269 resultados para Economic cycles


Relevância:

60.00% 60.00%

Publicador:

Resumo:

Historically there has been a correlation between the economic cycles and litigation in the area of professional negligence relating to valuers. Negligence actions have principally been instigated by financiers for valuations prepared during more buoyant economic times but where there has been a subsequent loss due to a reduction in property value. More specifically during periods of economic downturn such as 1982 to 1983 and 1990 to 1998 there has been an increased focus by academic writers on professional negligence as it relates to property valuers. Based on historical trends it is anticipated that the end of an extended period of economic prosperity such as has been experienced in Australia, will once again be marked by an increase in litigation against valuers for professional negligence. However, the context of valuers liability has become increasingly complex as a result of statutory reforms introduced in response to the Review of the Law of Negligence Final Report 2002 (“the IPP Report”), in particular the introduction of Civil Liability Acts introducing proportionate liability provisions. This paper looks at valuers’ liability for professional negligence in the context of statutory reforms in Queensland and recent case law to determine the most significant impacts of recent statutory reform on property valuers.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

This study investigates the characteristics and attributes that private equity investors prefer when selecting target acquisitions. These characteristics are examined against a matched sample of firms subject to corporate acquisitions via tender/merger offer during 2000-2009, across seven countries: Australia, Canada, the United Kingdom, the USA, France, Germany and Sweden. We show that firm-specific characteristics are more influential in target selection than external or institutional variables. In particular, private equity targets exhibit lower stock volatility and long-term growth prospects, are larger, and have greater abnormal operating income relative to tender/merger offer target firms. Further, private equity bidders exhibit 'home bias', implying that familiarity motivates target selection. Institutional factors remain largely insignificant across all tests.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Growth in productivity is the key determinant of the long-term health and prosperity of an economy. The construction industry being one of major strategic importance, its productivity performance has a significant effect on national economic growth. The relationship between construction output and economy has received intensive studies, but there is lack of empirical study on the relationship between construction productivity and economic fluctuations. Fluctuations in construction output are endemic in the industry. In part they are caused by the boom and slump of the economy as a whole and in part by the nature of the construction product. This research aims to uncover how the productivity of construction sector is influenced in the course of economic fluctuations in Malaysia. Malaysia has adopted three economic policies – New Economic Policy (1971-1990), National Development Policy (1991-2000) and the National Vision Policy (2001-2010) since gaining independence in 1959. The Privatisation Master Plan was introduced in 1991. Operating within this historical context, the Malaysian construction sector has experienced four business cycles since 1960. A mixed-method design approach is adopted in this study. Quantitative analysis was conducted on the published official statistics of the construction industry and the overall economy in Malaysia between 1970 and 2009. Qualitative study involved interviews with a purposive sample of 21 industrial participants. This study identified a 32-year long building cycle appears in 1975-2006. It is superimposed with three shorter construction business cycles in 1975-1987, 1987-1999 and 1999-2006. The correlations of Construction labour productivity (CLP) and GDP per capita are statistically significant for the 1975-2006 building cycle, 1987-1999 and 1999-2006 construction business cycles. It was not significant in 1975-1987 construction business cycles. The Construction Industry Surveys/Census over the period from 1996 to 2007 show that the average growth rate of total output per employee expanded but the added value per employee contracted which imply high cost of bought-in materials and services and inefficient usage of purchases. The construction labour productivity is peaked at 2004 although there is contraction of construction sector in 2004. The residential subsector performed relatively better than the other sub-sectors in most of the productivity indicators. Improvements are found in output per employee, value added per employee, labour competitiveness and capital investment but declines are recorded in value added content and capital productivity. The civil engineering construction is most productive in the labour productivity nevertheless relatively poorer in the capital productivity. The labour cost is more competitive in the larger size establishment. The added value per labour cost is higher in larger sized establishment attributed to efficient in utilization of capital. The interview with the industrial participant reveals that the productivity of the construction sector is influenced by the economic environment, the construction methods, contract arrangement, payment chain and regulatory policies. The fluctuations of construction demand have caused companies switched to defensive strategy during the economic downturn and to ensure short-term survival than to make a profit for the long-term survival and growth. It leads the company to take drastic measures to curb expenses, downsizing, employ contract employment, diversification and venture overseas market. There is no empirical evidence supports downsizing as a necessary step in a process of reviving productivity. The productivity does not correlate with size of firm. A relatively smaller and focused firm is more productive than the larger and diversified organisation. However diversified company experienced less fluctuation in both labour and capital productivity. In order to improve the productivity of the construction sector, it is necessary to remove the negatives and flaws from past practices. The recommended measures include long-term strategic planning and coordinated approaches of government agencies in planning of infrastructure development and to provide regulatory environments which encourage competition and facilitate productivity improvement.