148 resultados para scientific uncertainty


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Objectives: To quantify randomness and cost when choosing health and medical research projects for funding. Design: Analysis of retrospective data from grant review panels. Setting: The National Health & Medical Research Council of Australia. Participants/Data: All panel members’ scores for grant proposals submitted in 2009. Main outcome measure: The proportion of grant proposals that were always, sometimes and never funded after accounting for random variability arising from variation in panel members’ scores; the cost-effectiveness of different size assessment panels. Results: 59% of 620 funded grants were sometimes not funded when random variability was accounted for. Only 9% of grant proposals were always funded, 61% were never funded and 29% were sometimes funded. The extra cost per grant effectively funded from the most effective system was $18,541. Conclusions: Allocating funding for scientific research in health and medicine is costly and somewhat random. There are many useful research questions to be addressed that could improve current processes.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Increasingly societies and their governments are facing important social issues that have science and technology as key features. A number of these socio-scientific issues have two features that distinguish them from the restricted contexts in which school science has traditionally been presented. Some of their science is uncertain and scientific knowledge is not the only knowledge involved. As a result, the concepts of uncertainty, risk and complexity become essential aspects of the science underlying these issues. In this chapter we discuss the nature and role of these concepts in the public understanding of science and consider their links with school science. We argue that these same concepts and their role in contemporary scientific knowledge need to be addressed in school science curricula. The new features for content, pedagogy and assessment of this urgent challenge for science educators are outlined. These will be essential if the goal of science education for citizenship is to be achieved with our students, who will increasingly be required to make personal and collective decisions on issues involving science and technology.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Sales growth and employment growth are the two most widely used growth indicators for new ventures; yet, sales growth and employment growth are not interchangeable measures of new venture growth. Rather, they are related, but somewhat independent constructs that respond differently to a variety of criteria. Most of the literature treats this as a methodological technicality. However, sales growth with or without accompanying employment growth has very different implications for managers and policy makers. A better understanding of what drives these different growth metrics has the potential to lead to better decision making. To improve that understanding we apply transaction cost economics reasoning to predict when sales growth will be or will not be accompanied by employment growth. Our results indicate that our predictions are borne out consistently in resource-constrained contexts but not in resource-munificent contexts.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Risks and uncertainties are inevitable in engineering projects and infrastructure investments. Decisions about investment in infrastructure such as for maintenance, rehabilitation and construction works can pose risks, and may generate significant impacts on social, cultural, environmental and other related issues. This report presents the results of a literature review of current practice in identifying, quantifying and managing risks and predicting impacts as part of the planning and assessment process for infrastructure investment proposals. In assessing proposals for investment in infrastructure, it is necessary to consider social, cultural and environmental risks and impacts to the overall community, as well as financial risks to the investor. The report defines and explains the concept of risk and uncertainty, and describes the three main methodology approaches to the analysis of risk and uncertainty in investment planning for infrastructure, viz examining a range of scenarios or options, sensitivity analysis, and a statistical probability approach, listed here in order of increasing merit and complexity. Forecasts of costs, benefits and community impacts of infrastructure are recognised as central aspects of developing and assessing investment proposals. Increasingly complex modelling techniques are being used for investment evaluation. The literature review identified forecasting errors as the major cause of risk. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. The report contains a summary of the broad nature of decision-making tools used by governments and other organisations in Australia, New Zealand, Europe and North America, and shows their overall approach to risk assessment in assessing public infrastructure proposals. While there are established techniques to quantify financial and economic risks, quantification is far less developed for political, social and environmental risks and impacts. For risks that cannot be readily quantified, assessment techniques commonly include classification or rating systems for likelihood and consequence. The report outlines the system used by the Australian Defence Organisation and in the Australian Standard on risk management. After each risk is identified and quantified or rated, consideration can be given to reducing the risk, and managing any remaining risk as part of the scope of the project. The literature review identified use of risk mapping techniques by a North American chemical company and by the Australian Defence Organisation. This literature review has enabled a risk assessment strategy to be developed, and will underpin an examination of the feasibility of developing a risk assessment capability using a probability approach.