4 resultados para practice methods

em Universidade do Minho


Relevância:

70.00% 70.00%

Publicador:

Resumo:

OBJECTIVES: To describe the process of translation and linguistic and cultural validation of the Evidence Based Practice Questionnaire for the Portuguese context: Questionário de Eficácia Clínica e Prática Baseada em Evidências (QECPBE). METHOD: A methodological and cross-sectional study was developed. The translation and back translation was performed according to traditional standards. Principal Components Analysis with orthogonal rotation according to the Varimax method was used to verify the QECPBE's psychometric characteristics, followed by confirmatory factor analysis. Internal consistency was determined by Cronbach's alpha. Data were collected between December 2013 and February 2014. RESULTS: 358 nurses delivering care in a hospital facility in North of Portugal participated in the study. QECPBE contains 20 items and three subscales: Practice (α=0.74); Attitudes (α=0.75); Knowledge/Skills and Competencies (α=0.95), presenting an overall internal consistency of α=0.74. The tested model explained 55.86% of the variance and presented good fit: χ2(167)=520.009; p = 0.0001; χ2df=3.114; CFI=0.908; GFI=0.865; PCFI=0.798; PGFI=0.678; RMSEA=0.077 (CI90%=0.07-0.08). CONCLUSION: confirmatory factor analysis revealed the questionnaire is valid and appropriate to be used in the studied context.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PhD Thesis in Bioengineering

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Endoscopic retrograde cholangiopancreatography for suspected choledocholithiasis: From guidelines to clinical practice.