71 resultados para competitiveness, labour costs, productivity, relative prices, comercial flows
Resumo:
The construction industry is one of major strategic importance. Its level of productivity has a significant effect on national economic growth. The analysis of published census/biannual surveys of construction by the Department of Statistics of Malaysia shows that Malaysia managed to achieve construction labour productivity growth between 1996 and 2005 despite increases in cost per employee. The decrease in unit labour costs is attributed to the value added improvement per worker through the increase in capital intensity. The marginal decline in capital productivity is due to the gestation period and the overcapacity of the industry. The civil engineering sub-sector recorded the highest labour productivity and is the most labour competitive in terms of unit labour cost and added value per labour cost. The residential sub-sectors recorded greatest change in the productivity indicators between 1996 and 2005.
Resumo:
As all environmental problems are caused by human systems of design, sustainability can be seen as a design problem. Given the massive energy and material flows through the built environment, sustainability simply cannot be achieved without the re-design of our urban areas. ‘Eco-retrofitting’, as used here, means modifying buildings and/or urban areas to create net positive social and environmental impacts – both on site and off site. While this has probably not been achieved anywhere as yet, myriad but untapped eco-solutions are already available which could be up-scaled to the urban level. It is now well established that eco-retrofitting buildings and cities with appropriate design technology can pay for itself through lower health costs, productivity increases and resource savings. Good design would also mean happier human and ecological communities at a much lower cost over time. In fact, good design could increase life quality and the life support services of nature while creating sustainable‘economic’growth. The impediments are largely institutional and intellectual, which can be encapsulated in the term ‘managerial’. There are, however, also systems design solutions to the managerial obstacles that seem to be stalling the transition to sustainable systems designs. Given the sustainability imperative, then, why is the adoption of better management systems so slow? The oral presentation will show examples of ways in which built environment design can create environments that not only reduce the ongoing damage of past design, but could theoretically generate net positive social and ecological outcomes over their life cycle. These illustrations show that eco-retrofitting could cost society less than doing nothing - especially given the ongoing renovations of buildings - but for managerial hurdles. The paper outlines on how traditional managerial approaches stand in the way of ‘design for ecosystem services’, and list some management solutions that have long been identified, but are not yet widely adopted. Given the pervasive nature of these impediments and their alternatives, they are presented by way of examples. A sampling of eco-retrofitting solutions are also listed to show that ecoretrofitting is a win-win-win solution that stands ready to be implemented by people having management skills and/or positions of influence.
Resumo:
This paper examines the dynamic behaviour of relative prices across seven Australian cities by applying panel unit root test procedures with structural breaks to quarterly consumer price index data for 1972 Q1–2011 Q4. We find overwhelming evidence of convergence in city relative prices. Three common structural breaks are endogenously determined at 1985, 1995, and 2007. Further, correcting for two potential biases, namely Nickell bias and time aggregation bias, we obtain half-life estimates of 2.3–3.8 quarters that are much shorter than those reported by previous research. Thus, we conclude that both structural breaks and bias corrections are important to obtain shorter half-life estimates.
Resumo:
With a view to minimising the spiraling labour costs, the concrete masonry industry is developing thin layer mortar technology (known as thin bed technology) collaboratively with Queensland University of Technology. Similar technologies are practiced in Europe mainly for clay brick masonry; in the UK thin layer mortared concrete masonry has been researched under commercial contract with limited information published. This paper presents numerous experimental data generated over the past three years. It is shown that this form of masonry requires special drymixed mortar containing a minimum of 2% polymer for improved workability and blocks with tighter height tolerance, both of which might increase the cost of these constituent materials. However, through semiskilled labour, tools to dispense and control the thickness of mortar and the associated increase in productivity, reduction to the overall costs of this form of construction can be achieved. Further the polymer mortar provides several advantages: (1) improved sustainability due to dry curing and (2) potential to construct mortar layers of 2mm thickness and (3) ability for mechanisation of mortar application and control of thickness without the need for skilled labour.
