4 resultados para intravenous gamma globulin production

em Universidade do Minho


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Marine ecosystem can be considered a rather exploited source of natural substances with enormous bioactive potential. In Mexico macro-algae study remain forgotten for research and economic purposes besides the high amount of this resource along the west and east coast. For that reason the Bioferinery Group of the Autonomous University of Coahuila, have been studying the biorefinery concept in order to recover high value byproducts of Mexican brown macro-algae including polysaccharides and enzymes to be applied in food, pharmaceutical and energy industry. Brown macroalgae are an important source of fucoidan, alginate and laminarin which comprise a complex group of macromolecules with a wide range of important biological properties such as anticoagulant, antioxidant, antitumoral and antiviral and also as rich source of fermentable sugars for enzymes production. Additionally, specific enzymes able to degrade algae matrix (fucosidases, sulfatases, aliginases, etc) are important tools to establish structural characteristics and biological functions of these polysaccharides. The aims of the present work were the integral study of bioprocess for macroalgae biomass exploitation by the use of green technologies as hydrothermal extraction and solid state fermentation in order to produce polysaccharides and enzymes (fucoidan and fucoidan hydrolytic enzymes). This work comprises the use of the different bioprocess phases in order to produce high value products with lower time and wastes.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Corrosion of the steel reinforced concrete elements is one of the common pathologies that limits the long-term performance of urban infrastructures. This problem causes the loss of structural serviceability by decreasing the concrete-steel bond strength and reducing the cross section of the reinforcements. The present study introduces a new system for developing free-corrosion resistance prefabricated manhole covers for applications in the aggressive environments, i.e. wastewater collector systems, sewer systems, stormwater systems, etc. Fibre reinforced cement composites were applied in this system in order to suppress the corrodible steel mesh and maintain the structural ductility as well. Application of fibre reinforced polymer (FRP) system is adopted as the additional solution for increasing the load carrying capacity of these elements without concerns about corrosion. The effectiveness of the applied strategy in developing the manhole covers in terms of load carrying capacity and failure mode is evaluated in this research. Furthermore, this paper discusses a FEM-based simulation, aiming to address the possibility of calibrating the constitutive model parameters related to fracture modes I and II.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

BACKGROUND: Lean Production Systems (LPS) have become very popular among manufacturing industries, services and large commercial areas. A LPS must develop and consider a set of work features to bring compatibility with workplace ergonomics, namely at a muscular, cognitive and emotional demands level. OBJECTIVE: Identify the most relevant impacts of the adoption of LPS from the ergonomics point of view and summarizes some possible drawbacks for workplace ergonomics due to a flawed application of the LPS. The impacts identified are focused in four dimensions: work pace, intensity and load; worker motivation, satisfaction and stress; autonomy and participation; and health outcome. This paper also discusses the influence that the work organization model has on workplace ergonomics and on the waste elimination previewed by LPS. METHODS: Literature review focused LPS and its impact on occupational ergonomics conditions, as well as on the Health and Safety of workers. The main focus of this research is on LPS implementations in industrial environments and mainly in manufacturing industry workplaces. This is followed by a discussion including the authors’ experience (and previous research). RESULTS: From the reviewed literature it seems that there is no consensus on how Lean principles affect the workplace ergonomics since most authors found positive (advantages) and negative (disadvantages) impacts. CONCLUSIONS: The negative impacts or disadvantages of LPS implementations reviewed may result from the misunderstanding of the Lean principles. Possibly, they also happen due to partial Lean implementations (when only one or two tools were implemented) that may be effective in a specific work context but not suitable to all possible situations as the principles of LPS should not lead, by definition, to any of the reported drawbacks in terms of workplace ergonomics.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.