5 resultados para wind tunnel

em Universidade do Minho


Relevância:

100.00% 100.00%

Publicador:

Resumo:

Wind tunnel tests are a reliable tool to determine the effect of natural ventilation on buildings. This paper presents results of wind tunnel tests conducted to evaluate the influence of ventilation modules positioning on a façade system. Modules positioning was modified, resulting in different façade configurations. The tests were carried out with the use of a model, varying the position of the ventilation modules in the façade configuration. The cases tested were six ventilation modules positioned below the window-sill (ventilated window-sill), and three ventilation modules positioned above and below the façade. The façade system proposed was movable and interchangeable so that the same basic model could be used to test the possibilities for ventilation. Wind speed measurements were taken inside and outside the model for the different façades configurations to evaluate the best performance in relation to natural ventilation. Singleâ sided and Cross ventilation were considered for wind speed measurements. Results show the use of six ventilation modules positioned below the window-sill, forming "a ventilated window-sill" is the best solution in terms of natural ventilation.

Relevância:

60.00% 60.00%

Publicador:

Resumo:

Nowadays natural ventilation has gained prominence because its correct use can reduce energy consumption for cooling systems and improve thermal comfort among users. In this paper, we report on the modelling initiative, based on the wind tunnel tests that were carried out for the determination of the influence of natural ventilation in buildings. Indeed, the renewal of air in a closed environment without using an air conditioning system with mechanical elements can lead to energy savings and, in addition, provide air quality.The wind tunnel tests were carried out by varying the positioning of six ventilation modules in the façade system configuration. The modules were positioned below the window-sill (ventilated window-sill) as well as separately above and below the façade. The wind speed measurements were taken inside and outside the model for the different façades configurations to evaluate the best performance in relation to natural ventilation. The results supported the positioning of the six ventilation modules below the window-sill, forming a â ventilated window-sillâ as the most effective natural ventilation solution.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The monitoring data collected during tunnel excavation can be used in inverse analysis procedures in order to identify more realistic geomechanical parameters that can increase the knowledge about the interested formations. These more realistic parameters can be used in real time to adapt the project to the real structure in situ behaviour. However, monitoring plans are normally designed for safety assessment and not especially for the purpose of inverse analysis. In fact, there is a lack of knowledge about what types and quantity of measurements are needed to succeed in identifying the parameters of interest. Also, the optimisation algorithm chosen for the identification procedure may be important for this matter. In this work, this problem is addressed using a theoretical case with which a thorough parametric study was carried out using two optimisation algorithms based on different calculation paradigms, namely a conventional gradient-based algorithm and an evolution strategy algorithm. Calculations were carried for different sets of parameters to identify several combinations of types and amount of monitoring data. The results clearly show the high importance of the available monitoring data and the chosen algorithm for the success rate of the inverse analysis process.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This paper deals with the problem of estimation maintenance costs for the case of the pitch controls system of wind farms turbines. Previous investigations have estimated these costs as (traditional) “crisp” values, simply ignoring the uncertainty nature of data and information available. This paper purposes an extended version of the estimation model by making use of the Fuzzy Set Theory. The results alert decision-makers to consequent uncertainty of the estimations along with their overall level, thus improving the information given to the mainte-nance support system.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

A new integrated mathematical model for the simulation of an offshore wind system having a rectifier input voltage malfunction at one phase is presented in this paper. The mathematical model considers an offshore variable-speed wind turbine on a floating platform, equipped with a permanent magnet synchronous generator using full-power three-level converter to inject energy into the electric network, through a high voltage direct current transmission submarine cable. The model for the drive train is a discrete three mass, incorporating the dynamic of the moving surface. A case study is presented to access conclusion about the malfunction.