5 resultados para Customer order decoupling point

em Nottingham eTheses


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Virtual-build-to-order (VBTO) is a form of order fulfilment system in which the producer has the ability to search across the entire pipeline of finished stock, products in production and those in the production plan, in order to find the best product for a customer. It is a system design that is attractive to Mass Customizers, such as those in the automotive sector, whose manufacturing lead time exceeds their customers' tolerable waiting times, and for whom the holding of partly-finished stocks at a fixed decoupling point is unattractive or unworkable. This paper describes and develops the operational concepts that underpin VBTO, in particular the concepts of reconfiguration flexibility and customer aversion to waiting. Reconfiguration is the process of changing a product's specification at any point along the order fulfilment pipeline. The extent to which an order fulfilment system is flexible or inflexible reveals itself in the reconfiguration cost curve, of which there are four basic types. The operational features of the generic VBTO system are described and simulation is used to study its behaviour and performance. The concepts of reconfiguration flexibility and floating decoupling point are introduced and discussed.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Mass Customization (MC) is not a mature business strategy and hence it is not clear that a single or small group of operational models are dominating. Companies tend to approach MC from either a mass production or a customization origin and this in itself gives reason to believe that several operational models will be observable. This paper reviews actual and theoretical fulfilment systems that enterprises could apply when offering a pre-engineered catalogue of customizable products and options. Issues considered are: How product flows are structured in relation to processes, inventories and decoupling point(s); - Characteristics of the OF process that inhibit or facilitate fulfilment; - The logic of how products are allocated to customers; - Customer factors that influence OF process design and operation. Diversity in the order fulfilment structures is expected and is found in the literature. The review has identified four structural forms that have been used in a Catalogue MC context: - fulfilment from stock; - fulfilment from a single fixed decoupling point; - fulfilment from one of several fixed decoupling points; - fulfilment from several locations, with floating decoupling points. From the review it is apparent that producers are being imaginative in coping with the demands of high variety, high volume, customization and short lead times. These demands have encouraged the relationship between product, process and customer to be re-examined. Not only has this strengthened interest in commonality and postponement, but, as is reported in the paper, has led to the re-engineering of the order fulfilment process to create models with multiple fixed decoupling points and the floating decoupling point system

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Providing high levels of product variety and product customization is challenging for many companies. This paper presents a new classification of production and order fulfillment approaches available to manufacturing companies that offer high variety and/or product customization. Six categories of approaches are identified and described. An important emerging approach - open pipeline planning – is highlighted for high variety manufacturing environments. It allows a customer order to be fulfilled from anywhere in the system, enabling greater responsiveness in Build-to-Forecast systems. The links between the open pipeline approach, decoupling concepts and postponement strategies are discussed and the relevance of the approach to the volume automotive sector is highlighted. Results from a simulation study are presented illustrating the potential benefits when products can be reconfigured in an open pipeline system. The application of open pipeline concepts to different manufacturing domains is discussed and the operating characteristics of most relevance are highlighted. In addition to the automotive, sectors such as machinery and instrumentation, computer servers, telecommunications and electronic equipment may benefit from an open pipeline planning approach. When properly designed these systems can significantly enhance order fulfillment performance.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Virtual-Build-to-Order (VBTO) is an emerging order fulfilment system within the automotive sector that is intended to improve fulfilment performance by taking advantage of integrated information systems. The primary innovation in VBTO systems is the ability to make available all unsold products that are in the production pipeline to all customers. In a conventional system the pipeline is inaccessible and a customer can be fulfilled by a product from stock or having a product Built-to-Order (BTO), whereas in a VBTO system a customer can be fulfilled by a product from stock, by being allocated a product in the pipeline, or by a build-to-order product. Simulation is used to investigate and profile the fundamental behaviour of the basic VBTO system and to compare it to a Conventional system. A predictive relationship is identified, between the proportions of customers fulfilled through each mechanism and the ratio of product variety / pipeline length. The simulations reveal that a VBTO system exhibits inherent behaviour that alters the stock mix and levels, leading to stock levels being higher than in an equivalent conventional system at certain variety / pipeline ratios. The results have implications for the design and management of order fulfilment systems in sectors such as automotive where VBTO is a viable operational model.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

We shall consider the weak formulation of a linear elliptic model problem with discontinuous Dirichlet boundary conditions. Since such problems are typically not well-defined in the standard H^1-H^1 setting, we will introduce a suitable saddle point formulation in terms of weighted Sobolev spaces. Furthermore, we will discuss the numerical solution of such problems. Specifically, we employ an hp-discontinuous Galerkin method and derive an L^2-norm a posteriori error estimate. Numerical experiments demonstrate the effectiveness of the proposed error indicator in both the h- and hp-version setting. Indeed, in the latter case exponential convergence of the error is attained as the mesh is adaptively refined.