27 resultados para refurbishment
Resumo:
The main objective was to compare the environmental impacts of a building undergoing refurbishment both before and after the refurbishment and to assist in the design of the refurbishment with what is learned.
Resumo:
A need for an efficient life care management of building portfolio is becoming increasingly due to increase in aging building infrastructure globally. Appropriate structural engineering practices along with facility management can assist in optimising the remaining life cycle costs for existing public building portfolio. A more precise decision to either demolish, refurbish, do nothing or rebuilt option for any typical building under investigation is needed. In order to achieve this, the status of health of the building needs to be assessed considering several aspects including economic and supply-demand considerations. An investment decision for a refurbishment project competing with other capital works and/or refurbishment projects can be supported by emerging methodology residual service life assessment. This paper discusses challenges in refurbishment projects of public buildings and with a view towards development of residual service life assessment methodology
Resumo:
In recent years considerable effort has gone into quantifying the reuse and recycling potential of waste generated by residential construction. Unfortunately less information is available for the commercial refurbishment sector. It is hypothesised that significant economic and environmental benefit can be derived from closer monitoring of the commercial construction waste stream. With the aim of assessing these benefits, the authors are involved in ongoing case studies to record both current standard practice and the most effective means of improving the eco-efficiency of materials use in office building refurbishments. This paper focuses on the issues involved in developing methods for obtaining the necessary information on better waste management practices and establishing benchmark indicators. The need to create databases to establish benchmarks of waste minimisation best practice in commercial construction is stressed. Further research will monitor the delivery of case study projects and the levels of reuse and recycling achieved in directly quantifiable ways
Resumo:
The refurbishment of commercial buildings is growing as a percentage of overall construction activity in Australia and this trend is likely to continue. Refurbishment generates a significant waste stream much of which is potentially reusable or recyclable. Despite this potential, several factors are known to unnecessarily inhibit the amount of recycling that actually occurs on renovation projects. In order to identify the reasons causing this reluctance, a process of project monitoring and expert consultation was carried out. Twenty three experts experienced in commercial refurbishment projects and three waste contractors with specific knowledge of construction waste were interviewed. Records of receipts for waste from a case study project reveal three principal factors inhibiting recycling rates: the presence of asbestos in the building; the continued occupation of the building during construction; and the breaking up of a large project into small separate contracts thereby reducing economies of scale. To ascertain the potential for improvement, current rates for reuse and recycling of materials were collected from the experts. The results revealed a considerable variation in practice between companies and indicated key areas which should be targeted to improve performance.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
The refurbishment of The National Trust House (Basement3), undertaken in 2005, represents heritage consultation, architectural and interior design of a disused and deteriorating subbasement of a historically and culturally significant building situated in Brisbane. Research into rectification and restoration work of the existing structure and interior surfaces (inclusive of masonry work sourced from the Kangaroo Point quarry in the 1860's) formed a significant component of the project. The National Trust House sub basement 3 was refurbished to house the Architectural Practice Academy, a joint initiative of the Queensland Government and the Australian Institute of Architects.
Resumo:
The increasing stock of aging office buildings will see a significant growth in retrofitting projects in Australian capital cities. Stakeholders of refitting works will also need to take on the sustainability challenge and realize tangible outcomes through project delivery. Traditionally, decision making for aged buildings, when facing the alternatives, is typically economically driven and on ad hoc basis. This leads to the tendency to either delay refitting for as long as possible thus causing building conditions to deteriorate, or simply demolish and rebuild with unjust financial burden. The technologies involved are often limited to typical strip-clean and repartition with dry walls and office cubicles. Changing business operational patterns, the efficiency of office space, and the demand on improved workplace environment, will need more innovative and intelligent approaches to refurbishing office buildings. For example, such projects may need to respond to political, social, environmental and financial implications. There is a need for the total consideration of buildings structural assessment, modeling of operating and maintenance costs, new architectural and engineering designs that maximise the utility of the existing structure and resulting productivity improvement, specific construction management procedures including procurement methods, work flow and scheduling and occupational health and safety. Recycling potential and conformance to codes may be other major issues. This paper introduces examples of Australian research projects which provided a more holistic approach to the decision making of refurbishing office space, using appropriate building technologies and products, assessment of residual service life, floor space optimisation and project procurement in order to bring about sustainable outcomes. The paper also discusses a specific case study on critical factors that influence key building components for these projects and issues for integrated decision support when dealing with the refurbishment, and indeed the “re-life”, of office buildings.
