276 resultados para Buried infrastructure
Resumo:
Given global demand for new infrastructure, governments face substantial challenges in funding new infrastructure and simultaneously delivering Value for Money (VfM). As background to this challenge, a brief review is given of current practice in the selection of major public sector infrastructure in Australia, along with a review of the related literature concerning the Multi-Attribute Utility Approach (MAUA) and the effect of MAUA on the role of risk management in procurement selection. To contribute towards addressing the key weaknesses of MAUA, a new first-order procurement decision making model is mentioned. A brief summary is also given of the research method and hypothesis used to test and develop the new procurement model and which uses competition as the dependent variable and as a proxy for VfM. The hypothesis is given as follows: When the actual procurement mode matches the theoretical/predicted procurement mode (informed by the new procurement model), then actual competition is expected to match optimum competition (based on actual prevailing capacity vis-à-vis the theoretical/predicted procurement mode) and subject to efficient tendering. The aim of this paper is to report on progress towards testing this hypothesis in terms of an analysis of two of the four data components in the hypothesis. That is, actual procurement and actual competition across 87 road and health major public sector projects in Australia. In conclusion, it is noted that the Global Financial Crisis (GFC) has seen a significant increase in competition in public sector major road and health infrastructure and if any imperfections in procurement and/or tendering are discernible, then this would create the opportunity, through the deployment of economic principles embedded in the new procurement model and/or adjustments in tendering, to maintain some of this higher level post-GFC competition throughout the next business cycle/upturn in demand including private sector demand. Finally, the paper previews the next steps in the research with regard to collection and analysis of data concerning theoretical/predicted procurement and optimum competition.
Resumo:
Airports worldwide represent key forms of critical infrastructure in addition to serving as nodes in the international aviation network. While the continued operation of airports is critical to the functioning of reliable air passenger and freight transportation, these infrastructure systems face a number of sources of disturbance that threaten their operational viability. Recent examples of high magnitude events include the eruption of Iceland’s Eyjafjallajokull volcano eruption (Folattau and Schofield 2010), the failure of multiple systems at the opening of Heathrow’s Terminal 5 (Brady and Davies 2010) and the Glasgow airport 2007 terrorist attack (Crichton 2008). While these newsworthy events do occur, a multitude of lower-level more common disturbances also have the potential to cause significant discontinuity to airport operations. Regional airports face a unique set of challenges, particularly in a nation like Australia where they serve to link otherwise remote and isolated communities to metropolitan hubs (Wheeler 2005), often without the resources and political attention received by larger capital city airports. This paper discusses conceptual relationships between Business Continuity Management (BCM) and High Reliability Theory, and proposes BCM as an appropriate risk-based management process to ensure continued airport operation in the face of uncertainty. In addition, it argues that that correctly implemented BCM can lead to highly reliable organisations. This is framed within the broader context of critical infrastructures and the need for adequate crisis management approaches suited to their unique requirements (Boin and McConnell 2007).
Resumo:
In 2009 the Australian Federal and State governments are expected to have spent some AU$30 billion procuring infrastructure projects. For governments with finite resources but many competing projects, formal capital rationing is achieved through use of Business Cases. These Business cases articulate the merits of investing in particular projects along with the estimated costs and risks of each project. Despite the sheer size and impact of infrastructure projects, there is very little research in Australia, or internationally, on the performance of these projects against Business Case assumptions when the decision to invest is made. If such assumptions (particularly cost assumptions) are not met, then there is serious potential for the misallocation of Australia’s finite financial resources. This research addresses this important gap in the literature by using combined quantitative and qualitative research methods, to examine the actual performance of 14 major Australian government infrastructure projects. The research findings are controversial as they challenge widely held perceptions of the effectiveness of certain infrastructure delivery practices. Despite this controversy, the research has had a significant impact on the field and has been described as ‘outstanding’ and ‘definitive’ (Alliancing Association of Australasia), "one of the first of its kind" (Infrastructure Partnerships of Australia) and "making a critical difference to infrastructure procurement" (Victorian Department of Treasury). The implications for practice of the research have been profound and included the withdrawal by Government of various infrastructure procurement guidelines, the formulation of new infrastructure policies by several state governments and the preparation of new infrastructure guidelines that substantially reflect the research findings. Building on the practical research, a more rigorous academic investigation focussed on the comparative cost uplift of various project delivery strategies was submitted to Australia’s premier academic management conference, the Australian and New Zealand Academy of Management (ANZAM) Annual Conference. This paper has been accepted for the 2010 ANZAM National Conference following a process of double blind peer review with reviewers rating the paper’s overall contribution as "Excellent" and "Good".
