6 resultados para job order production
em Nottingham eTheses
Resumo:
Providing high levels of product variety and product customization is challenging for many companies. This paper presents a new classification of production and order fulfillment approaches available to manufacturing companies that offer high variety and/or product customization. Six categories of approaches are identified and described. An important emerging approach - open pipeline planning – is highlighted for high variety manufacturing environments. It allows a customer order to be fulfilled from anywhere in the system, enabling greater responsiveness in Build-to-Forecast systems. The links between the open pipeline approach, decoupling concepts and postponement strategies are discussed and the relevance of the approach to the volume automotive sector is highlighted. Results from a simulation study are presented illustrating the potential benefits when products can be reconfigured in an open pipeline system. The application of open pipeline concepts to different manufacturing domains is discussed and the operating characteristics of most relevance are highlighted. In addition to the automotive, sectors such as machinery and instrumentation, computer servers, telecommunications and electronic equipment may benefit from an open pipeline planning approach. When properly designed these systems can significantly enhance order fulfillment performance.
Resumo:
Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead time exceeds their customers' tolerable waiting times, and for whom the holding of partly-finished stocks at a fixed decoupling point is unattractive or unworkable. This paper describes and develops the operational concepts that underpin VBTO, in particular the concepts of reconfiguration flexibility and customer aversion to waiting. Reconfiguration is the process of changing a product's specification at any point along the order fulfilment pipeline. The extent to which an order fulfilment system is flexible or inflexible reveals itself in the reconfiguration cost curve, of which there are four basic types. The operational features of the generic VBTO system are described and simulation is used to study its behaviour and performance. The concepts of reconfiguration flexibility and floating decoupling point are introduced and discussed.
Resumo:
Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model.
Resumo:
Previous research has shown that artificial immune systems can be used to produce robust schedules in a manufacturing environment. The main goal is to develop building blocks (antibodies) of partial schedules that can be used to construct backup solutions (antigens) when disturbances occur during production. The building blocks are created based upon underpinning ideas from artificial immune systems and evolved using a genetic algorithm (Phase I). Each partial schedule (antibody) is assigned a fitness value and the best partial schedules are selected to be converted into complete schedules (antigens). We further investigate whether simulated annealing and the great deluge algorithm can improve the results when hybridised with our artificial immune system (Phase II). We use ten fixed solutions as our target and measure how well we cover these specific scenarios.
Resumo:
Mass Customization (MC) is not a mature business strategy and hence it is not clear that a single or small group of operational models are dominating. Companies tend to approach MC from either a mass production or a customization origin and this in itself gives reason to believe that several operational models will be observable. This paper reviews actual and theoretical fulfilment systems that enterprises could apply when offering a pre-engineered catalogue of customizable products and options. Issues considered are: How product flows are structured in relation to processes, inventories and decoupling point(s); - Characteristics of the OF process that inhibit or facilitate fulfilment; - The logic of how products are allocated to customers; - Customer factors that influence OF process design and operation. Diversity in the order fulfilment structures is expected and is found in the literature. The review has identified four structural forms that have been used in a Catalogue MC context: - fulfilment from stock; - fulfilment from a single fixed decoupling point; - fulfilment from one of several fixed decoupling points; - fulfilment from several locations, with floating decoupling points. From the review it is apparent that producers are being imaginative in coping with the demands of high variety, high volume, customization and short lead times. These demands have encouraged the relationship between product, process and customer to be re-examined. Not only has this strengthened interest in commonality and postponement, but, as is reported in the paper, has led to the re-engineering of the order fulfilment process to create models with multiple fixed decoupling points and the floating decoupling point system
Resumo:
With global markets and global competition, pressures are placed on manufacturing organizations to compress order fulfillment times, meet delivery commitments consistently and also maintain efficiency in operations to address cost issues. This chapter argues for a process perspective on planning, scheduling and control that integrates organizational planning structures, information systems as well as human decision makers. The chapter begins with a reconsideration of the gap between theory and practice, in particular for classical scheduling theory and hierarchical production planning and control. A number of the key studies of industrial practice are then described and their implications noted. A recent model of scheduling practice derived from a detailed study of real businesses is described. Socio-technical concepts are then introduced and their implications for the design and management of planning, scheduling and control systems are discussed. The implications of adopting a process perspective are noted along with insights from knowledge management. An overview is presented of a methodology for the (re-)design of planning, scheduling and control systems that integrates organizational, system and human perspectives. The most important messages from the chapter are then summarized.