5 resultados para Plantation owners

em Universidade do Minho


Relevância:

10.00% 10.00%

Publicador:

Resumo:

Despite improvements over the years, accidents continue to be a scourge in the construction sector, leading to an increase in the number of journal articles addressing the issue, in an attempt to help construction industry to increase safety performance [1]. This paper aims to, helping construction industry and particulary tunneling community, describe the Portuguese approach to most typical health and safety problems in underground excavations performed with the Sequential Excavation Method (SEM). The article will address various topics, from safety management and organizational practices, to collective and personal protection equipment, to emergency planning. nt problems in safety and health matters are similar to several other countries, the paper will expose a compilation of Portuguese best practices used to solve that problems. This enunciation of best practices describes experience from most important and recognized Project Owners and Contractors in Portugal. In a second phase it will be analysed Portuguese weaknesses, identifying preventive measures, and their comparative importance, that should be adopted in Portugal in order to reduce accidents and health diseases.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

Dissertação de mestrado integrado em Arquitectura

Relevância:

10.00% 10.00%

Publicador:

Resumo:

COST Action TU1406 aims to address the European economic and societal needs by standardizing the condition assessment and maintenance level of roadway bridges. Currently, bridge quality control plans vary from country to country and, in some cases, within the same country. This therefore urges the establishment of a European guideline to surpass the lack of a standard methodology to assess bridge condition and to define quality control plans for roadway bridges. Such a guideline will comprise specific recommendations for assessing performance indicators as well as for the definition of performance goals, bringing together different stakeholders (e.g. universities, institutes, operators, consultants and owners) from various scientific disciplines (e.g. on-site testing, visual inspection, structural engineering, sustainability, etc.) in order to establish a common transnational language. COST Action TU1406 Workshops aim to facilitate the exchange of ideas and experiences between active researchers and practitioners as well as to stimulate discussions on new and emerging issues in line with the conference topics. This first Workshop essentially focuses on WG1 issues, namely, intends to address performance indicators, how these are assessed (e.g. visual inspection, nondestructive tests and monitoring systems), with what frequency and what values are generally obtained. The main outcomes, given in this eBook, were really important, not only for WG1 developments, but also for all the other WGs and for the Action itself.

Relevância:

10.00% 10.00%

Publicador:

Resumo:

According to the latest census (2011) covering the Portuguese housing stock, there is a considerable number of sub-occupied buildings and most of them were built before the first Portuguese Thermal Code (RCCTE). In view of the objectives of the European Union (20-20-20), it is necessary to contribute to the rehabilitation of existing buildings by promoting the densification of oversized houses, while complying with up-to-date comfort standards and codes. In this sense, this research is aimed to analyse this problem at the outskirts of Braga, by identifying the type-morphology of oversized buildings, assessing the degree of satisfaction and expectations of both owners and inhabitants and developing and testing a systematic design tool. Through the development of an intervention kit, wich systematizes and priorizes design strategies and solutions, the design team can have the necessary decision-making support tool to improve the spacial design of the building whilst considering energy efficency, sustainability and improvemente of interior environmental quality.