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A study has been conducted to investigate current practices on decision-making under risk and uncertainty for infrastructure project investments. It was found that many European countries such as the UK, France, Germany including Australia use scenarios for the investigation of the effects of risk and uncertainty of project investments. Different alternative scenarios are mostly considered during the engineering economic cost-benefit analysis stage. For instance, the World Bank requires an analysis of risks in all project appraisals. Risk in economic evaluation needs to be addressed by calculating sensitivity of the rate of return for a number of events. Risks and uncertainties of project developments arise from various sources of errors including data, model and forecasting errors. It was found that the most influential factors affecting risk and uncertainty resulted from forecasting errors. Data errors and model errors have trivial effects. It was argued by many analysts that scenarios do not forecast what will happen but scenarios indicate only what can happen from given alternatives. It was suggested that the probability distributions of end-products of the project appraisal, such as cost-benefit ratios that take forecasting errors into account, are feasible decision tools for economic evaluation. Political, social, environmental as well as economic and other related risk issues have been addressed and included in decision-making frameworks, such as in a multi-criteria decisionmaking framework. But no suggestion has been made on how to incorporate risk into the investment decision-making process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose: Choosing the appropriate procurement system for construction projects is a complex and challenging task for clients particularly when professional advice has not been sought. To assist with the decision making process, a range of procurement selection tools and techniques have been developed by both academic and industry bodies. Public sector clients in Western Australia (WA) remain uncertain about the pairing of procurement method to bespoke construction project and how this decision will ultimately impact upon project success. This paper examines ‘how and why’ a public sector agency selected particular procurement methods. · Methodology/Approach: An analysis of two focus group workshops (with 18 senior project and policy managers involved with procurement selection) is reported upon · Findings: The traditional lump sum (TLS) method is still the preferred procurement path even though alternative forms such as design and construct, public-private-partnerships could optimize the project outcome. Paradoxically, workshop participants agreed that alternative procurement forms should be considered, but an embedded culture of uncertainty avoidance invariably meant that TLS methods were selected. Senior managers felt that only a limited number of contractors have the resources and experience to deliver projects using the nontraditional methods considered. · Research limitations/implications: The research identifies a need to develop a framework that public sector clients can use to select an appropriate procurement method. A procurement framework should be able to guide the decision-maker rather than provide a prescriptive solution. Learning from previous experiences with regard to procurement selection will further provide public sector clients with knowledge about how to best deliver their projects.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article attempts to explore the concept of scientific community at the macro-national level in the context of Iran. Institutionalisation of science and its professional growth has been constrained by several factors. The article first conceptualises the notion of science community as found in the literature in the context of Iran, and attempts to map through some indicators. The main focus, however, lies in mapping some institutional problems through empirical research. This was undertaken in 2002–04 in order to analyse the structure of the scientific community in Iran in the ‘exact sciences’ (mathematics, physics, chemistry, biology and earth sciences). The empirical work was done in two complementary perspectives: through a questionnaire and statistical analysis of it, and through semistructured interviews with the researchers. There are number of problems confronting scientists in Iran. Facilities provided by institutions is one of the major problems of research. Another is the tenuous cooperation among scientists. This is reported by most of the researchers, who deplore the lack of cooperation among their group. Relationships are mostly with the Ph.D. students and only marginally with colleagues. Our research shows that the more brilliant the scientists, the more frustrated they are from scientific institutions in Iran. Medium-range researchers seem to be much happier about the scientific institution to which they belong than the brighter scholars. The scientific institutions in Iran seem to be built for the needs of the former rather than the latter. These institutions seem not to play a positive role in the case of the best scientists. On the whole, many ingredients of the scientific community, at least at its inception, are present among Iranian scientists: the strong desire for scientific achievement in spite of personal, institutional and economic problems.