5 resultados para university scheduling

em Universidade do Minho


Relevância:

20.00% 20.00%

Publicador:

Resumo:

This chapter aims at developing a taxonomic framework to classify the studies on the flexible job shop scheduling problem (FJSP). The FJSP is a generalization of the classical job shop scheduling problem (JSP), which is one of the oldest NP-hard problems. Although various solution methodologies have been developed to obtain good solutions in reasonable time for FSJPs with different objective functions and constraints, no study which systematically reviews the FJSP literature has been encountered. In the proposed taxonomy, the type of study, type of problem, objective, methodology, data characteristics, and benchmarking are the main categories. In order to verify the proposed taxonomy, a variety of papers from the literature are classified. Using this classification, several inferences are drawn and gaps in the FJSP literature are specified. With the proposed taxonomy, the aim is to develop a framework for a broad view of the FJSP literature and construct a basis for future studies.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

PhD thesis in Educational Sciences (specialization in Politics of Education).

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Purpose – The purpose of this paper is to develop a subjective multidimensional measure of early career success during university-to-work transition. Design/methodology/approach – The construct of university-to-work success (UWS) was defined in terms of intrinsic and extrinsic career outcomes, and a three-stage study was conducted to create a new scale. Findings – A preliminary set of items was developed and tested by judges. Results showed the items had good content validity. Factor analyses indicated a four-factor structure and a second-order model with subscales to assess: career insertion and satisfaction, confidence in career future, income and financial independence, and adaptation to work. Third, the authors sought to confirm the hypothesized model examining the comparative fit of the scale and two alternative models. Results showed that fits for both the first- and second-order models were acceptable. Research limitations/implications – The proposed model has sound psychometric qualities, although the validated version of the scale was not able to incorporate all constructs envisaged by the initial theoretical model. Results indicated some direction for further refinement. Practical implications – The scale could be used as a tool for self-assessment or as an outcome measure to assess the efficacy of university-to-work programs in applied settings. Originality/value – This study provides a useful single measure to assess early career success during the university-to-work transition, and might facilitate testing of causal models which could help identify factors relevant for successful transition.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

The authors propose a mathematical model to minimize the project total cost where there are multiple resources constrained by maximum availability. They assume the resources as renewable and the activities can use any subset of resources requiring any quantity from a limited real interval. The stochastic nature is inferred by means of a stochastic work content defined per resource within an activity and following a known distribution and the total cost is the sum of the resource allocation cost with the tardiness cost or earliness bonus in case the project finishes after or before the due date, respectively. The model was computationally implemented relying upon an interchange of two global optimization metaheuristics – the electromagnetism-like mechanism and the evolutionary strategies. Two experiments were conducted testing the implementation to projects with single and multiple resources, and with or without maximum availability constraints. The set of collected results shows good behavior in general and provide a tool to further assist project manager decision making in the planning phase.