6 resultados para Pipeline

em Nottingham eTheses


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Automotive producers are aiming to make their order fulfilment processes more flexible. Opening the pipeline of planned products for dynamic allocation to dealers/ customers is a significant step to be more flexible but the behaviour of such Virtual-Build-To-Order systems are complex to predict and their performance varies significantly as product variety levels change. This study investigates the potential for intelligent control of the pipeline feed, taking into account the current status of inventory (level and mix) and of the volume and mix of unsold products in the planning pipeline, as well as the demand profile. Five ‘intelligent’ methods for selecting the next product to be planned into the production pipeline are analysed using a discrete event simulation model and compared to the unintelligent random feed. The methods are tested under two conditions, firstly when customers must be fulfilled with the exact product they request, and secondly when customers trade-off a shorter waiting time for compromise in specification. The two forms of customer behaviour have a substantial impact on the performance of the methods and there are also significant differences between the methods themselves. When the producer has an accurate model of customer demand, methods that attempt to harmonise the mix in the system to the demand distribution are superior.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Automotive producers are adopting multi-modal fulfillment models in which customers can be fulfilled by products from stock, by allocating as yet unmade products that are in the planning pipeline, or by building a product to order. This study explores how fulfillment is sensitive to several parameters of the system and how they interact with different methods for sequencing products into the production plan.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead time exceeds their customers' tolerable waiting times, and for whom the holding of partly-finished stocks at a fixed decoupling point is unattractive or unworkable. This paper describes and develops the operational concepts that underpin VBTO, in particular the concepts of reconfiguration flexibility and customer aversion to waiting. Reconfiguration is the process of changing a product's specification at any point along the order fulfilment pipeline. The extent to which an order fulfilment system is flexible or inflexible reveals itself in the reconfiguration cost curve, of which there are four basic types. The operational features of the generic VBTO system are described and simulation is used to study its behaviour and performance. The concepts of reconfiguration flexibility and floating decoupling point are introduced and discussed.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Optimisation of real world Variable Data printing (VDP) documents is a dicult problem because the interdependencies between layout functions may drastically reduce the number of invariant blocks that can be factored out for pre-rasterisation. This paper examines how speculative evaluation at an early stage in a document-preparation pipeline, provides a generic and effective method of optimising VDP documents that contain such interdependencies. Speculative evaluation will be at its most effective in speeding up print runs if sets of layout invariances can either be discovered automatically, or designed into the document at an early stage. In either case the expertise of the layout designer needs to be supplemented by expertise in exploiting potential invariances and also in predicting the effects of speculative evaluation on the caches used at various stages in the print production pipeline.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Providing high levels of product variety and product customization is challenging for many companies. This paper presents a new classification of production and order fulfillment approaches available to manufacturing companies that offer high variety and/or product customization. Six categories of approaches are identified and described. An important emerging approach - open pipeline planning – is highlighted for high variety manufacturing environments. It allows a customer order to be fulfilled from anywhere in the system, enabling greater responsiveness in Build-to-Forecast systems. The links between the open pipeline approach, decoupling concepts and postponement strategies are discussed and the relevance of the approach to the volume automotive sector is highlighted. Results from a simulation study are presented illustrating the potential benefits when products can be reconfigured in an open pipeline system. The application of open pipeline concepts to different manufacturing domains is discussed and the operating characteristics of most relevance are highlighted. In addition to the automotive, sectors such as machinery and instrumentation, computer servers, telecommunications and electronic equipment may benefit from an open pipeline planning approach. When properly designed these systems can significantly enhance order fulfillment performance.