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Information uncertainty which is inherent in many real world applications brings more complexity to the visualisation problem. Despite the increasing number of research papers found in the literature, much more work is needed. The aims of this chapter are threefold: (1) to provide a comprehensive analysis of the requirements of visualisation of information uncertainty and their dimensions of complexity; (2) to review and assess current progress; and (3) to discuss remaining research challenges. We focus on four areas: information uncertainty modelling, visualisation techniques, management of information uncertainty modelling, propagation and visualisation, and the uptake of uncertainty visualisation in application domains.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Preterm infants have an increased risk of low bone mass and subsequent fracture due to limited bone mass accretion in utero and a greater need for bone nutrients. The diagnosis of ostepeonia of prematurity remains difficult as there is no sctreening test which is both sensitive and specific.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The effects of particulate matter on environment and public health have been widely studied in recent years. A number of studies in the medical field have tried to identify the specific effect on human health of particulate exposure, but agreement amongst these studies on the relative importance of the particles’ size and its origin with respect to health effects is still lacking. Nevertheless, air quality standards are moving, as the epidemiological attention, towards greater focus on the smaller particles. Current air quality standards only regulate the mass of particulate matter less than 10 μm in aerodynamic diameter (PM10) and less than 2.5 μm (PM2.5). The most reliable method used in measuring Total Suspended Particles (TSP), PM10, PM2.5 and PM1 is the gravimetric method since it directly measures PM concentration, guaranteeing an effective traceability to international standards. This technique however, neglects the possibility to correlate short term intra-day variations of atmospheric parameters that can influence ambient particle concentration and size distribution (emission strengths of particle sources, temperature, relative humidity, wind direction and speed and mixing height) as well as human activity patterns that may also vary over time periods considerably shorter than 24 hours. A continuous method to measure the number size distribution and total number concentration in the range 0.014 – 20 μm is the tandem system constituted by a Scanning Mobility Particle Sizer (SMPS) and an Aerodynamic Particle Sizer (APS). In this paper, an uncertainty budget model of the measurement of airborne particle number, surface area and mass size distributions is proposed and applied for several typical aerosol size distributions. The estimation of such an uncertainty budget presents several difficulties due to i) the complexity of the measurement chain, ii) the fact that SMPS and APS can properly guarantee the traceability to the International System of Measurements only in terms of number concentration. In fact, the surface area and mass concentration must be estimated on the basis of separately determined average density and particle morphology. Keywords: SMPS-APS tandem system, gravimetric reference method, uncertainty budget, ultrafine particles.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Advanced Research Methods in the Built Environment addresses common topics raised by postgraduate level researchers rather than dealing with all aspects of the research process. Issues covered range from the practicalities of producing a journal article to the role of theory in research.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Nonlinearity, uncertainty and subjectivity are the three predominant characteristics of contractors prequalification which cause the process more of an art than a scientific evaluation. A fuzzy neural network (FNN) model, amalgamating both the fuzzy set and neural network theories, has been developed aiming to improve the objectiveness of contractor prequalification. Through the FNN theory, the fuzzy rules as used by the prequalifiers can be identified and the corresponding membership functions can be transformed. Eighty-five cases with detailed decision criteria and rules for prequalifying Hong Kong civil engineering contractors were collected. These cases were used for training (calibrating) and testing the FNN model. The performance of the FNN model was compared with the original results produced by the prequalifiers and those generated by the general feedforward neural network (GFNN, i.e. a crisp neural network) approach. Contractor’s ranking orders, the model efficiency (R2) and the mean absolute percentage error (MAPE) were examined during the testing phase. These results indicate the applicability of the neural network approach for contractor prequalification and the benefits of the FNN model over the GFNN model. The FNN is a practical approach for modelling contractor prequalification.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

One of the new challenges in aeronautics is combining and accounting for multiple disciplines while considering uncertainties or variability in the design parameters or operating conditions. This paper describes a methodology for robust multidisciplinary design optimisation when there is uncertainty in the operating conditions. The methodology, which is based on canonical evolution algorithms, is enhanced by its coupling with an uncertainty analysis technique. The paper illustrates the use of this methodology on two practical test cases related to Unmanned Aerial Systems (UAS). These are the ideal candidates due to the multi-physics involved and the variability of missions to be performed. Results obtained from the optimisation show that the method is effective to find useful Pareto non-dominated solutions and demonstrate the use of robust design techniques.