storm events, is limited. The objective of this research project was to assess the effectiveness of WSUD systems installed in a residential development, under real storm events. To achieve this objective, a constructed wetland, bioretention swale and a bioretention basin were evaluated for their ability to improve the hydrologic and water quality characteristics of stormwater runoff from urban development. The monitoring focused on storm events, with sophisticated event monitoring stations measuring the inflow and outflow from WSUD systems. Data analysis undertaken confirmed that the constructed wetland, bioretention basin and bioretention swale improved the hydrologic characteristics by reducing peak flow. The bioretention systems, particularly the bioretention basin also reduced the runoff volume and frequency of flow, meeting key objectives of current urban stormwater management. The pollutant loads were reduced by the WSUD systems to above or just below the regional guidelines, showing significant reductions to TSS (70-85%), TN (40-50%) and TP (50%). The load reduction of NOx and PO4 3- by the bioretention basin was poor (<20%), whilst the constructed wetland effectively reduced the load of these pollutants in the outflow by approximately 90%. The primary reason for the load reduction in the wetland was due to a reduction in concentration in the outflow, showing efficient treatment of stormwater by the system. In contrast, the concentration of key pollutants exiting the bioretention basin were higher than the inflow. However, as the volume of stormwater exiting the bioretention basin was significantly lower than the inflow, a load reduction was still achieved. Calibrated MUSIC modelling showed that the bioretention basin, and in particular, the constructed wetland were undersized, with 34% and 62% of stormwater bypassing the treatment zones in the devices. Over the long term, a large proportion of runoff would not receive treatment, considerably reducing the effectiveness of the WSUD systems.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article reports the details of a research on novel design in the field of semitrailer sector and discuss design by hazard prevention techniques. The novel design made addresses occupational health and safety (OHS)concerns of fall from heights. The research includes a detailed survey of national data sources to examine the fatalities caused due to fall from heights in car carriers. The study investigates OHS recommendations in Australia for semitrailer sector. Often injuries are caused due to drivers working above the 1.5 meter height for loading, unloading of the cars, moving the decks up, down, strapping the cars, and slipperly. The new design is developed using latest computer aided design and engineeing (CAD, CAE), product data management (PDM), virtual design process (VDP). The new car carrier design excels in reducing the risks of injuries to drivers and new bench mark for OHS standards. The new design has all the decks operated with hydraulics and uses unique ratchet lock mechanism (fool proof design) and loading happens at a safe working height (below 1.5 meter). All the cars are strapped on the safe working height, and then car desks operated hydraulically to transfer them to the required position. This also includes the car on the prime mover, which shuttles across from one deck to other using hydraulic and rack-pinion mechanisms. The novel design car carrier solves the problem of falls from height: next step would be to transfer this technology across other similar effected sectors.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This paper argues that management education needs to consider a trend in learning design which advances more creative learning through an alliance with art-based pedagogical processes. A shift is required from skills training to facilitating transformational learning through experiences that expand human potential, facilitated by artistic processes. In this paper the authors discuss the necessity for creativity and innovation in the workplace and the need to develop better leaders and managers. The inclusion of arts-based processes enhances artful behaviour, aesthetics and creativity within management and organisational behaviour, generating important implications for business innovation. This creative learning focus stems from an analysis of an arts-based intervention for management development. Entitled Management Jazz the program was conducted over three years at a large Australian University. The paper reviews some of the salient literature in the field. It considers four stages of the learning process: capacity, artful event, increased capability, and application/action to produce product. One illustrative example of an arts-based learning process is provided from the Management Jazz program. Research findings indicate that artful learning opportunities enhance capacity for awareness of creativity in one’s self and in others. This capacity correlates positively with a perception that engaging in artful learning enhances the capability of managers in changing collaborative relationships and habitat constraint. The authors conclude that it is through engagement and creative alliance with the arts that management education can explore and discover artful approaches to building creativity and innovation. The illustration presented in this paper will be delivered as a brief workshop at the Fourth Art of Management Conference. The process of bricolage and articles at hand will be used to explore creative constraints and prototypes while generating group collaboration. The mini-workshop will conclude with discussion of the arts-based process and capability enhancement outcomes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to develop a conceptual framework that can be used to identify capabilities needed in the management of infrastructure assets. Design/methodology/approach – This paper utilises a qualitative approach to analyse secondary data in order to develop a conceptual framework that identifies capabilities for strategic infrastructure asset management. Findings – In an external business environment that is undergoing rapid change, it is more appropriate to focus on factors internal to the organisation such as resources and capabilities as a basis to develop competitive advantage. However, there is currently very little understanding of the internal capabilities that are appropriate for infrastructure asset management. Therefore, a conceptual framework is needful to guide infrastructure organisations in the identification of capabilities. Research limitations/implications – This is a conceptual paper and future empirical research should be conducted to validate the propositions made in the paper. Practical implications – The paper clearly argues the need for infrastructure organisations to adopt a systematic approach to identifying the capabilities needed in the management of strategic infrastructure assets. The discussion on the impact of essential capabilities is useful in providing the impetus for managers who operate in a deregulated infrastructure business landscape to review their existing strategies. Originality/value – The paper provides a new perspective on how asset managers can create value for their organisations by investing in the relevant capabilities.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Presentation on intelligent transport systems profects and traffic engineering,simulation and modelling by QUT researchers

