4 resultados para Feller pig. Instrumented pigs. Pipeline engineering. Pipeline inspection

em Nottingham eTheses


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Automotive producers are aiming to make their order fulfilment processes more flexible. Opening the pipeline of planned products for dynamic allocation to dealers/ customers is a significant step to be more flexible but the behaviour of such Virtual-Build-To-Order systems are complex to predict and their performance varies significantly as product variety levels change. This study investigates the potential for intelligent control of the pipeline feed, taking into account the current status of inventory (level and mix) and of the volume and mix of unsold products in the planning pipeline, as well as the demand profile. Five ‘intelligent’ methods for selecting the next product to be planned into the production pipeline are analysed using a discrete event simulation model and compared to the unintelligent random feed. The methods are tested under two conditions, firstly when customers must be fulfilled with the exact product they request, and secondly when customers trade-off a shorter waiting time for compromise in specification. The two forms of customer behaviour have a substantial impact on the performance of the methods and there are also significant differences between the methods themselves. When the producer has an accurate model of customer demand, methods that attempt to harmonise the mix in the system to the demand distribution are superior.

Relevância:

40.00% 40.00%

Publicador:

Resumo:

Automotive producers are adopting multi-modal fulfillment models in which customers can be fulfilled by products from stock, by allocating as yet unmade products that are in the planning pipeline, or by building a product to order. This study explores how fulfillment is sensitive to several parameters of the system and how they interact with different methods for sequencing products into the production plan.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead time exceeds their customers' tolerable waiting times, and for whom the holding of partly-finished stocks at a fixed decoupling point is unattractive or unworkable. This paper describes and develops the operational concepts that underpin VBTO, in particular the concepts of reconfiguration flexibility and customer aversion to waiting. Reconfiguration is the process of changing a product's specification at any point along the order fulfilment pipeline. The extent to which an order fulfilment system is flexible or inflexible reveals itself in the reconfiguration cost curve, of which there are four basic types. The operational features of the generic VBTO system are described and simulation is used to study its behaviour and performance. The concepts of reconfiguration flexibility and floating decoupling point are introduced and discussed.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Optimisation of real world Variable Data printing (VDP) documents is a dicult problem because the interdependencies between layout functions may drastically reduce the number of invariant blocks that can be factored out for pre-rasterisation. This paper examines how speculative evaluation at an early stage in a document-preparation pipeline, provides a generic and effective method of optimising VDP documents that contain such interdependencies. Speculative evaluation will be at its most effective in speeding up print runs if sets of layout invariances can either be discovered automatically, or designed into the document at an early stage. In either case the expertise of the layout designer needs to be supplemented by expertise in exploiting potential invariances and also in predicting the effects of speculative evaluation on the caches used at various stages in the print production pipeline.