13 resultados para ICT Project Portfolio Management
em Universidade do Minho
Resumo:
During recent decades it has been possible to identify several problems in construction industry project management, related with to systematic failures in terms of fulfilling its schedule, cost and quality targets, which highlight a need for an evaluation of the factors that may cause these failures. Therefore, it is important to understand how project managers plan the projects, so that the performance and the results can be improved. However, it is important to understand if other areas beyond cost and time management that are mentioned on several studies as the most critical areas, receive the necessary attention from construction project managers. Despite the cost and time are the most sensitive areas/fields, there are several other factors that may lead to project failure. This study aims at understand the reasons that may cause the deviation in terms of cost, time and quality, from the project management point of view, looking at the knowledge areas mentioned by PMI (Project Management Institute).
Resumo:
Risk management is an important component of project management. Nevertheless, such process begins with risk assessment and evaluation. In this research project, a detailed analysis of the methodologies used to treat risks in investment projects adopted by the Banco da Amazonia S.A. was made. Investment projects submitted to the FNO (Constitutional Fund for Financing the North) during 2011 and 2012 were considered for that purpose. It was found that the evaluators of this credit institution use multiple indicators for risk assessment which assume a central role in terms of decision-making and contribute for the approval or the rejection of the submitted projects; namely, the proven ability to pay, the financial records of project promotors, several financial restrictions, level of equity, level of financial indebtedness, evidence of the existence of a consumer market, the proven experience of the partners/owners in the business, environmental aspects, etc. Furthermore, the bank has technological systems to support the risk assessment process, an internal communication system and a unique system for the management of operational risk.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
This paper proposes a smart battery charging strategy for Electric Vehicles (EVs) targeting the future smart homes. The proposed strategy consists in regulate the EV battery charging current in function of the total home current, aiming to prevent overcurrent trips in the main switch breaker. Computational and experimental results were obtained under real-time conditions to validate the proposed strategy. For such purpose was adapted a bidirectional EV battery charger prototype to operate in accordance with the aforementioned strategy. The proposed strategy was validated through experimental results obtained both in steady and transient states. The results show the correct operation of the EV battery charger even under heavy load variations.
Resumo:
This paper presents a framework of competences developed for Industrial Engineering and Management that can be used as a tool for curriculum analysis and design, including the teaching and learning processes as well as the alignment of the curriculum with the professional profile. The framework was applied to the Industrial Engineering and Management program at University of Minho (UMinho), Portugal, and it provides an overview of the connection between IEM knowledge areas and the competences defined in its curriculum. The framework of competences was developed through a process of analysis using a combination of methods and sources for data collection. The framework was developed according to four main steps: 1) characterization of IEM knowledge areas; 2) definition of IEM competences; 3) survey; 4) application of the framework at the IEM curriculum. The findings showed that the framework is useful to build an integrated vision of the curriculum. The most visible aspect in the learning outcomes of IEM program is the lack of balance between technical and transversal competences. There was not almost any reference to the transversal competences and it is fundamentally concentrated on Project-Based Learning courses. The framework presented in this paper provides a contribution to the definition of IEM professional profile through a set of competences which need to be explored further. In addition, it may be a relevant tool for IEM curriculum analysis and a contribution for bridging the gap between universities and companies.
Resumo:
Peer-to-Peer (P2P) is nowadays a widely used paradigm underpinning the deployment of several Internet services and applications. However, the management of P2P traffic aggregates is not an easy task for Internet Service Providers (ISPs). In this perspective, and considering an expectable proliferation in the use of such ap- plications, future networks require the development of smart mechanisms fostering an easier coexistence between P2P applications and ISP infrastructures. This paper aims to contribute for such research efforts presenting a framework incorporating useful mechanisms to be activated by network administrators, being also able to operate as an automated management tool dealing with P2P traffic aggregates.
Resumo:
The production of nanotechnology-based products is increasing, along with the conscience of the possible harmful effects of some nanomaterials. The “safety-by-design” approaches are getting attention as helpful tools to develop safer products and production processes. The Systematic Design Analysis Approach could help to identify the solutions to control the workplace risks by defining the emission and exposure scenarios and the possible barriers to interrupt them. By applying this approach in a photocatalytic ceramic tiles development project it was possible to identify relevant nanoparticles emission scenarios and related barriers, and defining possible ways to reduce it.
Resumo:
This article compiles the main topics addressed by management systems (MSs) literature concerningMSs integration by performing a systematic literature review. In this paper, it is intended to present themain limitations of non-integratedmanagement systems (IMSs), the main motivations driving an IMS implementation, the major resistances faced, the most common resultant benefits, the suitable guidelines and standards and the critical success factors. In addition, this paper addresses the issues concerning integration strategies and models, the integration levels or degrees achieved by an IMS and the audit function in an integrated context. The motivations that drive companies to integrate their management subsystems, the obstacles faced and the benefits collected may have internal or external origins. The publishing of standards guiding companies on how to integrate their management subsystems has been done mainly at a national level. There are several models that could be used in order to support companies in their management subsystems integration processes, and a sequential or an all-in strategy may be adopted. Four audit typologies can be distinguished, and the adoption of any of these typologies should consider resource availability and audit team know-how, among other features.
Resumo:
Maturity models are adopted to minimise our complexity perception over a truly complex phenomenon. In this sense, maturity models are tools that enable the assessment of the most relevant variables that impact on the outputs of a specific system. Ideally a maturity model should provide information concerning the qualitative and quantitative relationships between variables and how they affect the latent variable, that is, the maturity level. Management systems (MSs) are implemented worldwide and by an increasing number of companies. Integrated management systems (IMSs) consider the implementation of one or several MSs usually coexisting with the quality management subsystem (QMS). It is intended in this chapter to report a model based on two components that enables the assessment of the IMS maturity, considering the key process agents (KPAs) identified through a systematic literature review and the results collected from two surveys.
Resumo:
Increasing the maturity in Project Management (PM) has become a goal for many organizations, leading them to adopt maturity models to assess the current state of its PM practices and compare them with the best practices in the industry where the organization is inserted. One of the main PM maturity models is the Organizational Project Management Maturity Model (OPM3®), developed by the Project Management Institute. This paper presents the Information Systems and Technologies organizations outcome analysis, of the assesses made by the OPM3® Portugal Project, identifying the PM processes that are “best” implemented in this particular industry and those in which it is urgent to improve. Additionally, a comparison between the different organizations’ size analyzed is presented.
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação
Resumo:
Dissertação de mestrado integrado em Engenharia e Gestão de Sistemas de Informação
Resumo:
The selection of spawning habitat of a population of Octopus vulgaris that is subject to a small-scale exploitation was studied in the Cíes Islands within the National Park of the Atlantic Islands of Galicia (NW Spain). The technique used was visual censuses by scuba diving. We conducted 93 visual censuses from April 2012 to April 2014. The total swept area was 123.69 ha. Habitat features (season, depth, zone, bottom temperature, swept area, bottom substrate type, and creels fishing impact) were evaluated as predictors of the presence/absence of spawning dens using GAM models. O. vulgaris has a noteworthy preference for spawning in areas with hard bottom substrate and moderate depth (approximately 20 m). The higher density of spawning dens (1.08ha−1) was found in a surveyed area of 50.14ha located in the northeastern part of the northern Cíes Island. We propose to protect the area comprised from Punta Escodelo to Punta Ferreiro between 5 and 30 m depth. This area has a surface of 158 ha equivalent to 5.98% of the total marine area of the Cíes islands. The strengths and weaknesses of a management strategy based on the protection of the species’ spawning habitat are discussed.