26 resultados para constraint satisfaction problem
em Universidade do Minho
Resumo:
Relatório de estágio de mestrado em Ensino de Informática
Resumo:
Autor proof
Resumo:
This work presents an improved model to solve the non-emergency patients transport (NEPT) service issues given the new rules recently established in Portugal. The model follows the same principle of the Team Orienteering Problem by selecting the patients to be included in the routes attending the maximum reduction in costs when compared with individual transportation. This model establishes the best sets of patients to be transported together. The model was implemented in AMPL and a compact formulation was solved using NEOS Server. A heuristic procedure based on iteratively solving Orienteering Problems is presented, and this heuristic provides good results in terms of accuracy and computation time. Euclidean instances as well as asymmetric real data gathered from Google maps were used, and the model has a promising performance mainly with asymmetric cost matrices.
Resumo:
This chapter aims at developing a taxonomic framework to classify the studies on the flexible job shop scheduling problem (FJSP). The FJSP is a generalization of the classical job shop scheduling problem (JSP), which is one of the oldest NP-hard problems. Although various solution methodologies have been developed to obtain good solutions in reasonable time for FSJPs with different objective functions and constraints, no study which systematically reviews the FJSP literature has been encountered. In the proposed taxonomy, the type of study, type of problem, objective, methodology, data characteristics, and benchmarking are the main categories. In order to verify the proposed taxonomy, a variety of papers from the literature are classified. Using this classification, several inferences are drawn and gaps in the FJSP literature are specified. With the proposed taxonomy, the aim is to develop a framework for a broad view of the FJSP literature and construct a basis for future studies.
Resumo:
The selective collection of municipal solid waste for recycling is a very complex and expensive process, where a major issue is to perform cost-efficient waste collection routes. Despite the abundance of commercially available software for fleet management, they often lack the capability to deal properly with sequencing problems and dynamic revision of plans and schedules during process execution. Our approach to achieve better solutions for the waste collection process is to model it as a vehicle routing problem, more specifically as a team orienteering problem where capacity constraints on the vehicles are considered, as well as time windows for the waste collection points and for the vehicles. The final model is called capacitated team orienteering problem with double time windows (CTOPdTW).We developed a genetic algorithm to solve routing problems in waste collection modelled as a CTOPdTW. The results achieved suggest possible reductions of logistic costs in selective waste collection.
Resumo:
To solve a health and safety problem on a waste treatment facility, different multicriteria decision methods were used, including the PROV Exponential decision method. Four alternatives and ten attributes were considered. We found a congruent solution, validated by the different methods. The AHP and the PROV Exponential decision method led us to the same options ordering, but the last method reinforced one of the options as being the best performing one, and detached the least performing option. Also, the ELECTRE I method results led to the same ordering which allowed to point the best solution with reasonable confidence. This paper demonstrates the potential of using multicriteria decision methods to support decision making on complex problems such as risk control and accidents prevention.
Resumo:
Attention to transferable skills is growing in higher education. Problem-based learning (PBL) is increasingly used in management education for its promising potential to, amongst others, promote transferable skills, including problem-solving, critical thinking and teamwork skills. However, this relationship is seldom assessed. In this study, I use structural equation modelling to examine the effectiveness of PBL, measured through students’ perceptions of satisfaction and skills development. Results show the development of transferable skills is explained by interaction with tutors and a host company, and defining teamwork rules. Satisfaction is explained by skills development, assessment issues, defining teamwork rules and understanding how organisations work. I draw conclusions and recommendations.
Resumo:
Companies from the motorcycles components branch are dealing with a dynamic environment, resulting from the introduction of new products and the increase of market demand. This dynamic environment requires frequent changes in production lines and requires flexibility in the processes, which can cause reductions in the level of quality and productivity. This paper presents a Lean Six Sigma improvement project performed in a production line of the company's machining sector, in order to eliminate losses that cause low productivity, affecting the fulfillment of the production plan and customer satisfaction. The use of Lean methodology following the DMAIC stages allowed analyzing the factors that influence the line productivity loss. The major problems and causes that contribute to a reduction on productivity and that were identified in this study are the lack of standardization in the setup activities and the excessive stoppages for adjustment of the processes that caused an increase of defects. Control charts, Pareto analysis and cause-and-effect diagrams were used to analyze the problem. On the improvement stage, the changes were based on the reconfiguration of the line layout as well as the modernization of the process. Overall, the project justified an investment in new equipment, the defective product units were reduced by 84% and an increase of 29% of line capacity was noticed.
Resumo:
Information technologies changed the way of how the health organizations work, contributing to their effectiveness, efficiency and sustainability. Hospital Information Systems (HIS) are emerging on all of health institutions, helping health professionals and patients. However, HIS are not always implemented and used in the best way, leading to low levels of benefits and acceptance by users of these systems. In order to mitigate this problem, it is essential to take measures able to ensure if the HIS and their interfaces are designed in a simple and interactive way. With this in mind, a study to measure the user satisfaction and their opinion was made. It was applied the Technology Acceptance Model (TAM) on a HIS implemented on various hospital centers (AIDA), being used the Pathologic Anatomy Service. The study identified weakness and strengths features of AIDA and it pointed some solutions to improve the medical record.
Resumo:
PhD thesis in Bioengineering
Resumo:
Tese de Doutoramento Programa Doutoral em Engenharia Electrónica e Computadores
Resumo:
Tese de Doutoramento em Engenharia Industrial e de Sistemas (PDEIS)
Resumo:
Shifting from chemical to biotechnological processes is one of the cornerstones of 21st century industry. The production of a great range of chemicals via biotechnological means is a key challenge on the way toward a bio-based economy. However, this shift is occurring at a pace slower than initially expected. The development of efficient cell factories that allow for competitive production yields is of paramount importance for this leap to happen. Constraint-based models of metabolism, together with in silico strain design algorithms, promise to reveal insights into the best genetic design strategies, a step further toward achieving that goal. In this work, a thorough analysis of the main in silico constraint-based strain design strategies and algorithms is presented, their application in real-world case studies is analyzed, and a path for the future is discussed.
Resumo:
The paper presents three empirical studies designed to extend the test of the construct validity of the Satisfaction With Life Scale (SWLS) among Portuguese students. In the first study, the responses of 461 elementary and secondary education students were submitted to a principal component analysis. A solution of one single factor was chosen, accounting for 55.7 % of the total variance, with Cronbach alpha coefficient and inter-item correlation above .70 and .20, respectively. The second study used a sample of 317 undergraduate students and registered a similar factor solution for SWLS (/pq = 0.99), which accounted for 65.6 % of the total variance (Cronbach alpha .89 and inter-item correlation above .20). A test–retest analysis registered coefficients of .70 (T2) and .77 (T3) and no significant statistically differences between T2, T3 and T1. The third study used a sample of 107 foster care youths from elementary and secondary education. Confirmatory factor analysis results indicate adequate fit indexes for the one-factor solution (v2/df = 2.70, GFI = .96, CFI = .96), which showed convergent validity, reliability and homogeneity. In conclusion, there is psychometric evidence for the one-factor structure of the SWLS in Portugal.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.