193 resultados para delay reduction
Resumo:
Traffic control at road junctions is one of the major concerns in most metropolitan cities. Controllers of various approaches are available and the required control action is the effective green-time assigned to each traffic stream within a traffic-light cycle. The application of fuzzy logic provides the controller with the capability to handle uncertain natures of the system, such as drivers’ behaviour and random arrivals of vehicles. When turning traffic is allowed at the junction, the number of phases in the traffic-light cycle increases. The additional input variables inevitably complicate the controller and hence slow down the decision-making process, which is critical in this real-time control problem. In this paper, a hierarchical fuzzy logic controller is proposed to tackle this traffic control problem at a 2-way road junction with turning traffic. The two levels of fuzzy logic controllers devise the minimum effective green-time and fine-tune it respectively at each phase of a traffic-light cycle. The complexity of the controller at each level is reduced with smaller rule-set. The performance of this hierarchical controller is examined by comparison with a fixed-time controller under various traffic conditions. Substantial delay reduction has been achieved as a result and the performance and limitation of the controller will be discussed.
Resumo:
Construction delays are a critical problem for Malaysian public sector projects. These delays have been blamed mainly on inefficient traditional construction practices that continue to dominate the current industry. This paper reports the progress to date of a Ph.D. research project aimed at developing a framework to utilize Supply Chain Management (SCM) tools to improve the time performance of Malaysian Government projects. The potential of SCM has been identified for public sector governance and its use in Malaysia is now being considered within the strategy of the Malaysian Construction Industry Master Plan (2006-2015). Encouraged by success in the UK, there is a cautious optimism concerning the successful application of SCM in Malaysia. This paper considers delay as a problem in Malaysian public sector projects, establishes the need to embrace SCM and then elucidates the need and strategies for the development of a delay reduction framework. A literature review, survey mechanism and structured interview schedule will be undertaken to achieve the research objectives. The final research outcome will be a framework that addresses root delay contributors (“pathogens”) and applies SCM tools for their mitigation.
Resumo:
The concept of moving block signallings (MBS) has been adopted in a few mass transit railway systems. When a dense queue of trains begins to move from a complete stop, the trains can re-start in very close succession under MBS. The feeding substations nearby are likely to be overloaded and the service will inevitably be disturbed unless substations of higher power rating are used. By introducing starting time delays among the trains or limiting the trains’ acceleration rate to a certain extent, the peak energy demand can be contained. However, delay is introduced and quality of service is degraded. An expert system approach is presented to provide a supervisory tool for the operators. As the knowledge base is vital for the quality of decisions to be made, the study focuses on its formulation with a balance between delay and peak power demand.
Resumo:
The aim of this study was to assess the accuracy of placement of pelvic binders and to determine whether circumferential compression at the level of the greater trochanters is the best method of reducing a symphyseal diastasis. Patients were identified by a retrospective review of all pelvic radiographs performed at a military hospital over a period of 30 months. We analysed any pelvic radiograph on which the buckle of the pelvic binder was clearly visible. The patients were divided into groups according to the position of the buckle in relation to the greater trochanters: high, trochanteric or low. Reduction of the symphyseal diastasis was measured in a subgroup of patients with an open-book fracture, which consisted of an injury to the symphysis and disruption of the posterior pelvic arch (AO/OTA 61-B/C). We identified 172 radiographs with a visible pelvic binder. Five cases were excluded due to inadequate radiographs. In 83 (50%) the binder was positioned at the level of the greater trochanters. A high position was the most common site of inaccurate placement, occurring in 65 (39%). Seventeen patients were identified as a subgroup to assess the effect of the position of the binder on reduction of the diastasis. The mean gap was 2.8 times greater (mean difference 22 mm) in the high group compared with the trochanteric group (p < 0.01). Application of a pelvic binder above the level of the greater trochanters is common and is an inadequate method of reducing pelvic fractures and is likely to delay cardiovascular recovery in these seriously injured patients.