4 resultados para first order transition system

em Nottingham eTheses


Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper reports a case study in the use of proof planning in the context of higher order syntax. Rippling is a heuristic for guiding rewriting steps in induction that has been used successfully in proof planning inductive proofs using first order representations. Ordinal arithmetic provides a natural set of higher order examples on which transfinite induction may be attempted using rippling. Previously Boyer-Moore style automation could not be applied to such domains. We demonstrate that a higher-order extension of the rippling heuristic is sufficient to plan such proofs automatically. Accordingly, ordinal arithmetic has been implemented in lambda-clam, a higher order proof planning system for induction, and standard undergraduate text book problems have been successfully planned. We show the synthesis of a fixpoint for normal ordinal functions which demonstrates how our automation could be extended to produce more interesting results than the textbook examples tried so far.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead time exceeds their customers' tolerable waiting times, and for whom the holding of partly-finished stocks at a fixed decoupling point is unattractive or unworkable. This paper describes and develops the operational concepts that underpin VBTO, in particular the concepts of reconfiguration flexibility and customer aversion to waiting. Reconfiguration is the process of changing a product's specification at any point along the order fulfilment pipeline. The extent to which an order fulfilment system is flexible or inflexible reveals itself in the reconfiguration cost curve, of which there are four basic types. The operational features of the generic VBTO system are described and simulation is used to study its behaviour and performance. The concepts of reconfiguration flexibility and floating decoupling point are introduced and discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model.