286 resultados para project management tools
Resumo:
Purpose - Building project management (BPM) requires effective coordination and collaboration between multiple project team organisations which can be achieved by real time information flow between all participants. In the present scenario, this can be achieved by the use of information communication technologies (ICT). The purpose of this paper is to present part of a research project conducted to study the causal relationships between factors affecting ICT adoption for BPM by small and medium enterprises. Design/methodology/approach - This paper discusses structural equation modelling (SEM) analysis conducted to test the causal relationships between quantitative factors. Data for quantitative analysis were gathered through a questionnaire survey conducted in the Indian construction industry. Findings - SEM analysis results help in demonstrating that an increased and matured use of ICT for general administration within the organisation would lead to: an improved ICT infrastructure within the organisation; development of electronic databases; and a staff that is confident of using information technology (IT) tools. In such a scenario, staff would use advanced software and IT technologies for project management (PM) processes and that would lead to an increased adoption of ICT for PM processes. But, for general administration also, ICT adoption would be enhanced if the organisation is interacting more with geographically separated agencies and senior management perceives that significant benefits would accrue by adoption of ICT. All the factors are inter-related and their effect cannot be maximized in isolation. Originality/value - The results provide direction to building project managements for strategically adopting the effective use of ICT within their organisations and for BPM general.
Resumo:
The purpose of this paper is to show how project management governance is addressed through the use of a specific meta-method. Governance is defined here on two criteria: accountability and performance. Accountability is promoted through transparency and performance is promoted by responsive and responsible decision-making. According to a systemic perspective, transparency and decision-making involve having information, tacit or explicit knowledge, as well as understanding of the context, the different parameters and variables, their interaction and conditions of change. Although this method of methods was built according a heuristic process involving 25 years of various researches and consulting activities, it seems appropriate to draw its foundations. I clarify first my epistemological position and the notion of project and project management, as Art and Science. This lead me to define a "Be" / "Have" posture to this regards. Then, the main theoretical roots of MAP Method are exposed: Boisot' s Social Learning Cycle, Praxeology and Theory of Convention. Then we introduced the main characteristics of the method and the 17 methods and tools constituting MAP "tool box", thus with regard to the project management governance perspective. Finally, I discuss the integration of two managerial modes (operational and project modes) and the consequence in term of governance in a specific socio-techno-economic project/context ecosystem.
Resumo:
Foreword: In this paper I call upon a praxiological approach. Praxeology (early alteration of praxiology) is the study of human action and conduct. The name praxeology/praxiologyakes is root in praxis, Medieval Latin, from Greek, doing, action, from prassein to do, practice (Merriam-Webster Dictionary). Having been involved in project management education, research and practice for the last twenty years, I have constantly tried to improve and to provide a better understanding/knowledge of the field and related practice, and as a consequence widen and deepen the competencies of the people I was working with (and my own competencies as well!), assuming that better project management lead to more efficient and effective use of resources, development of people and at the end to a better world. For some time I have perceived a need to clarify the foundations of the discipline of project management, or at least elucidate what these foundations could be. An immodest task, one might say! But not a neutral one! I am constantly surprised by the way the world (i.e., organizations, universities, students and professional bodies) sees project management: as a set of methods, techniques, tools, interacting with others fields – general management, engineering, construction, information systems, etc. – bringing some effective ways of dealing with various sets of problems – from launching a new satellite to product development through to organizational change.
Resumo:
Purpose – The purpose of this paper is to provide a summary description of the doctoral thesis investigating the field of project management (PM) deployment. Researchers will be informed of the current contributions within this topic and of the possible further investigations and researches. The decision makers and practitioners will be aware of a set of tools addressing the PM deployment with new perspectives. Design/methodology/approach – Research undertaken with the thesis is based on quantitative methods using time series statistics (time distance analysis) and comparative and correlation analysis aimed to better define and understand the PM deployment within and between countries or groups. Findings – The results suggest a project management deployment index (PMDI) to objectively measure the PM deployment based on the concept of certification. A proposed framework to empirically benchmark the PM deployment between countries by integrating the PMDI time series with the two dimensional comparative analysis of Sicherl. The correlation analysis within Hoftsede cultural framework shows the impact of the national culture dimensions on the PM deployment. The forecasting model shows a general continual growth trend of the PM deployment, with continual increase in the time distance between the countries. Research limitations/implications – The PM researchers are offered an empirical quantification on which they can construct further investigations and understanding of this phenomenon. The number of possible units that can be studied offers wide possibilities to replicate the thesis work. New researches can be undertaken to investigate further the contribution of other social or economical indicators, or to refine and enrich the definition of the PMDI indicator. Practical implications – These results have important implications on the PM deployment approaches. The PMDI measurements and time series comparisons facilitate considerably the measurement and benchmarking between the units (e.g. countries) and against targets, while the readiness setting of the studied unit (in terms of development and cultural levels) impacts the PM deployment within this country. Originality/value – This paper provides a summary of cutting-edge research work in the studied field of PM deployment and a link to the published works that researchers can use to help them understand the thesis research as well as how it can be extended.
