2 resultados para Metal-mechanic production sector

em Nottingham eTheses


Relevância:

30.00% 30.00%

Publicador:

Resumo:

Automotive producers are aiming to make their order fulfilment processes more flexible. Opening the pipeline of planned products for dynamic allocation to dealers/ customers is a significant step to be more flexible but the behaviour of such Virtual-Build-To-Order systems are complex to predict and their performance varies significantly as product variety levels change. This study investigates the potential for intelligent control of the pipeline feed, taking into account the current status of inventory (level and mix) and of the volume and mix of unsold products in the planning pipeline, as well as the demand profile. Five ‘intelligent’ methods for selecting the next product to be planned into the production pipeline are analysed using a discrete event simulation model and compared to the unintelligent random feed. The methods are tested under two conditions, firstly when customers must be fulfilled with the exact product they request, and secondly when customers trade-off a shorter waiting time for compromise in specification. The two forms of customer behaviour have a substantial impact on the performance of the methods and there are also significant differences between the methods themselves. When the producer has an accurate model of customer demand, methods that attempt to harmonise the mix in the system to the demand distribution are superior.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Providing high levels of product variety and product customization is challenging for many companies. This paper presents a new classification of production and order fulfillment approaches available to manufacturing companies that offer high variety and/or product customization. Six categories of approaches are identified and described. An important emerging approach - open pipeline planning – is highlighted for high variety manufacturing environments. It allows a customer order to be fulfilled from anywhere in the system, enabling greater responsiveness in Build-to-Forecast systems. The links between the open pipeline approach, decoupling concepts and postponement strategies are discussed and the relevance of the approach to the volume automotive sector is highlighted. Results from a simulation study are presented illustrating the potential benefits when products can be reconfigured in an open pipeline system. The application of open pipeline concepts to different manufacturing domains is discussed and the operating characteristics of most relevance are highlighted. In addition to the automotive, sectors such as machinery and instrumentation, computer servers, telecommunications and electronic equipment may benefit from an open pipeline planning approach. When properly designed these systems can significantly enhance order fulfillment performance.