4 resultados para Port Dalhousie Thorold Railway Company

em Universidade do Minho


Relevância:

20.00% 20.00%

Publicador:

Resumo:

Earthworks involve the levelling or shaping of a target area through the moving or processing of the ground surface. Most construction projects require earthworks, which are heavily dependent on mechanical equipment (e.g., excavators, trucks and compactors). Often, earthworks are the most costly and time-consuming component of infrastructure constructions (e.g., road, railway and airports) and current pressure for higher productivity and safety highlights the need to optimize earthworks, which is a nontrivial task. Most previous attempts at tackling this problem focus on single-objective optimization of partial processes or aspects of earthworks, overlooking the advantages of a multi-objective and global optimization. This work describes a novel optimization system based on an evolutionary multi-objective approach, capable of globally optimizing several objectives simultaneously and dynamically. The proposed system views an earthwork construction as a production line, where the goal is to optimize resources under two crucial criteria (costs and duration) and focus the evolutionary search (non-dominated sorting genetic algorithm-II) on compaction allocation, using linear programming to distribute the remaining equipment (e.g., excavators). Several experiments were held using real-world data from a Portuguese construction site, showing that the proposed system is quite competitive when compared with current manual earthwork equipment allocation.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

This article presents a work performed in the maintenance department of a furniture company in Portugal, in order to develop and implement autonomous maintenance. The main objective of the project was related to the objective to increase and make effective the autonomous maintenance tasks performed by production operators, and in this way avoiding unplanned downtime due to equipment failures. Although some autonomous maintenance tasks were already carried out within the company, a preliminary study revealed weaknesses in the application of this tool. In the initial phase of this pilot project, the main problems encountered at the level of autonomous maintenance were related to the lack of time to carry out these tasks, showing that the stipulated procedures were far from the real needs of the company. To solve these problems a pilot project was conducted, making several changes in the performance of autonomous maintenance tasks, making them standard and adapted to reality of each production line. There was a general improvement in the factory indicators, and essentially there was a behavioral change, since the operators felt that their opinions were taking into account and began to understand the importance of small tasks performed by them.

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Relatório de estágio de mestrado em Negócios Internacionais

Relevância:

20.00% 20.00%

Publicador:

Resumo:

Dissertação de mestrado em Tradução e Comunicação Multilingue