2 resultados para international virtual networking capabilities

em Nottingham eTheses


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Background and Purpose - Stroke has global importance and it causes an increasing amount of human suffering and economic burden, but its management is far from optimal. The unsuccessful outcome of several research programs highlights the need for reliable data on which to plan future clinical trials. The Virtual International Stroke Trials Archive aims to aid the planning of clinical trials by collating and providing access to a rich resource of patient data to perform exploratory analyses. Methods - Data were contributed by the principal investigators of numerous trials from the past 16 years. These data have been centrally collated and are available for anonymized analysis and hypothesis testing. Results - ”Currently, the Virtual International Stroke Trials Archive contains 21 trials. There are data on 15 000 patients with both ischemic and hemorrhagic stroke. Ages range between 18 and 103 years, with a mean age of 6912 years. Outcome measures include the Barthel Index, Scandinavian Stroke Scale, National Institutes of Health Stroke Scale, Orgogozo Scale, and modified Rankin Scale. Medical history and onset-to-treatment time are readily available, and computed tomography lesion data are available for selected trials. Conclusions - This resource has the potential to influence clinical trial design and implementation through data analyses that inform planning. (Stroke. 2007;38:1905-1910.)

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model.