Resumo:
Highway construction works have significant bearings on all aspects of sustainability. As they typically involve huge capital funds, stakeholders tend to place all interests on the financial justifications of the project, especially when embedding sustainability principles and practices may demand significant initial investment. Increasing public awareness and government policies demand that infrastructure projects respond to environmental challenges and people start to realise the negative consequences of not to pursue sustainability. Stakeholders are now keen to identify sustainable alternatives and financial implications of including them on a whole lifecycle basis. Therefore tools that aid the evaluation of investment options, such as provision of environmentally sustainable features in roads and highways, are highly desirable. Life-cycle cost analysis (LCCA) is generally recognised as a valuable approach for investment decision making for construction works. However to date it has limited application because the current LCCA models tend to focus on economic issues alone and are not able to deal with sustainability factors. This paper reports a research on identifying sustainability related factors in highway construction projects, in quantitative and qualitative forms of a multi-criteria analysis. These factors are then incorporated into existing LCCA models to produce a new sustainability based LCCA model with cost elements specific to sustainability measures. This presents highway project stakeholders a practical tool to evaluate investment decisions and reach an optimum balance between financial viability and sustainability deliverables.
Resumo:
Sourcing funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. Existing communities resist the introduction of new taxes to fund such infrastructure, hence the introduction of charges to the developer has flourished. The Australian infrastructure funding policy dilemmas are reflective of similar matters to some extent in the United Kingdom, and to a greater extent the United States of America. In these countries, infrastructure cost recovery policies have been in place since the 1940’s and 1970’s respectively. There is an extensive body of theoretical and empirical literature that discusses the passing on (to home buyers) or passing back (to the englobo land seller) of these increased infrastructure charges, and the corresponding impact on housing cost and supply. The purpose of this research is to examine the international evidence that suggests infrastructure charges contribute to increased house prices as well as reduced land supply. The paper concludes that whilst the theoretical work is largely consistent, the empirical research to date is inconclusive and further research is required into these impacts in Australia.
Resumo:
The development of highway infrastructure typically requires major capital input over a long period. This often causes serious financial constraints for investors. The push for sustainability has added new dimensions to the complexity in the evaluation of highway projects, particularly on the cost front. This makes the determination of long-term viability even more a precarious exercise. Life-cycle costing analysis (LCCA) is generally recognised as a valuable tool for the assessment of financial decisions on construction works. However to date, existing LCCA models are deficient in dealing with sustainability factors, particularly for infrastructure projects due to their inherent focus on the economic issues alone. This research probed into the major challenges of implementing sustainability in highway infrastructure development in terms of financial concerns and obligations. Using results of research through literature review, questionnaire survey of industry stakeholders and semi-structured interview of senior practitioners involved in highway infrastructure development, the research identified the relative importance of cost components relating to sustainability measures and on such basis, developed ways of improving existing LCCA models to incorporate sustainability commitments into long-term financial management. On such a platform, a decision support model incorporated Fuzzy Analytical Hierarchy Process and LCCA for the evaluation of the specific cost components most concerned by infrastructure stakeholders. Two real highway infrastructure projects in Australia were then used for testing, application and validation, before the decision support model was finalised. Improved industry understanding and tools such as the developed model will lead to positive sustainability deliverables while ensuring financial viability over the lifecycle of highway infrastructure projects.
