Resumo:
This paper presents part of a study aimed at finding a suitable, yet cost-effective, surface finish for a steel structure subject to the car washing environment and corrosive chemicals. The initial, life cycle and average equivalent annual (AEAC) costs for surface finishing methods were calculated for a steel structure using the LCCC algorithm developed by American Galvanizers Association (AGA). The cost study consisted of 45 common surface finish systems including: hot-dip galvanization (HDG), metallization, acrylic, alkyd and epoxy as well as duplex coatings such as epoxy zinc and inorganic zinc (IOZ). The results show that initial, life cycle and AEAC costs for hot dip galvanization are the lowest among all the other methods, followed by coal tar epoxy painting. The annual average cost of HDG for this structure was estimated about €0.22/m2, while the other cost-effective alternatives were: IOZ, polyurea, epoxy waterborne and IOZ/epoxy duplex coating.
Resumo:
Project Management involves onetime endeavors that demand for getting it right the first time. On the other hand, project scheduling, being one of the most modeled project management process stages, still faces a wide gap from theory to practice. Demanding computational models and their consequent call for simplification, divert the implementation of such models in project management tools from the actual day to day project management process. Special focus is being made to the robustness of the generated project schedules facing the omnipresence of uncertainty. An "easy" way out is to add, more or less cleverly calculated, time buffers that always result in project duration increase and correspondingly, in cost. A better approach to deal with uncertainty seems to be to explore slack that might be present in a given project schedule, a fortiori when a non-optimal schedule is used. The combination of such approach to recent advances in modeling resource allocation and scheduling techniques to cope with the increasing flexibility in resources, as can be expressed in "Flexible Resource Constraint Project Scheduling Problem" (FRCPSP) formulations, should be a promising line of research to generate more adequate project management tools. In reality, this approach has been frequently used, by project managers in an ad-hoc way.
Resumo:
In recent decades, an increased interest has been evidenced in the research on multi-scale hierarchical modelling in the field of mechanics, and also in the field of wood products and timber engineering. One of the main motivations for hierar-chical modelling is to understand how properties, composition and structure at lower scale levels may influence and be used to predict the material properties on a macroscopic and structural engineering scale. This chapter presents the applicability of statistic and probabilistic methods, such as the Maximum Likelihood method and Bayesian methods, in the representation of timber’s mechanical properties and its inference accounting to prior information obtained in different importance scales. These methods allow to analyse distinct timber’s reference properties, such as density, bending stiffness and strength, and hierarchically consider information obtained through different non, semi or destructive tests. The basis and fundaments of the methods are described and also recommendations and limitations are discussed. The methods may be used in several contexts, however require an expert’s knowledge to assess the correct statistic fitting and define the correlation arrangement between properties.