Resumo:
The PMBOK Guide is one of the most influential publications concerning the knowledge of the project manangement. Moreover, the pervasion of this guide seems to be set to increase as the basis of accreditation - in conjunction with the increasing global trend toward obtaining project management professional status. However, despite the influence and strengthening profile of this guide, reports continue to be published that detail numerous project failures in a wide range of different industries. The PMBOK Guide comprises mainly declarative (know-what) and procedural (know-how) information. In this sense, the guide is largely normative and provides a very good example of the limitations of this approach as highlighted by proponents of a move to the genuine application of positibe theory in project management.----- The aim of this paper is to determine the applicability of the guide in Australia and to determine the extent to which project success can be attributed to the guide. Project Managers from a variety of organisations were surveyed. This postal survey yielded 48 replies. Descriptive statistics was used to assess the incidence and effectivieness of all the processes in the guide. The results indicate that there were no processes that could be considered as peripheral or as a candidate for elimination from the guide. More specifically, all the processes were identified as either a key routine process or a key selective process and positively related to the level of project success. However, the results also indicated that other major factors pertaining to causal knowledge (know-why) are, at least, equally important determinants of project success. It is concluded that declarative, procedural and causal knowledge are all valuable, and given the preponderance of the first two types of knowledge, there seems to be an urgent need to now ensure an equal quest for causal knowledge. In terms of developing causal knowledge, a good starting point would appear to be both positive theory from production and economics.
Resumo:
Construction projects are faced with a challenge that must not be underestimated. These projects are increasingly becoming highly competitive, more complex, and difficult to manage. They become ‘wicked problems’, which are difficult to solve using traditional approaches. Soft Systems Methodology (SSM) is a systems approach that is used for analysis and problem solving in such complex and messy situations. SSM uses “systems thinking” in a cycle of action research, learning and reflection to help understand the various perceptions that exist in the minds of the different people involved in the situation. This paper examines the benefits of applying SSM to wicked problems in construction project management, especially those situations that are challenging to understand and difficult to act upon. It includes relevant examples of its use in dealing with the confusing situations that incorporate human, organizational and technical aspects.
Resumo:
Construction projects can involve a diverse range of stakeholders and the success of the project depends very much on fulfilling their needs and expectations. It is important, therefore, to identify and recognize project stakeholders and develop a rigorous stakeholder management process. However, limited research has investigated the impact of stakeholders on construction projects in developing countries. A stakeholder impact analysis (SIA), based on an approach developed by Olander (2007), was adopted to investigate the stakeholders' impact on state-owned civil engineering projects in Vietnam. This involved the analysis of a questionnaire survey of 57 project managers to determine the relative importance of different stakeholders. The results show the client to have the highest level of impact on the projects, followed by project managers and the senior management of state-owned engineering firms. The SIA also provides suggestions to project managers in developing and evaluating the stakeholder management process.
Resumo:
Purpose : Effective flow of data and communication at every stage of a construction project is essential for achieving required coordination and collaboration between the project participants, leading to successful management of the projects. In present scenario, when project participants are geographically separated, adoption of information communication technology (ICT) enables such effective communication. Thus, the purpose of this paper is to focus on ICT adoption for building project management.---------- Design/methodology/approach : It is difficult to quantitatively evaluate the benefits of ICT adoption in the multiple enterprise scenario of building project management. It requires qualitative analysis based on the perceptions of the construction professionals. The paper utilizes interpretive structural modeling (ISM) technique to assess importance of perceived benefits and their driving power and dependence on other benefits.---------- Findings : The developed ISM model shows that all the categories of benefits, i.e. benefits related to projects, team management, technology, and organization are inter-related and cannot be achieved in isolation. But, organization- and technology-related benefits have high-driving power and these are “strategic benefits” for the project team organizations. Thus, organizations are required to give more attention on strategically increasing these benefits from application of ICT. Originality/value – This analysis provides a road map to managers or project management organizations to decide that if they are planning ICT adoption for achieving certain benefits then which are the other driving benefits that should be achieved prior to that and also which are the dependent benefits that would be achieved by default.
