6 resultados para minimum context management

em Universidade do Minho


Relevância:

40.00% 40.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

This article compiles the main topics addressed by management systems (MSs) literature concerningMSs integration by performing a systematic literature review. In this paper, it is intended to present themain limitations of non-integratedmanagement systems (IMSs), the main motivations driving an IMS implementation, the major resistances faced, the most common resultant benefits, the suitable guidelines and standards and the critical success factors. In addition, this paper addresses the issues concerning integration strategies and models, the integration levels or degrees achieved by an IMS and the audit function in an integrated context. The motivations that drive companies to integrate their management subsystems, the obstacles faced and the benefits collected may have internal or external origins. The publishing of standards guiding companies on how to integrate their management subsystems has been done mainly at a national level. There are several models that could be used in order to support companies in their management subsystems integration processes, and a sequential or an all-in strategy may be adopted. Four audit typologies can be distinguished, and the adoption of any of these typologies should consider resource availability and audit team know-how, among other features.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PhD thesis in Educational Sciences (specialization in Politics of Education).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia Civil

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The evolution of the construction caused a need to use more effective equipments, capable of meeting the increasingly demanding deadlines for the completion of works. In this context, the safety and efficiency of equipment have become key aspects in order to optimize the execution time of the works, as well as reducing labor costs and loss of materials. With the evolution of construction and construction processes, cranes have come to represent a signal of the construction of buildings, revealing to be, in most of the cases, the main equipment of construction sites. Currently, some engineers revels some apprehension regarding the use and handling of cranes which is natural and acceptable, since an equipment failure can lead to serious or fatal accidents. The factors affecting safety management of the cranes in construction sites were investigated, identified, classified and evaluated according to their degree of importance, through interviews with representatives of the general contractors of a set of selected construction sites.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Tese de Doutoramento em Engenharia Biomédica.