Resumo:
The direct and indirect health effects of increasingly warmer temperatures are likely to further burden the already overcrowded hospital emergency departments (EDs). Using current trends and estimates in conjunction with future population growth and climate change scenarios, we show that the increased number of hot days in the future can have a considerable impact on EDs, adding to their workload and costs. The excess number of visits in 2030 is projected to range between 98–336 and 42–127 for younger and older groups, respectively. The excess costs in 2012–13 prices are estimated to range between AU$51,000–184,000 (0–64) and AU$27,000–84,000 (65+). By 2060, these estimates will increase to 229–2300 and 145–1188 at a cost of between AU$120,000–1,200,000 and AU$96,000–786,000 for the respective age groups. Improvements in climate change mitigation and adaptation measures are likely to generate synergistic health co-benefits and reduce the impact on frontline health services.
Resumo:
We consider the problem of designing a surveillance system to detect a broad range of invasive species across a heterogeneous sampling frame. We present a model to detect a range of invertebrate invasives whilst addressing the challenges of multiple data sources, stratifying for differential risk, managing labour costs and providing sufficient power of detection.We determine the number of detection devices required and their allocation across the landscape within limiting resource constraints. The resulting plan will lead to reduced financial and ecological costs and an optimal surveillance system.
Resumo:
This study of a unique historic situation is sociologically framed and politically contextualized. It examines the technical and persuasive rhetorical dimensions of calculations employed at a nineteenth-century Queensland sugar plantation and mill in relation to the employment of indentured labour. Historical archival data is interpreted through the lens of the rhetoric of rationality. Queensland legislation permitted the employment of indentured Pacific islanders to assist in the development of its sugar industry. Accounting practices employed at the Colonial Sugar Refinery (CSR) Company’s Goondi Plantation and Mill focused on recording and controlling labour costs to maximize profits and maintain a healthy dividend to shareholders. The use of this single perspective, while it provides a restricted interpretation of events, nevertheless enables some unique insights about the practice of accounting in this historic context.
Resumo:
Highway infrastructure development typically requires major capital input. Unless planned properly, such requirements can cause serious financial constraints for investors. The push for sustainability adds a new dimension to the complexity of evaluating highway projects. Finding environmentally and socially responsible solutions for highway construction will improve its potential for acceptance by the society and in many instances the infrastructure's life span. Even so, the prediction and determination of a project's long-term financial viability can be a precarious exercise. Existing studies in this area have not indicated details of how to identify and deal with costs incurred in pursuing sustainability measures in highway infrastructure. This paper provides insights into the major challenges of implementing sustainability in highway project development in terms of financial concerns and obligations. It discusses the results from recent research through a literature study and a questionnaire survey of key industry stakeholders involved in highway infrastructure development. The research identified critical cost components relating to sustainability measures based on perspectives of industry stakeholders. All stakeholders believe sustainability related costs are an integral part of the decision making. However, the importance rating of these costs is relative to each stakeholder's core business objectives. This will influence the way these cost components are dealt with during the evaluation of highway investment alternatives and financial implications. This research encourages positive thinking among the highway infrastructure practitioners about sustainability. It calls for the construction industry to maximise sustainability deliverables while ensuring financial viability over the life cycle of highway infrastructure projects.
Resumo:
More evenly spread demand for public transport throughout a day can reduce transit service provider‟s total asset and labour costs. A plausible peak spreading strategy is to increase peak fare and/or to reduce off-peak fare. This paper reviews relevant empirical studies for urban rail systems, as rail transit plays a key role in Australian urban passenger transport and experiences severe peak loading variability. The literature is categorised into four groups: a) passenger opinions on willingness to change time for travel, b) valuations of displacement time using stated preference technique, c) simulations of peak spreading based on trip scheduling models, and: d) real-world cases of peak spreading using differential fare. Policy prescription is advised to take into account impacts of traveller‟s time flexibility and joint effects of mode shifting and peak spreading. Although focusing on urban rail, arguments in this paper are relevant to public transport in general with values to researchers and practitioners.