Resumo:
Building project management requires effective coordination and collaboration between multiple project members. It can be achieved through real time communication flow between all. In present scenario, it can be achieved through adoption of Information and Communication Technologies (ICT). Construction industry primarily comprises small and medium enterprises (SMEs). Also, ICT adoption has been slow in the industry.---------- Research is required to assess the factors that affect ICT adoption at the three levels of industry, organization and people, with focus on SMEs. This paper discusses a component of the research undertaken to study these factors and issues in the context of Indian construction industry. A questionnaire survey was conducted and through quantitative data analysis the extent of adoption of formal Project Management processes, ICT adoption for these processes and factors including perception based factors affecting ICT adoption were studied. Results of data analysis includes identification of issues that require action at the three study levels.---------- The results can be generalized for other countries with due considerations, specifically for countries where the construction industry is similar to Indian construction industry in terms of working methodologies or for large countries.
Resumo:
A research study was conducted in a key area of project management: stakeholder and relationship management through communication - ‘the soft skills’. It was conducted with Diploma of Project Management graduates from one Australian Registered Training Organisation (RTO), the Australian College of Project Management (ACPM). The study was designed to initially identify the qualifications and project management experience of the participants. Further, it identified the respondents’ understanding of and attitude to commonly held principles and literature within the project management field as it relates to the soft skills of projects. This is specifically connected to their project experience and knowledge, approach to project communications, and the stakeholder’s needs. Some of the literature showed that through the management and application of the project soft skills by project managers may actually be a recipe for project success. Hence, an important underpinning of this study was that the project manager can enhance project success (or reduce the impact of failure) by identifying and prioritising stakeholders, developing and implementing strategies for engaging and communicating with them. The use of a positivist approach to this research study allowed for the evaluation and understanding of respondents to the emergent theories of successful projects being delivered through the management of stakeholders, communications, and relationships. Consequently, a quantitative approach to this study was undertaken. The participants were drawn from graduates who completed (graduated) from the ACPM with the Diploma of Project Management between January 2004 and December 2007 only. A list of graduates was collated from this period indicating that a total of 656 graduates have completed and graduated with the qualification. The data collection for this study was done in one phase only. The questionnaire was emailed individually by the researcher directly to the selected potential respondents. Subsequently, a total of 44 responses were received, providing an overall response rate of 43%. Two key factors emerged from the survey questionnaire. Firstly, the need for the soft skills to be incorporated in project management curriculum and education programs, and secondly, that successful projects are delivered through the management and application of the project soft skills. It is expected that the findings of this study be provided across various forums (such as vocational education and training, and project management conferences) and via project management bodies such as the Australian Institute of Project Management (AIPM) to inform learning and provide greater insight into the soft skills of project management. It is the contention of the researcher that this quantitative study of Diploma of Project Management graduates’ views and attitudes highlights the importance of project soft skills and its importance in the delivery of successful projects as well as being part of the competencies of a successful project manager. This study also revealed the value of project experience and knowledge as it pertains to the management and application of the project soft skills.
Resumo:
Purpose – Building project management requires real time flow of information between all the project team members or the supply chain members. In the present scenario, when project participants are geographically separated, adoption of Information Communication Technology (ICT) enables such effective communication. But strategic adoption of ICT requires that all the supply chain members follow the accepted methods of communication or the communication protocols. The majority of the construction organizations are small and medium enterprises (SMEs). This research, therefore, proposes to focus on developing IT-enhanced communication protocols for building project management by SMEs. Design/methodology/approach – The research adopts a sequential mixed methods approach, where data collection and analysis are conducted in both the quantitative and qualitative phases of research. Findings – The protocols are proposed as a “Strategic Model for Enhancing ICT Diffusion in Building Projects”. The framework for the model is discussed at three levels of study, i.e industry, organization, and people. Practical implications – While the research was conducted in an Indian context, the research outcome is envisaged to be widely applicable in other countries with due considerations. Originality/value – The developed framework has implications for national level bodies and academic institutions, organizations, people or project managers and is applicable at the international level after due considerations.