135 resultados para Environmental Management Plan
Resumo:
The concept of a substantive integrator is introduced as a method for integrated resource and environmental management as a means to assimilate different resource values at the operational or field level. A substantive integrator is a strategic management tool for integrating multiple uses into coprorate management regimes that traditionally manage for single values. Wildlife habitat management is presented as a substantive integrator for managing vegetation on electric utility power line corridors. A case study from northern British Columbia provides an example of wildlife habitat management as a means to integrate other resource values such as aesthetics, access and subsistence along British Columbia Hydro and Power Authority's transmission rights-of-way.
An indexing model for sustainable urban environmental management : the case of Gold Coast, Australia
Resumo:
Improving urban ecosystems and the quality of life of citizens have become a central issue in the global effort of creating sustainable built environments. As human beings our lives completely depend on the sustainability of the nature and we need to protect and manage natural resources in a more sustainable way in order to sustain our existence. As a result of population growth and rapid urbanisation, increasing demand of productivity depletes and degrades natural resources. However, the increasing activities and rapid development require more resources, and therefore, ecological planning becomes an essential vehicle in preserving scarce natural resources. This paper aims to indentify the interation between urban ecosystems and human activities in the context of urban sustainability and explores the degrading environmental impacts of this interaction and the necessity and benefits of using sustainability indicators as a tool in sustainable urban evnironmental management. Additionally, the paper also introduces an environmental sustainability indexing model (ASSURE) as an innovative approach to evaluate the environmental conditions of built environment.
Resumo:
Marinas currently exist primarily to service recreational boats, and these vessels are a potential cause of both problems and opportunities in environmental management. Thus, on the one hand, destructive fuel and other pollutants may be expelled, boat wakes can cause littoral soil erosion, physical damage results from collisions with marine life, and litter and noise pollution occur in otherwise pristine habitat. Boats also provide access to otherwise inaccessible natural environments for educational and other management reasons. In this study, boat traffic at three large marinas located along the Queensland coastline has been field surveyed for introductory information. No attempt was made at this juncture to survey the behaviour of the boat crews and passengers (concerning actual destinations, activities on board, etc. or to survey the recreational boat industry. Such studies rely on boat registration records and personal questionnaires. Some other surveys relating to fishing draw on boat ramp surveys and direct submissions by recreational fishers; these provide some data on daily usage of boat ramps, but without particular attention to boats. We believe field observations of overall boat activities in the water are necessary for environmental management purposes. The aim of the survey was to provide information to help prioritize the potential impacts that boats’ activities have on the surrounding natural environment. Any impact by boats will be a product of their numbers, size, frequency of movement, carrying capacity and routes/destinations. The severity of impacts will dictate the appropriate management action.
Resumo:
From 19 authoritative lists with 164 entries of ‘endangered’ Australian mammal species, 39 species have been reported as extinct. When examined in the light of field conditions, the 18 of these species thought to be from Queensland consist of (a) species described from fragmentary museum material collected in the earliest days of exploration, (b) populations inferred to exist in Queensland by extrapolation from distribution records in neighbouring States or countries, (c) inhabitants of remote and harsh locations where search effort is extraordinarily difficult (especially in circumstances of drought or flooding). and/or (d) individuals that are clearly transitory or peripheral in distribution. ‘Rediscovery’ of such scarce species - a not infrequent occurrence - is nowadays attracting increasing attention. Management in respect of any scarce wildlife in Queensland presently derives from such official lists. The analyses here indicate that this method of prioritizing action needs review. This is especially so because action then tends to be centred on species chosen out of the lists for populist reasons and that mostly addresses Crown lands. There is reason to believe that the preferred management may lie private lands where casual observation has provided for rediscovery and where management is most desirable and practicable.
Resumo:
Market-based environmental regulation is becoming increasingly common within international and national frameworks. In order for market-based regimes to attract sufficient levels of stakeholder engagement, participants within such schemes require an incentive to participate and furthermore need to feel a sense of security about investing in such processes. A sense of security is associated with property-based interests. This article explores the property-related issues connected with the operation of environmental markets. Relevant property-related considerations include examining the significant role that market-based regulation is playing in connection with the environment; examining the links between property rights and markets; exploring the legal definition of property; analysing the rights and powers associated with environmental interests in land; advancing theory on the need for landholder responsibilities in relation to land and examining the legal mechanisms used to recognise environmental property rights, including the registration thereof.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between preservation needs and available funding. Funding levels are not adequate to meet the preservation needs of the roadway network; therefore projects listed in the 4-Year Pavement Management Plan must be ranked to determine which projects should be funded now and which can be postponed until a later year. Currently, each district uses locally developed methods to prioritize projects. These ranking methods have relied on less formal qualitative assessments based on engineers’ subjective judgment. It is important for TxDOT to have a 4-Year Pavement Management Plan that uses a transparent, rational project ranking process. The objective of this study is to develop a conceptual framework that describes the development of the 4-Year Pavement Management Plan. It can be largely divided into three Steps; 1) Network-Level project screening process, 2) Project-Level project ranking process, and 3) Economic Analysis. A rational pavement management procedure and a project ranking method accepted by districts and the TxDOT administration will maximize efficiency in budget allocations and will potentially help improve pavement condition. As a part of the implementation of the 4-Year Pavement Management Plan, the Network-Level Project Screening (NLPS) tool including the candidate project identification algorithm and the preliminary project ranking matrix was developed. The NLPS has been used by the Austin District Pavement Engineer (DPE) to evaluate PMIS (Pavement Management Information System) data and to prepare a preliminary list of candidate projects for further evaluation.