Resumo:
The Regenerating Construction Project for the CRC for Construction Innovation aims to assist in the delivery of demonstrably superior ‘green’ buildings. Components of the project address eco-efficient redesign, achieving a smaller ecological footprint, enhancing indoor environment and minimising waste in design and construction. The refurbishment of Council House 1 for Melbourne City Council provides an opportunity to develop and demonstrate tools that will be of use for commercial building refurbishment generally. It is hoped that the refurbishment will act as an exemplar project to demonstrate environmentally friendly possibilities for office building refurbishment.
Resumo:
This paper describes the process adopted in developing an integrated decision support framework for planning of office building refurbishment projects, with specific emphasize on optimising rentable floor space, structural strengthening, residual life and sustainability. Expert opinion on the issues to be considered in a tool is being captured through the DELPHI process, which is currently ongoing. The methodology for development of the integrated tool will be validated through decisions taken during a case study project: refurbishment of CH1 building of Melbourne City Council, which will be followed through to completion by the research team. Current status of the CH1 planning will be presented in the context of the research project.
Resumo:
The quality of office indoor environments is considered to consist of those factors that impact the occupants according to their health and well-being and (by consequence) their productivity. Indoor Environment Quality (IEQ) can be characterized by four indicators: • Indoor air quality indicators • Thermal comfort indicators • Lighting indicators • Noise indicators. Within each indicator, there are specific metrics that can be utilized in determining an acceptable quality of an indoor environment based on existing knowledge and best practice. Examples of these metrics are: indoor air levels of pollutants or odorants; operative temperature and its control; radiant asymmetry; task lighting; glare; ambient noise. The way in which these metrics impact occupants is not fully understood, especially when multiple metrics may interact in their impacts. It can be estimated that the potential cost of lost productivity from poor IEQ may be much in excess of other operating costs of a building. However, the relative productivity impacts of each of the four indicators is largely unknown. The CRC Project ‘Regenerating Construction to Enhance Sustainability’ has a focus on IEQ impacts before and after building refurbishment. This paper provides an overview of IEQ impacts and criteria and the implementation of a CRC project that is currently researching these factors during the refurbishment of a Melbourne office building. IEQ measurements and their impacts will be reported in a future paper
Resumo:
The quality of office indoor environments is considered to consist of those factors that impact occupants according to their health and well-being and (by consequence) their productivity. Indoor Environment Quality (IEQ) can be characterized by four indicators: • Indoor air quality indicators • Thermal comfort indicators • Lighting indicators • Noise indicators. Within each indicator, there are specific metrics that can be utilized in determining an acceptable quality of an indoor environment based on existing knowledge and best practice. Examples of these metrics are: indoor air levels of pollutants or odorants; operative temperature and its control; radiant asymmetry; task lighting; glare; ambient noise. The way in which these metrics impact occupants is not fully understood, especially when multiple metrics may interact in their impacts. While the potential cost of lost productivity from poor IEQ has been estimated to exceed building operation costs, the level of impact and the relative significance of the above four indicators are largely unknown. However, they are key factors in the sustainable operation or refurbishment of office buildings. This paper presents a methodology for assessing indoor environment quality (IEQ) in office buildings, and indicators with related metrics for high performance and occupant comfort. These are intended for integration into the specification of sustainable office buildings as key factors to ensure a high degree of occupant habitability, without this being impaired by other sustainability factors. The assessment methodology was applied in a case study on IEQ in Australia’s first ‘six star’ sustainable office building, Council House 2 (CH2), located in the centre of Melbourne. The CH2 building was designed and built with specific focus on sustainability and the provision of a high quality indoor environment for occupants. Actual IEQ performance was assessed in this study by field assessment after construction and occupancy. For comparison, the methodology was applied to a 30 year old conventional building adjacent to CH2 which housed the same or similar occupants and activities. The impact of IEQ on occupant productivity will be reported in a separate future paper
Resumo:
Purpose – The purpose of this paper is to set out to explore the similarities and differences between jargon used to describe future-focussed commercial building product. This is not so much an exercise in semantics as an attempt to demonstrate that responses to challenges facing the construction and property sectors may have more to do with language than is generally appreciated. Design/methodology/approach – This is a conceptual analysis which draws upon relevant literature. Findings – Social responsibility and sustainability are often held to be much the same thing, with each term presupposing the existence of the other. Clearly, however, there are incidences where sustainable commercial property investment (SCPI) may not be particularly socially responsible, despite being understood as an environmentally friendly initiative. By contrast, socially responsible assets, at least in theory, should always be more sustainable than mainstream non-ethically based investment. Put simply, the expression of social responsibility in the built environment may evoke, and thereby deliver, a more sustainable product, as defined by wider socially inclusive parameters. Practical implications – The findings show that promoting an ethic of social responsibility may well result in more SCPI. Thus, the further articulation and celebration of social responsibility concepts may well help to further advance a sustainable property investment agenda, which is arguably more concerned about demonstrability of efficiency than wider public good outcomes. Originality/value – The idea that jargon affects outcomes is not new. However, this idea has rarely, if ever, been applied to the distinctions between social responsibility and sustainability. Even a moderate re-emphasis on social responsibility in preference to sustainability may well provide significant future benefits with respect to the investment, building and refurbishment of commercial property.
