9 resultados para Research management

em Universidade do Minho


Relevância:

30.00% 30.00%

Publicador:

Resumo:

The occupational risks in the nanotechnology research laboratories are an important topic since a great number of researchers are involved in this area. The risk assessment performed by both qualitative and quantitative methods is a necessary step for the management of the occupational risks. Risk assessment could be performed by qualitative methods that gather consensus in the scientific community. It is also possible to use quantitative methods, based in different technics and metrics, as indicative exposure limits are been settled by several institutions. While performing the risk assessment, the information on the materials used is very important and, if it is not updated, it could create a bias in the assessment results. The exposure to TiO2 nanoparticles risk was assessed in a research laboratory using a quantitative exposure method and qualitative risk assessment methods. It was found the results from direct-reading Condensation Particle Counter (CPC) equipment and the CB Nanotool seem to be related and aligned, while the results obtained from the use of the Stoffenmanager Nano seem to indicate a higher risk level.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

A Zero waste management is believed to be one of methods to gain sustainability in urban areas. Take advantages of resources as enough as the needs and process it until the last part to be wasted is a contribution to take care the environment for the next generation. Reduce, reuse, and recycle are three simplesactivities which are until nowadays consideredas the back bone of zero waste. Jonggolgreen city is a new urban area in Indonesia with a 100 ha of surface area zoned as education tourism area. It is an independent area with pure natural resources of water, air, and land to be managed and protected. It is planned as green city through zero waste management since2013. In this preliminary period, a monitoring tool is being prepared by applying a Life Cycle Analysis (LCA) for urban areas [1]. This paper will present an explanatory assessment ofthe zero waste management for Jonggolgreen city. The existing situation will be examined through LCA and afterwards,the new program and the proposed green design to gain the next level of zero waste will be discussed. The purpose is to track the persistence of the commitment and the perception of the necessary innovationsin order to achieve the ideal behavior level of LCA.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Peer-to-Peer (P2P) is nowadays a widely used paradigm underpinning the deployment of several Internet services and applications. However, the management of P2P traffic aggregates is not an easy task for Internet Service Providers (ISPs). In this perspective, and considering an expectable proliferation in the use of such ap- plications, future networks require the development of smart mechanisms fostering an easier coexistence between P2P applications and ISP infrastructures. This paper aims to contribute for such research efforts presenting a framework incorporating useful mechanisms to be activated by network administrators, being also able to operate as an automated management tool dealing with P2P traffic aggregates.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

PhD thesis in Educational Sciences (specialization in Politics of Education).

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The Prognostic Health Management (PHM) has been asserting itself as the most promising methodology to enhance the effective reliability and availability of a product or system during its life-cycle conditions by detecting current and approaching failures, thus, providing mitigation of the system risks with reduced logistics and support costs. However, PHM is at an early stage of development, it also expresses some concerns about possible shortcomings of its methods, tools, metrics and standardization. These factors have been severely restricting the applicability of PHM and its adoption by the industry. This paper presents a comprehensive literature review about the PHM main general weaknesses. Exploring the research opportunities present in some recent publications, are discussed and outlined the general guide-lines for finding the answer to these issues.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.

Relevância:

30.00% 30.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação

Relevância:

30.00% 30.00%

Publicador:

Resumo:

The selection of spawning habitat of a population of Octopus vulgaris that is subject to a small-scale exploitation was studied in the Cíes Islands within the National Park of the Atlantic Islands of Galicia (NW Spain). The technique used was visual censuses by scuba diving. We conducted 93 visual censuses from April 2012 to April 2014. The total swept area was 123.69 ha. Habitat features (season, depth, zone, bottom temperature, swept area, bottom substrate type, and creels fishing impact) were evaluated as predictors of the presence/absence of spawning dens using GAM models. O. vulgaris has a noteworthy preference for spawning in areas with hard bottom substrate and moderate depth (approximately 20 m). The higher density of spawning dens (1.08ha−1) was found in a surveyed area of 50.14ha located in the northeastern part of the northern Cíes Island. We propose to protect the area comprised from Punta Escodelo to Punta Ferreiro between 5 and 30 m depth. This area has a surface of 158 ha equivalent to 5.98% of the total marine area of the Cíes islands. The strengths and weaknesses of a management strategy based on the protection of the species’ spawning habitat are discussed.