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The standard one-sector real business cycle model is unable to generate expectations-driven fluctuations. The addition of countercyclical mark-ups and modest investment adjustment costs offers an easy fix to this conundrum. The simulated model replicates the regular features of U.S. aggregate fluctuations.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The productivity of the construction industry has a significant effect on national economic growth. Gains from higher construction productivity flow through the economy, as all industries rely on construction to some extent as part of their business investment. Contractions and expansions of economic activity are common phenomena in an economy. Three construction cycles occurred between the years 1970 and 2011 in Malaysia. The relationships between construction productivity and economic development are examined by the partial correlation method to establish the underlying factors driving the change in construction productivity. Construction productivity is statistically significantly correlated with gross domestic product (GDP) per capita in a positive direction for the 1985–98 and 1998–2009 cycles, but not the 1970–85 cycle. Fluctuations in construction activities and the influx of foreign workers underlie the changes of construction productivity in the 1985–98 cycle. There was less fluctuation in construction activities in the 1998–2009 cycle, with changes being mainly due to the fiscal stimulation policies of the government in attempting to stabilize the economy. The intensive construction of mega-projects resulted in resource constraints and cost pressures during the 1980s and 1990s. A better management of the ‘boom-bust’ nature of the construction business cycle is required to maintain the capability and capacity of the industry.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PURPOSE: Female athletes, in response to intensive training, competition stress and a lean, athletic physique, are at increased risk of altered hypothalamic-pituitary ovarian (HPO) axis function associated with menstrual cycle disturbance and reduced secretion of the ovarian hormones estrogen and progesterone. Because there is evidence suggesting possible detrimental effects on skeletal health associated with deficiencies in these hormones, a suitable means to asses ovarian hormone concentrations in at risk athletes is needed. The aim of this study was to evaluate a simple, economical means to monitor the ovarian hormone production in athletes, in the setting of intensive training. METHODS: Subjects comprised 14 adolescent rowers, 12 lightweight rowers, and two groups of 10 matched control subjects. Ovarian function was monitored during the competition season by estimation of urinary excretion of estrone glucuronide (E1G) and pregnanediol glucuronide (PdG), enabling the menstrual cycles to be classified as ovulatory or anovulatory. RESULTS: Results indicated 35% and 75% of schoolgirl and lightweight rowers had anovulatory menstrual cycles, respectively. These findings were highlighted by significantly lower excretion of E1G and PdG during phases of intensive training in both the lightweight and schoolgirl rowers, compared with the control subjects. CONCLUSION: It was concluded that the urinary E1G and PdG assays were an effective means to assess the influence of intense training on ovarian hormone concentrations in at risk athletes. It is recommended that this technique be applied more widely as a means of early detection of athletes with low estrogen and progesterone levels, in an attempt to avoid detrimental influences on skeletal health.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Sustainable societal and economic development relies on novel nanotechnologies that offer maximum efficiency at minimal environmental cost. Yet, it is very challenging to apply green chemistry approaches across the entire life cycle of nanotech products, from design and nanomaterial synthesis to utilization and disposal. Recently, novel, efficient methods based on nonequilibrium reactive plasma chemistries that minimize the process steps and dramatically reduce the use of expensive and hazardous reagents have been applied to low-cost natural and waste sources to produce value-added nanomaterials with a wide range of applications. This review discusses the distinctive effects of nonequilibrium reactive chemistries and how these effects can aid and advance the integration of sustainable chemistry into each stage of nanotech product life. Examples of the use of enabling plasma-based technologies in sustainable production and degradation of nanotech products are discussed—from selection of precursors derived from natural resources and their conversion into functional building units, to methods for green synthesis of useful naturally degradable carbon-based nanomaterials, to device operation and eventual disintegration into naturally degradable yet potentially reusable byproducts.