Resumo:
Despite an increasing highlight on the sustainability agenda by the construction industry, sustainable development is often treated with different philosophy, interpretation, and responsibility at various stages of project development by various stakeholders involved. The actual sustainability deliverables from the industry is not substantially tangible, especially at project levels. For infrastructure projects which typically span over long periods of time, achieving consistent sustainability outcomes during various stages of development remains as a formidable task. The absence of common understanding among stakeholders and the lack of appropriate sustainability reporting mechanism are possible causes. Many policies dealing with these issues tend to be too generic and broad-based for practical adaptation. While there had been a plenty of research initiatives on sustainability assessment, there is often a gap between sustainability deliverables during project implementation and the grandeur of promises during project conception. This paper reviews the historical context of sustainable development and its principles, and past studies on sustainable construction, focusing on infrastructure projects. It goes on to introduce a QUT research project aimed at identifying and integrating the different perceptions and priority needs of the stakeholders, along with identifying issues that impact on the gap between sustainability foci and its actual realization at project end level, in order to generate a framework of enhancing sustainable deliverables. It is expected that the research will help promote more integrated approaches to decision-making on the implementation of sustainability strategies and foci during the construction project delivery processes.
Resumo:
With increasing media exposure and evidence of environmental impacts, it is increasingly recognized that incorporating sustainability principles in construction works is both crucial and beneficial. However a recent survey reveals that among stakeholders of infrastructure projects such as roads, there is no common understanding on what constitutes sustainability in real-life projects. Sustainability has been interpreted widely and differently and as a result, sustainability outcomes are not tangible at the project level or often neglected. Under such conditions, policies and strategies on sustainability remain largely ideological and cannot be sufficiently reflected in the actual project delivery. The major difficulty of this sustainability pursuit lies in the lack of consensus among the experts on sustainability criteria and indicators. To move ahead, these criteria and indicators are to be agreed upon. This paper reviews the sustainable infrastructure development, its criteria and indicators, focusing on road infrastructure context. It goes on to introduce a Delphi study, an integral part of a QUT research, aimed at identifying critical sustainability criteria and indicators for Australian road infrastructure projects. It paves the way for further identification of solutions for each critical indicator at a subsequent stage. The criteria, indicators and solutions will be encapsulated into a decision making framework for the enhancement of sustainability deliverables. By doing so, the research will promote more integrated thinking of and consistent approaches to the sustainability agenda in road and highway infrastructure projects in Australia.
Resumo:
Sourcing appropriate funding for the provision of new urban infrastructure has been a policy dilemma for governments around the world for decades. This is particularly relevant in high growth areas where new services are required to support swelling populations. The Australian infrastructure funding policy dilemmas are reflective of similar matters in many countries, particularly the United States of America, where infrastructure cost recovery policies have been in place since the 1970’s. There is an extensive body of both theoretical and empirical literature from these countries that discusses the passing on (to home buyers) of these infrastructure charges, and the corresponding impact on housing prices. The theoretical evidence is consistent in its findings that infrastructure charges are passed on to home buyers by way of higher house prices. The empirical evidence is also consistent in its findings, with “overshifting” of these charges evident in all models since the 1980’s, i.e. $1 infrastructure charge results in greater than $1 increase in house prices. However, despite over a dozen separate studies over two decades in the US on this topic, no empirical works have been carried out in Australia to test if similar shifting or overshifting occurs here. The purpose of this research is to conduct a preliminary analysis of the more recent models used in these US empirical studies in order to identify the key study area selection criteria and success factors. The paper concludes that many of the study area selection criteria are implicit rather than explicit. By collecting data across the models, some implicit criteria become apparent, whilst others remain elusive. This data will inform future research on whether an existing model can be adopted or adapted for use in Australia.
Resumo:
Transport and logistics are essential to effective business. Very little is currently known about the impact of improved transport on micro-enterprises in developing economies and whether improvements in this area would assist the very poor. This paper looks at the obstacles of an inefficient transport facilitation system and the high costs incurred by 22 survival micro-entrepreneurs funded by the same local NGO and operating in diverse industry sectors in a peri-urban context in Mozambique. Six case studies are selected to illustrate the most common constraints they face. The perspectives of the micro-business owners are confronted with those of government officials and community leaders for two reasons: to identify any mismatch and to discuss possible solutions. Significant discrepancies are detected between government agenda and needs of the population, while community-based entrepreneurship (CBE) is discussed as a possible collective strategy in dealing with the problem.