Resumo:
The current regulatory approach to coal seam gas projects in Queensland is based on the philosophy of adaptive environmental management. This method of “learning by doing” is implemented in Queensland primarily through the imposition of layered monitoring and reporting duties on the coal seam gas operator alongside obligations to compensate and “make good” harm caused. The purpose of this article is to provide a critical review of the Queensland regulatory approach to the approval and minimisation of adverse impacts from coal seam gas activities. Following an overview of the hallmarks of an effective adaptive management approach, this article begins by addressing the mosaic of approval processes and impact assessment regimes that may apply to coal seam gas projects. This includes recent Strategic Cropping Land reforms. This article then turns to consider the preconditions for land access in Queensland and the emerging issues for landholders relating to the negotiation of access and compensation agreements. This article then undertakes a critical review of the environmental duties imposed on coal seam gas operators relating to hydraulic fracturing, well head leaks, groundwater management and the disposal and beneficial use of produced water. Finally, conclusions are drawn regarding the overall effectiveness of the Queensland framework and the lessons that may be drawn from Queensland’s adaptive environmental management approach.
Resumo:
The Texas Department of Transportation (TxDOT) is concerned about the widening gap between pavement preservation needs and available funding. Thus, the TxDOT Austin District Pavement Engineer (DPE) has investigated methods to strategically allocate available pavement funding to potential projects that improve the overall performance of the District and Texas highway systems. The primary objective of the study presented in this paper is to develop a network-level project screening and ranking method that supports the Austin District 4-year pavement management plan development. The study developed candidate project selection and ranking algorithms that evaluated pavement conditions of each project candidate using data contained in the Pavement Management Information system (PMIS) database and incorporated insights from Austin District pavement experts; and implemented the developed method and supporting algorithm. This process previously required weeks to complete, but now requires about 10 minutes including data preparation and running the analysis algorithm, which enables the Austin DPE to devote more time and resources to conducting field visits, performing project-level evaluation and testing candidate projects. The case study results showed that the proposed method assisted the DPE in evaluating and prioritizing projects and allocating funds to the right projects at the right time.
Resumo:
This paper reviews a wide range of literature on environmental management in the field in Queensland, and analyzes this by period and by author. An episodic pattern of activities since European settlement is evident. Periods of exploration (pre-1950) and inventory- compilation (ca. 1950-1970) were followed by two decades of media and non-government organization campaigning (ca. 1970-1990), then an era dominated by government regulatory action (ca. 1990-2010). These eras dominated public perception of what was happening in environmental practice. They were delineated by historic ‘interventions’ (summarily, the end of World War II, the 1971 inflationary crisis, and computerization respectively).
Resumo:
Most existing marinas are boat parking/storing and servicing facilities that have been built over a long period of time for the convenience of local boat owners.
Resumo:
Using a state, pressure, response framework, we provide an evidence-based reflection on environmental outcomes in Australia and New Zealand across the domains of climate change, biodiversity, freshwater and marine management, emphasising the role of Indigenous and business perspectives. Significant developments have occurred in the past 20 years through affirmation of Indigenous rights and responsibilities. Responses to climate change have tended to emphasise passive risk management with unclear outcomes. Despite meeting biodiversity protection targets, outcomes are worsening, suggesting a need to challenge the dualistic preservation/production land categorisations. In freshwater and marine management, a mix of collaborative and market-based responses has emerged, although their efficacy remains untested. A reliance on voluntary approaches by business makes critical assessment of progress difficult. Thus, despite strong progress in some areas, the adaptiveness of environmental management remains limited, and many indicators suggest continuing decline in environmental condition. Our responses have been largely pacifying in nature, leading to perverse outcomes and failure to acknowledge alternatives that might address deteriorating environmental conditions. A shift is needed towards deliberative policy experimentation that truly values the application of novel and diversified approaches and facilitates integrated learning across environmental domains.
