6 resultados para LIMIT CYCLE WALKING
em Universidade do Minho
Resumo:
Nowadays, the concrete production sector is challenged by attempts to minimize the usage of raw materials and energy consumption, as well as by environmental concerns. Therefore, it is necessary to choose better options, e.g. new technologies or materials with improved life-cycle performance. One solution for using resources in an efficient manner is to close the materials' loop through the recycling of materials that result either from the end-of-life of products or from being the by-product of an industrial process. It is well known that the production of Portland cement, one of the materials most used in the construction sector, has a significant contribution to the environmental impacts, mainly related with carbon dioxide emission. Therefore, the study and utilization of by-products or wastes usable as cement replacement in concrete can supply more sustainable options, provided that these type of concrete produced has same durability and equivalent quality properties as standard concrete. This work studied the environmental benefits of incorporating different percentages of two types of fly ashes that can be used in concrete as cement replacement. These ashes are waste products of power and heat production sectors using coal or biomass as fuels. The results showed that both ashes provide a benefit for the concrete production both in terms of environmental impact minimization and a better environmental performance through an increase in cement replacement. It is possible to verify that the incorporation of fly ashes is a sustainable option for cement substitution and a possible path to improve the environmental performance of the concrete industry.
Resumo:
A Zero waste management is believed to be one of methods to gain sustainability in urban areas. Take advantages of resources as enough as the needs and process it until the last part to be wasted is a contribution to take care the environment for the next generation. Reduce, reuse, and recycle are three simplesactivities which are until nowadays consideredas the back bone of zero waste. Jonggolgreen city is a new urban area in Indonesia with a 100 ha of surface area zoned as education tourism area. It is an independent area with pure natural resources of water, air, and land to be managed and protected. It is planned as green city through zero waste management since2013. In this preliminary period, a monitoring tool is being prepared by applying a Life Cycle Analysis (LCA) for urban areas [1]. This paper will present an explanatory assessment ofthe zero waste management for Jonggolgreen city. The existing situation will be examined through LCA and afterwards,the new program and the proposed green design to gain the next level of zero waste will be discussed. The purpose is to track the persistence of the commitment and the perception of the necessary innovationsin order to achieve the ideal behavior level of LCA.
Resumo:
[Excerpt] Synchronization of periodic movements like side-by-side walking [7] is frequently modeled by coupled oscillators [5] and the coupling strength is defined quantitatively [3]. In contrast, in most studies on sensorimotor synchronization (SMS), simple movements like finger taps are synchronized with simple stimuli like metronomes [4]. While the latter paradigm simplifies matters and allows for the assessment of the relative weights of sensory modalities through systematic variation of the stimuli [1], it might lack ecological validity. Conversely, using more complex movements and stimuli might complicate the specification of mechanisms underlying coupling. We merged the positive aspects of both approaches to study the contribution of auditory and visual information on synchronization during side-by-side walking. As stimuli, we used Point Light Walkers (PLWs) and auralized steps sound; both were constructed from previously captured walking individuals [2][6]. PLWs were retro-projected on a screen and matched according to gender, hip height, and velocity. The participant walked for 7.20m side by side with 1) a PLW, 2) steps sound, or 3) both displayed in temporal congruence. Instruction to participants was to synchronize with the available stimuli. [...]
Resumo:
During the recent years followed by the Global Financial Crisis (GFC), most of business and industries around the globe have been hardly hit to the limit that it still struggling to survive, suffering from the crisis financial consequences. For instance, in the construction industry; many construction projects have been suspended or totally cancelled. Nevertheless, among this dilemma, a call has been raised to use the sustainable practices to mitigate the effects of the GFC on construction industry. For the first look, it seems that there is contradiction since the sustainable solutions are often associated with an increase in the initial cost, undoubtedly, the sustainable practices have many advantages in both economic and environment aspects, however, the question which needs to be addressed here is, to what extent using such sustainable practices can mitigate the negative effects of the economic downturn on construction industry. Therefore, it is a challenging argument for using such sustainable construction from its economic perspective, however, this paper is aiming to present the economical benefits of sustainable practices in construction industry, and trying to clear the doubt of the high initial costs of the sustainable construction through studying the life cycle benefit of green building.
Resumo:
The building sector is one of the Europeâ s main energy consumer, making buildings an important target for a wiser energy use, improving indoor comfort conditions and reducing the energy consumption. To achieve the European Union targets for energy consumption and carbon reductions it is crucial to act in new, but also in existing buildings, which constitute the majority of the building stock. In existing buildings, the significant improvement of their efficiency requires important investments. Therefore, costs are a major concern in the decision making process and the analysis of the cost effectiveness of the interventions is an important path in the guidance for the selection of the different renovation scenarios. The Portuguese thermal legislation considers the simple payback method for the calculations of the time for the return of the investment. However, this method does not take into consideration inflation, cash flows and cost of capital, as well as the future costs of energy and the building elements lifetime as it happens in a life cycle cost analysis. In order to understand the impact of the economic analysis method used in the choice of the renovation measures, a case study has been analysed using simple payback calculations and life cycle costs analysis. Overall results show that less far-reaching renovation measures are indicated when using the simple payback calculations which may be leading to solutions less cost-effective in a long run perspective.
Resumo:
The MAP-i Doctoral Programme in Informatics, of the Universities of Minho, Aveiro and Porto