Resumo:
Failure of buried pipes due to reactive soil movement (e.g. shrinking/swelling) is a common problem for water and gas pipe networks in Australia and the world. Soil movement is closely related to seasonal climatic change, and particularly to the moisture content of soil. Although some research has been carried out to understand the effect of freezing and thawing of soils and temperature effects in colder climates, very limited research has been undertaken to examine the possible failure mechanisms of pipes buried in reactive soils. This study reports the responses of a 2 m long polyethylene pipe buried in reactive clay in a box under laboratory conditions. The soil and pipe movements were measured as the soil was wetted from the bottom of the box. It was observed that the pipe underwent substantial deformation as the soil swelled with increase of the moisture content. The results are explained with a simplified numerical analysis.
Resumo:
Pipelines are important lifeline facilities spread over a large area and they generally encounter a range of seismic hazards and different soil conditions. The seismic response of a buried segmented pipe depends on various parameters such as the type of buried pipe material and joints, end restraint conditions, soil characteristics, burial depths, and earthquake ground motion, etc. This study highlights the effect of the variation of geotechnical properties of the surrounding soil on seismic response of a buried pipeline. The variations of the properties of the surrounding soil along the pipe are described by sampling them from predefined probability distribution. The soil-pipe interaction model is developed in OpenSEES. Nonlinear earthquake time-history analysis is performed to study the effect of soil parameters variability on the response of pipeline. Based on the results, it is found that uncertainty in soil parameters may result in significant response variability of the pipeline.
Resumo:
From its early birth through to the twenty-first century, the planning for social infrastructure has been viewed as a crucial element in promoting the development of healthy communities. The existence of good social infrastructure in every level of human settlement (i.e. neighbourhoods, districts, regions etc.) is vital because it is considered to be an element that impacts positively and meaningfully on the quality of life for members of the targeted community. The increasing importance of the sustainable development agenda in human settlements has prompted concerns over the cost of the government’s failure to provide for adequate social infrastructure for their communities. Part of this failure is attributed to the inconsistent outcome from the use of traditional planning standards that are based on population-to-facility ratios. This paper explores the literature discussion on social infrastructure for sustainable communities. It examines how a participation-oriented, need-sensitive approach in the planning and provision of social infrastructure is used as an alternative to the traditional standards that are based on population-to-facility ratios. It does this by giving an overview of its application in the planning and provision of social infrastructure for Australia’s fastest growing region of South-East Queensland.
Resumo:
To ensure infrastructure assets are procured and maintained by government on behalf of citizens, appropriate policy and institutional architecture is needed, particularly if a fundamental shift to more sustainable infrastructure is the goal. The shift in recent years from competitive and resource-intensive procurement to more collaborative and sustainable approaches to infrastructure governance is considered a major transition in infrastructure procurement systems. In order to better understand this transition in infrastructure procurement arrangements, the concept of emergence from Complex Adaptive Systems (CAS) theory is offered as a key construct. Emergence holds that micro interactions can result in emergent macro order. Applying the concept of emergence to infrastructure procurement, this research examines how interaction of agents in individual projects can result in different industry structural characteristics. The paper concludes that CAS theory, and particularly the concept of ‘emergence’, provides a useful construct to understand infrastructure procurement dynamics and progress towards sustainability.
Resumo:
Public participate in the planning and design of major public infrastructure and construction (PIC) projects is crucial to their success, as the interests of different stakeholders can be systematically captured and built into the finalised scheme. However, public participation may not always yield a mutually acceptable solution, especially when the interests of stakeholders are diverse and conflicting. Confrontations and disputes can arise unless the concerns or needs of the community are carefully analysed and addressed. The aim of the paper is to propose a systematic method of analysing stakeholder concerns relating to PIC projects by examining the degree of consensus and/or conflict involved. The results of a questionnaire survey and a series of interviews with different entities are provided, which indicate the existence of a significant divergence of views among stakeholder groups and that conflicts arise when there is a mismatch between peoples’ perception concerning money and happiness on the one hand and development and damages on the other. Policy and decision-makers should strive to resolve at least the majority of conflicts that arise throughout the lifecycle of major PIC projects so as to maximise their chance of success.