Resumo:
Bargara Pasturage Reserve: Future Visions This exhibition showcases the work of Postgraduate Landscape Architecture and final year Undergraduate Civil and Environmental Engineering students in response to issues of sustainability in a coastal wetland known as the Bargara Pasturage Reserve; an exemplar of the many issues facing sensitive coastal places in Queensland today. The 312ha Pasturage Reserve at Bargara is the only biofilter between the pressures of Bargara’s urban and tourism expansion, surrounding sugarcane farming, and the Great Sandy Marine Park, including the largest concentration of nesting marine turtles on the eastern Australian mainland. This ephemeral wetland, while struggling to fulfil its coastal biofiltration function, is also in high demand for passive recreation, and the project partners’ priorities were to meet both of these challenges. The students were required to plan and design for the best balance possible amongst, but not limited to: wetland and coastal ecological health, enhancement of cultural heritage and values, sustainable urban development, and local economic health. To understand these challenges, QUT staff and students met with partners, visited and analysed the Pasturage Reserve, spent time in and around Bargara talking to locals and inviting dialogue with Indigenous representatives and the South Sea Islander community. We then went home to Brisbane to undertake theoretical and technical research, and then worked to produce 11 Strategic Plans, 2 Environmental Management Plans and 33 Detailed Designs. One group of students analysed the Bargara coastal landscape as an historical and ongoing series of conversations between ecological systems, cultural heritage, community and stakeholders. Another group identified the landscape as neither ‘urban,’ ‘rural,’ nor ‘natural,’ instead identifying it metaphorically as a series of layered thematic ‘fields’ such as water, conservation, reconciliation, and educational fields. These landscape analyses became the organising mechanisms for strategic planning. An outstanding Strategic Plan was produced by Zhang, Lemberg and Jensen, entitled Metanoia, which means to ‘make a change as the result of reflection on values’. Three implementation phases of “flow”, “flux”, and “flex” span twenty-five years, and present a vision a coastal and marine research and conservation hub, with a focus on coastal wetland function, turtle habitat and coral reef conservation. An Environmental Management Plan by Brand and Stickland focuses on protecting and improving wetland biodiversity and habitat quality, and increasing hydrological and water quality function; vital in a coastal area of such high conservation value. After the planning phase, students individually developed detailed design proposals responsive to their plans. From Metanoia, Zhang concentrated on wetland access and interpretation, proposing four focal places to form the nucleus of a wider pattern of connectivity, and to encourage community engagement with coastal environmental management and education. Jensen tackled the thorny issue of coastal urban development, proposing a sensitive staged eco-village model which maintains both ecological and recreational connectivity between the wetland and the marine environment. This project offered QUT’s partners many innovative options to inform their future planning. BSC, BMRG and Oceanwatch Australia are currently engaged in the investigation of on-ground opportunities drawing on these options.
Resumo:
Renovation and refurbishment of the existing commercial building stock is a growing area of total construction activity and a significant generator of waste sent to landfill in Australia. A written waste management plan (WMP) is a widespread regulatory requirement for commercial office redevelopment projects. There is little evidence, however, that WMPs actually increase the quantity of waste that is ultimately diverted from landfill. Some reports indicate an absence of any formal verification or monitoring process by regulators to assess the efficacy of the plans. In order to gauge the extent of the problem a survey was conducted of twenty four consultants and practitioners involved in commercial office building refurbishment projects to determine the state of current practice with regard to WMPs and to elicit suggestions with regard to ways of making the process more effective. Considerable variation in commitment to recycling policies was encountered indicating a need to revisit waste minimisation practices if the environmental performance of refurbishment projects is to be improved.
Resumo:
Australia, road crash trauma costs the nation A$15 billion annually whilst the US estimates an economic impact of around US$ 230 billion on its network. Worldwide economic cost of road crashes is estimated to be around US$ 518 billion each year. Road accidents occur due to a number of factors including driver behaviour, geometric alignment, vehicle characteristics, environmental impacts, and the type and condition of the road surfacing. Skid resistance is considered one of the most important road surface characteristics because it has a direct effect on traffic safety. In 2005, Austroads (the Association of Australian and New Zealand Road Transport and Traffic Authorities) published a guideline for the management of skid resistance and Queensland Department of Main Roads (QDMR) developed a skid resistance management plan (SRMP). The current QDMR strategy is based on rationale analytical methodology supported by field inspection with related asset management decision tools. The Austroads’s guideline and QDMR's skid resistance management plan have prompted QDMR to review its skid resistance management practice. As a result, a joint research project involving QDMR, Queensland University of Technology (QUT) and the Corporative Research Centre for Integrated Engineering Asset Management (CRC CIEAM) was formed. The research project aims at investigating whether there is significant relationship between road crashes and skid resistance on Queensland’s road networks. If there is, the current skid resistance management practice of QDMR will be reviewed and appropriate skid resistance investigatory levels will be recommended. This paper presents analysis results in assessing the relationship between wet crashes and skid resistance on Queensland roads. Attributes considered in the analysis include surface types, annual average daily traffic (AADT), speed and seal age.
Resumo:
A successful urban management support system requires an integrated approach. This integration includes bringing together economic, socio-cultural and urban development with a well orchestrated transparent and open decision making mechanism. The paper emphasises the importance of integrated urban management to better tackle the climate change, and to achieve sustainable urban development and sound urban growth management. This paper introduces recent approaches on urban management systems, such as intelligent urban management systems, that are suitable for ubiquitous cities. The paper discusses the essential role of online collaborative decision making in urban and infrastructure planning, development and management, and advocates transparent, fully democratic and participatory mechanisms for an effective urban management system that is particularly suitable for ubiquitous cities. This paper also sheds light on some of the unclear processes of urban management of ubiquitous cities and online collaborative decision making, and reveals the key benefits of integrated and participatory mechanisms in successfully constructing sustainable ubiquitous cities.