3 resultados para Reliability, rehydration, exercise, diuresis
em Universidade do Minho
Resumo:
Despite the extensive research that has been conducted on the debonding behaviour of FRP strengthening systems, no standard methodology has been yet established on its experimental characterization. In this context, to assess the performance and reliability of small scale testing on NSM (near surface mounted) FRP strengthening systems, an experimental program was carried out on a series of nine NSM FRP strengthening systems, in the framework of an international Round Robin Testing (RRT). Eleven laboratories and seven manufacturers and suppliers participated in this extensive international exercise, which regarded both NSM and EBR FRP strengthening systems. Test results obtained for the NSM systems by the participating laboratories are discussed and compared in this paper to investigate the feasibility of the adopted single/double pulling shear test method, to investigate the mechanism of bond between NSM FRP reinforcement and concrete, and to investigate the level of variability obtained between the participating laboratories testing the same material batches. It is concluded that the tested variants in the adopted single/double shear pulling test have a significant influence, stressing the importance of the level of detail of standardized test protocols for bond verification. On overall, given the variants included in this study, the obtained variation in bond stress-slip behaviour between the laboratories remained fairly limited.
Resumo:
The Prognostic Health Management (PHM) has been asserting itself as the most promising methodology to enhance the effective reliability and availability of a product or system during its life-cycle conditions by detecting current and approaching failures, thus, providing mitigation of the system risks with reduced logistics and support costs. However, PHM is at an early stage of development, it also expresses some concerns about possible shortcomings of its methods, tools, metrics and standardization. These factors have been severely restricting the applicability of PHM and its adoption by the industry. This paper presents a comprehensive literature review about the PHM main general weaknesses. Exploring the research opportunities present in some recent publications, are discussed and outlined the general guide-lines for finding the answer to these issues.
Resumo:
Dissertação de mestrado integrado em Materials Engineering