Outsourcing risk -the regulation of occupational health and safety where subcontractors are employed
Resumo:
The subcontracting out of production tasks and services is not a new phenomenon, but from the late 1970s, and more especially over the last 15years, the practice-now frequently referred to as outsourcing-has grown substantially across a range of industries in most industrialized countries.Recent surveys undertaken in the United States,Europe,and Australia have all identified a rapid increase in outsourcing/subcontracting, especially amongst large private and public sector organizations. The Second Australian Workplace Industrial Relations Survey found that the number of contractors, agency workers, outworkers, and volunteers had increased by almost 40% in the last 5 years to 1997 with contracting out more common in the public sector than the private sector. Outsourcing has become a major tool by which large organizations have sought to increase competitiveness/cut costs, bypass regulatory controls, and secure more flexible employment arrangements.
Resumo:
3D printing (3Dp) has long been used in the manufacturing sector as a way to automate, accelerate production and reduce waste materials. It is able to build a wide variety of objects if the necessary specifications are provided to the printer and no problems are presented by the limited range of materials available. With 3Dp becoming cheaper, more reliable and, as a result, more prevalent in the world at large, it may soon make inroads into the construction industry. Little is known however, of 3Dp in current use the construction industry and its potential for the future and this paper seeks to rectify this situation by providing a review of the relevant literature. In doing this, the three main 3Dp methods of contour crafting, concrete printing and D-shape 3Dp are described which, as opposed to the traditional construction method of cutting materials down to size, deliver only what is needed for completion, vastly reducing waste. Also identified is 3Dp’s potential to enable buildings to be constructed many times faster and with significantly reduced labour costs. In addition, it is clear that construction 3Dp can allow the further inclusion of Building Information Modelling into the construction process - streamlining and improving the scheduling requirements of a project. However, current 3Dp processes are known to be costly, unsuited to large-scale products and conventional design approaches, and have a very limited range of materials that can be used. Moreover, the only successful examples of construction in action to date have occurred in controlled laboratory environments and, as real world trials have yet to be completed, it is yet to be seen whether it can be it equally proficient in practical situations. Key Words: 3D Printing; Contour Crafting; Concrete Printing; D-shape; Building Automation.
Resumo:
This paper examines the possibilities for interfuel substitution in Australia in view of the need to shift towards a cleaner mix of fuels and technologies to meet future energy demand and environmental goals. The translog cost function is estimated for the aggregate economy, the manufacturing sector and its subsectors, and the electricity generation subsector. The advantages of this work over previous literature relating to the Australian case are that it uses relatively recent data, focuses on energy-intensive subsectors and estimates the Morishima elasticities of substitution. The empirical evidence shown herein indicates weak-form substitutability between different energy types, and higher possibilities for substitution at lower levels of aggregation, compared with the aggregate economy. For the electricity generation subsector, which is at the centre of the CO2 emissions problem in Australia, significant but weak substitutability exists between coal and gas when the price of coal changes. A higher substitution possibility exists between coal and oil in this subsector. The evidence for the own- and cross-price elasticities, together with the results for fuel efficiencies, indicates that a large increase in relative prices could be justified to further stimulate the market for low-emission technologies.
Resumo:
Productivity is basic statistical information for many international comparisons and country performance assessments. This study estimates the construction labour productivity of 79 selected economies. The real (purchasing power parities converted) and nominal construction expenditure from the Report of 2005 International Comparison Programme published by the World Bank and construction employment from the database of labour statistics (LABORSTA) operated by the Bureau of Statistics of International Labour Organization were used in the estimation. The inference statistics indicate that the descending order of nominal construction labour productivity from high income economies to low income economies is not established. The average construction labour productivity of low income economies is higher than middle income economies when the productivity calculation uses purchasing power parities converted data. Malaysia ranked 50th and 63rd position among the 79 selected economies on real and nominal measurement respectively.
Resumo:
Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.