Resumo:
While raised floors as a building component has been around since the 70's, its application in terms of a holistic system in the fit-out of commercial office buildings has not been fully embraced due to some inherent problems and negative perceptions of the stakeholders involved. Today, the new generation of raised floor systems(RFS) offers a suite of innovative and integrated products and solutions, and as such are not only suitable for the changing office space requirements, but also capable of meeting tbe smart and sustainable challenges, which are becoming the prerequisite in the refurbishment of existing buildings. As there has been a prediction for continued growth in refurbishment projects in major cities around the globe, RFS as an alternative methodology warrants new examination and highlight. This paper introduces research recently completed in Australia that provided a holistic approach to the application of RFS enabled by intelligent building technologies, and examined key issues of project development when refurbishing commercial office buildings. It focuses on the constructability of RFS, and how it will respond to smart feature requirements in buildings while extending service life, meeting new organisational change and workplace health needs for applications in today's office environment. It also introduces key project procurement issues and the integrated decision support when dealing with the refurbishment of office buildings. The paper recommends procurement strategies as well as the justification of adopting the RFS technology in the Australian office building sector. Given the current economic downturn, refitting as opposed to new build .projects will come onto the spotlight. This paper will provide valuable information for building owners and developers alike when contemplating the retrofit of office buildings.
Resumo:
The modern society has come to expect the electrical energy on demand, while many of the facilities in power systems are aging beyond repair and maintenance. The risk of failure is increasing with the aging equipments and can pose serious consequences for continuity of electricity supply. As the equipments used in high voltage power networks are very expensive, economically it may not be feasible to purchase and store spares in a warehouse for extended periods of time. On the other hand, there is normally a significant time before receiving equipment once it is ordered. This situation has created a considerable interest in the evaluation and application of probability methods for aging plant and provisions of spares in bulk supply networks, and can be of particular importance for substations. Quantitative adequacy assessment of substation and sub-transmission power systems is generally done using a contingency enumeration approach which includes the evaluation of contingencies, classification of the contingencies based on selected failure criteria. The problem is very complex because of the need to include detailed modelling and operation of substation and sub-transmission equipment using network flow evaluation and to consider multiple levels of component failures. In this thesis a new model associated with aging equipment is developed to combine the standard tools of random failures, as well as specific model for aging failures. This technique is applied in this thesis to include and examine the impact of aging equipments on system reliability of bulk supply loads and consumers in distribution network for defined range of planning years. The power system risk indices depend on many factors such as the actual physical network configuration and operation, aging conditions of the equipment, and the relevant constraints. The impact and importance of equipment reliability on power system risk indices in a network with aging facilities contains valuable information for utilities to better understand network performance and the weak links in the system. In this thesis, algorithms are developed to measure the contribution of individual equipment to the power system risk indices, as part of the novel risk analysis tool. A new cost worth approach was developed in this thesis that can make an early decision in planning for replacement activities concerning non-repairable aging components, in order to maintain a system reliability performance which economically is acceptable. The concepts, techniques and procedures developed in this thesis are illustrated numerically using published test systems. It is believed that the methods and approaches presented, substantially improve the accuracy of risk predictions by explicit consideration of the effect of equipment entering a period of increased risk of a non-repairable failure.