Relevância:

30.00% 30.00%

Publicador:

Resumo:

An Asset Management (AM) life-cycle constitutes a set of processes that align with the development, operation and maintenance of assets, in order to meet the desired requirements and objectives of the stake holders of the business. The scope of AM is often broad within an organization due to the interactions between its internal elements such as human resources, finance, technology, engineering operation, information technology and management, as well as external elements such as governance and environment. Due to the complexity of the AM processes, it has been proposed that in order to optimize asset management activities, process modelling initiatives should be adopted. Although organisations adopt AM principles and carry out AM initiatives, most do not document or model their AM processes, let alone enacting their processes (semi-) automatically using a computer-supported system. There is currently a lack of knowledge describing how to model AM processes through a methodical and suitable manner so that the processes are streamlines and optimized and are ready for deployment in a computerised way. This research aims to overcome this deficiency by developing an approach that will aid organisations in constructing AM process models quickly and systematically whilst using the most appropriate techniques, such as workflow technology. Currently, there is a wealth of information within the individual domains of AM and workflow. Both fields are gaining significant popularity in many industries thus fuelling the need for research in exploring the possible benefits of their cross-disciplinary applications. This research is thus inspired to investigate these two domains to exploit the application of workflow to modelling and execution of AM processes. Specifically, it will investigate appropriate methodologies in applying workflow techniques to AM frameworks. One of the benefits of applying workflow models to AM processes is to adapt and enable both ad-hoc and evolutionary changes over time. In addition, this can automate an AM process as well as to support the coordination and collaboration of people that are involved in carrying out the process. A workflow management system (WFMS) can be used to support the design and enactment (i.e. execution) of processes and cope with changes that occur to the process during the enactment. So far few literatures can be found in documenting a systematic approach to modelling the characteristics of AM processes. In order to obtain a workflow model for AM processes commonalities and differences between different AM processes need to be identified. This is the fundamental step in developing a conscientious workflow model for AM processes. Therefore, the first stage of this research focuses on identifying the characteristics of AM processes, especially AM decision making processes. The second stage is to review a number of contemporary workflow techniques and choose a suitable technique for application to AM decision making processes. The third stage is to develop an intermediate ameliorated AM decision process definition that improves the current process description and is ready for modelling using the workflow language selected in the previous stage. All these lead to the fourth stage where a workflow model for an AM decision making process is developed. The process model is then deployed (semi-) automatically in a state-of-the-art WFMS demonstrating the benefits of applying workflow technology to the domain of AM. Given that the information in the AM decision making process is captured at an abstract level within the scope of this work, the deployed process model can be used as an executable guideline for carrying out an AM decision process in practice. Moreover, it can be used as a vanilla system that, once being incorporated with rich information from a specific AM decision making process (e.g. in the case of a building construction or a power plant maintenance), is able to support the automation of such a process in a more elaborated way.